Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹39.1 L+₹0.09 (<0.01%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹41.2 L+₹2.1 L (5.47%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹45.0 L+₹5.9 L (15.1%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹47.9 L+₹8.8 L (22.6%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TL CONSTUCTION COMPANY L2 | M/S RINCHEN INFRATECH L1 | zilldaar engineering construction pvt ltd L3 | M/S SANGAY DAWA GOVT CONTRACTOR L6 | M/S DEMAZONG ENTERPRISE L4 | M/S MH ENETERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and cutting of existing piping and making it winter friendly at Type-1 & Type-2 Officers Quarter (LPDC), Choglamsar, Leh | 21 | cum | 2,971.42 ₹62,399.82 | 2,971.42 ₹62,399.82 | 1,200 ₹25,200 Lowest | 3,000 ₹63,000 | 3,000 ₹63,000 | 2,000 ₹42,000 |
| 2.00 | Supply, Installation, Testing, Commissioning & Transportation of 200 LPD Solar Water Heating Systems at Type-1 & Type-2 Officers Quarter (LPDC), Choglamsar, Leh | 9 | No | 33,000.01 ₹2,97,000.09 | 33,000 ₹2,97,000 | 35,000 ₹3,15,000 | 50,000 ₹4,50,000 | 30,000 ₹2,70,000 Lowest | 70,000 ₹6,30,000 |
| 3.00 | Installation of 25mm PPR (thermal) piping and Solar Water Heater interconnecting piping (including all required connection accessories) upto hot water service point and cold water inlet point (from cold water tanl‹ to Solar Water Heater inlet point) and Air vent pipe
Layer-1: Aluminium Foil Cladding
Layer-2: Heat Trace Cable
Layer-3: Nitrite Rubber Sheet
Layer-4: Cellotape
Layer-5: Chicken Mesh
Layer-6: Aluminium Cladding | 9 | No | 56,000 ₹5,04,000 | 56,000 ₹5,04,000 | 55,000 ₹4,95,000 | 25,000 ₹2,25,000 | 5,500 ₹49,500 Lowest | 1,70,000 ₹15,30,000 |
| 4.00 | Providing and fixing inslulation of pipes with layer of foam insulation (50mm thick) of make K-Flex of equivaluent with protective outer layer. all job complete including heat tape ( interconnecting pipes of Solar Water Heater & air vent pipe) | 300 | m | 2,800 ₹8,40,000 | 2,800 ₹8,40,000 | 2,500 ₹7,50,000 | 2,500 ₹7,50,000 | 3,500 ₹10,50,000 | 300 ₹90,000 Lowest |
| 5.00 | Providing & fixing insulation of water tank with a layer of insulating layer (glass wool 50 mm thick ) of makeas approved by engineer n charge along with an outer covering of aluminium sheet, with all necessary fittings.All job complete | 18 | per tank | 28,000.01 ₹5,04,000.18 | 28,000.01 ₹5,04,000.18 | 52,000 ₹9,36,000 | 52,000 ₹9,36,000 | 3,500 ₹63,000 Lowest | 50,000 ₹9,00,000 |
| 6.00 | Pipe Insulation for existing PPR Piping from Hot Water Service point and Cold Water Tank upto Bathroom/Toilet Inlet Point:
Layer-1: Aluminium Foil Cladding
Layer-2: Heat Trace Cable/heat tape
Layer-3: Nitrite Rubber Sheet
Layer-4: Brown Cellotape | 1,000 | m | 1,700 ₹17,00,000 | 1,700 ₹17,00,000 | 1,600 ₹16,00,000 Lowest | 2,750 ₹27,50,000 | 3,000 ₹30,00,000 | 1,600 ₹16,00,000 Lowest |
Tender Value
Refer Docs
Closing Date
18 Oct 2025, 4:00 pmClosed
Executive Engineer, Civil Division-II PDC Choglams
xecutive Engineer, Civil Division-II PDC Choglams
Providing solar water heater including complete insulation of storage tanks and pipe systems of newly constructed 2 Nos 2BHK and 1 No 1BHK staff quarter at Choglamsar Leh
2025_PDNRE_17656_1
NIT-19-CD-II/PDC/L/2025-26
Open Tender
Civil Works - Others
Item Rate
62 days
Choglamsar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Payable To Pay and Accounts Officer PDC Leh
Exempted
25 Oct 2025
4 Oct 2025
20 Oct 2025
4 Oct 2025
18 Oct 2025
4 Oct 2025
Amount
Dismantling and cutting of existing piping and making it winter friendly at Type-1 & Type-2 Officers Quarter (LPDC), Choglamsar, Leh
Supply, Installation, Testing, Commissioning & Transportation of 200 LPD Solar Water Heating Systems at Type-1 & Type-2 Officers Quarter (LPDC), Choglamsar, Leh
Installation of 25mm PPR (thermal) piping and Solar Water Heater interconnecting piping (including all required connection accessories) upto hot water service point and cold water inlet point (from cold water tanl‹ to Solar Water Heater inlet point) and Air vent pipe Layer-1: Aluminium Foil Cladding Layer-2: Heat Trace Cable Layer-3: Nitrite Rubber Sheet Layer-4: Cellotape Layer-5: Chicken Mesh Layer-6: Aluminium Cladding
Providing and fixing inslulation of pipes with layer of foam insulation (50mm thick) of make K-Flex of equivaluent with protective outer layer. all job complete including heat tape ( interconnecting pipes of Solar Water Heater & air vent pipe)
Providing & fixing insulation of water tank with a layer of insulating layer (glass wool 50 mm thick ) of makeas approved by engineer n charge along with an outer covering of aluminium sheet, with all necessary fittings.All job complete
Pipe Insulation for existing PPR Piping from Hot Water Service point and Cold Water Tank upto Bathroom/Toilet Inlet Point: Layer-1: Aluminium Foil Cladding Layer-2: Heat Trace Cable/heat tape Layer-3: Nitrite Rubber Sheet Layer-4: Brown Cellotape
TL CONSTUCTION COMPANY (BID ID -172544)
zilldaar engineering construction pvt ltd (BID ID -172553)
M/S DEMAZONG ENTERPRISE (BID ID -172587)
M/S MH ENETERPRISES (BID ID -172552)
M/S SANGAY DAWA GOVT CONTRACTOR (BID ID -172554)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_42907.xls
BOQ • 0.31 MB
NIT19CORRIGENDUM.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .