Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.4 L | 1 | Accepted-Finance FOUND ELIGIBLE |
| 2 | 2₹1.4 L+₹600 (0.44%)Accepted-Finance BHAGWATI NAGAR JAMMU | ₹1.4 L+₹600 (0.44%) | 2 | Accepted-Finance FOUND ELIGIBLE |
| 3 | 3₹1.4 L+₹1,100 (0.80%)Accepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.4 L+₹1,100 (0.80%) | 3 | Accepted-Finance FOUND ELIGIBLE |
| 4 | Not Admitted-Fee/PreQual/Technical JAMMU AND KASHMIR | - | - | Not Admitted-Fee/PreQual/Technical Others-CDR not uploaded |
| Sl No | Description | Qty | Unit | PERFECT ELECTRICAL WORKS L1 | Shivam enterprises L2 | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repairs to 150 KVA voltage stabilizer at LIS Kot . The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coils. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of copper wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (2 no.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 140 litre T.oil in stablizer after heating of the T.oil. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. Complete Job. | 1 | Job | 2,770 ₹1,35,730 Lowest | 1,379 ₹1,36,521 | 1,390 ₹1,37,610 |
Tender Value
₹1.4 L
EMD Value
₹2,780
Closing Date
1 Jun 2026, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair to 150 KVA Voltage Stabilizer at LIS Kot
2026_IFC_310755_1
MID/AN/14
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹2,780
Executive Engineer MID Akhnoor/Nowshera
8 Jun 2026
23 May 2026
2 Jun 2026
23 May 2026
1 Jun 2026
25 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to 150 KVA voltage stabilizer at LIS Kot . The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coils. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of copper wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (2 no.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 140 litre T.oil in stablizer after heating of the T.oil. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. Complete Job. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_1005146.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .