Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance Lowest rate tenderer |
| 2 | L2₹1.7 CrAccepted-Finance NO 7 V V KOIL STREET OPP TO MEPZ TAMBARAM SANATORIUM CHENNAI 600 045 | CHENGALPATTU | TAMIL NADU | 600045 | ₹1.7 Cr | L2 | Accepted-Finance Highest rate tenderer |
| 3 | L3₹1.8 CrAccepted-Finance | ₹1.8 Cr | L3 | Accepted-Finance Highest rate tenderer |
| 4 | L4₹1.8 CrAccepted-Finance CHENNAI 600 035 | CHENNAI | CHENNAI | TAMIL NADU | 600035 | ₹1.8 Cr | L4 | Accepted-Finance Highest rate tenderer |
| 5 | L5₹1.8 CrAccepted-Finance NO 2 21 MAPPEDU VILLAGE POST THIRUVALLUR TALUK THIRUVALLUR DISTRICT 631 402 | THIRUVALLUR | TAMIL NADU | 631402 | ₹1.8 Cr | L5 | Accepted-Finance Highest rate tenderer |
| Sl No | Description | Qty | Unit | P.MANOHARAN L4 | M.M. ENGINEERS L5 | M/s. Sree Guru Construction L3 | Wings Brand Activations (I) Pvt Ltd L1 | AMD OVERSEAS IMPEX INDIA PRIVATE LIMITED L7 | BLESSO CONSTRUCTIONS L6 | Udayam Engineers and Builders Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils (including refilling)
a) 0 to 2 mt. | 35.6 | 1 Cum | 250 ₹8,900 | 300 ₹10,680 | 300 ₹10,680 | 255 ₹9,078 | 306.97 ₹10,928.13 | 300 ₹10,680 | 245 ₹8,722 |
| 2.00 | b. 2 to 3 mt. | 5.4 | 1 Cum | 275 ₹1,485 | 300 ₹1,620 | 315 ₹1,701 | 175 ₹945 | 320.97 ₹1,733.24 | 320 ₹1,728 | 256 ₹1,382.40 |
| 3.00 | Supplying and filling in foundation and basement with crushed stone sand in layers of 150 mm thickness | 2.7 | 1 Cum | 1,750 ₹4,725 | 1,800 ₹4,860 | 2,100 ₹5,670 | 1,300 ₹3,510 | 50.44 ₹136.19 | 2,150 ₹5,805 | 1,722 ₹4,649.40 |
| 4.00 | Supply and filling in foundation and basement with Stonedust in layers of 150mm thickness | 2.7 | 1 Cum | 350 ₹945 | 300 ₹810 | 320 ₹864 | 1,300 ₹3,510 | 50.44 ₹136.19 | 325 ₹877.50 | 260 ₹702 |
| 5.00 | Plain cement concrete 1:5:10 for Foundation & Basement | 2.7 | 1 Cum | 4,700 ₹12,690 | 5,000 ₹13,500 | 5,000 ₹13,500 | 5,600 ₹15,120 | 5,750 ₹15,525 | 5,700 ₹15,390 | 4,597 ₹12,411.90 |
| 6.00 | Providing and laying in position, Standardised Concrete Mix M-30 Grade
a. In Foundation and basement | 5.2 | 1 Cum | 8,000 ₹41,600 | 8,500 ₹44,200 | 9,000 ₹46,800 | 7,200 ₹37,440 | 9,700 ₹50,440 | 9,000 ₹46,800 | 7,730 ₹40,196 |
| 7.00 | b. In Ground Floor | 2.9 | 1 Cum | 8,300 ₹24,070 | 8,500 ₹24,650 | 9,000 ₹26,100 | 7,600 ₹22,040 | 9,800 ₹28,420 | 9,200 ₹26,680 | 7,854 ₹22,776.60 |
| 8.00 | c. In First Floor | 36.9 | 1 Cum | 8,600 ₹3.2 L | 8,650 ₹3.2 L | 9,000 ₹3.3 L | 7,900 ₹2.9 L | 10,127 ₹3.7 L | 9,400 ₹3.5 L | 8,100 ₹3.0 L |
| 9.00 | d. In Second Floor | 139.7 | 1 Cum | 8,860 ₹12.4 L | 8,650 ₹12.1 L | 9,000 ₹12.6 L | 8,100 ₹11.3 L | 9,200 ₹12.9 L | 9,500 ₹13.3 L | 8,343 ₹11.7 L |
| 10.00 | e. In Third floor | 26 | 1 Cum | 9,135 ₹2.4 L | 8,600 ₹2.2 L | 9,000 ₹2.3 L | 8,500 ₹2.2 L | 9,900 ₹2.6 L | 9,800 ₹2.5 L | 8,588 ₹2.2 L |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
28 Apr 2026, 6:00 pmClosed
Superintending Engineer / CC
No.132, E.V.R.Salai, Kilpauk, Chennai-10
Construction of Additional Rooms and Refurbishment for Indian Forest Service Mess at Velachery in Chennai city
2026_TNPHC_675743_1
SE/CC/DB/903/2026
Open Tender
Civil Works
180 days
Velachery in Chennai city
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹1.2 L
19 May 2026
16 Apr 2026
30 Apr 2026
16 Apr 2026
28 Apr 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth work excavation in all soils (including refilling)
a) 0 to 2 mt. | - | 1 Cum | - | - | |
b. 2 to 3 mt. | - | 1 Cum | - | - | |
Supplying and filling in foundation and basement with crushed stone sand in layers of 150 mm thickness | - | 1 Cum | - | - | |
Supply and filling in foundation and basement with Stonedust in layers of 150mm thickness | - | 1 Cum | - | - | |
Plain cement concrete 1:5:10 for Foundation & Basement | - | 1 Cum | - | - | |
Providing and laying in position, Standardised Concrete Mix M-30 Grade
a. In Foundation and basement | - | 1 Cum | - | - | |
b. In Ground Floor | - | 1 Cum | - | - | |
c. In First Floor | - | 1 Cum | - | - | |
d. In Second Floor | - | 1 Cum | - | - | |
e. In Third floor | - | 1 Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_812135.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
TenderdocumentstFRS.pdf
Tender Documents • 6.58 MB
BOQ_812135.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid