| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC N A | ₹3.7 Cr | L1 | Accepted-AOC L-1 |
| 2 | L2₹3.8 Cr+₹13.5 L (3.64%)Rejected-AOC 0 STATION ROAD PARICHHA PARICHHA NEAR BANK OF INDIA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | ₹3.8 Cr+₹13.5 L (3.64%) | L2 | Rejected-AOC L-2 |
Tender Value
Refer Docs
EMD Value
₹7.9 L
Closing Date
25 Jan 2021, 2:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAJARIYA MAHOBA
Construction of Pucca Ghat at right bank of river yamuna at vill. Merapur Bhilawa, Ish Chaitanya Ashram between (Km. 0.200 to 0.700) 50 mtr. Wide in Hamirpur District. (Lot-8)
2021_UPIDC_545719_8
02/SE/2020-21
Open Tender
Civil Works
Item Rate
120 days
HAMIRPUR
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
₹7.9 L
Yes
5 Mar 2021
14 Jan 2021
25 Jan 2021
14 Jan 2021
25 Jan 2021
14 Jan 2021
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (G.S.T. will be paid extra as per rules)
Driving sheet piles including all material labour and T&P etc required for proper complete work
Providing 40mm dia G.I bar for anchoring including all accessories, material, labour and T&P etc complete work
Providing and fixing ISC 250mmx100mmx6.1mm wale for anchoring i/c all accessories, material labour and T&P etc complete work
S/l New E.C bag fille with RBM sowing & tying sutali and placing in nylon crate of size 1.0x1.0x1.0 m for making coffer dam. Including all cost of material labour T&P etc. complete work
Filling earth in coffer dam between E.C. Bag Inculding all lead and lift cost of all material labour T&P etc complete work
Dewatering with 5 Hp deisal pump
Making providing boring of 400 mm dia hole for concrete piling as per drawing and direction of engineer in charge
Providing cutting, bending & binding with G.I wire in position as per drawing reinforcement for RCC work. Inculding cost of all material labour T&P etc
RCC 1:1.5:3 with grit 10-20 mm size and coarse sand including cost of all material, labour, T&P etc.
Providng and laying sand below sloping slab including cost of all material labour T&P etc.
Providing and laying PCC 1:3:6 as lean concrete with hard grit 20-40 mm and corse sand including cost of all material labour & T&P etc.
RCC 1:2:4 with grit 10-20 mm size and coarse sand including cost of all material labour T&P etc.
Providng centering and shuttering for RCC work including cost of all material labour T&P etc
Supply and laying Boulder for Apron including cost of all material labour T&P etc.
Plaster 1:4 cm in steps 20mm thick including cost of all material labour T&P etc.
Providing and laying 50mm thick sand stone size 600x600x50mm on stepes and landing parapet including all cost of material labour and T&P etc complete work in all respect
Providing and fixing 50mm dia PVC Pipe for weep holes
M/S Singh Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .