Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 LAccepted-Finance ALAGAGOUNDANOOR CHAMRAJPET PO METTUR TK SALEM DT | METTUR DAM | SALEM | TAMIL NADU | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹3.9 L+₹31,444 (8.78%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Accepted-Finance Satisfied | |
| 3 | 3₹8.5 L+₹4.9 L (136.8%)Accepted-Finance NO 20 2 G K INDUSTRIAL ESTATE ALAPAKKAM PORUR CHENNAI 600 016 | CHENNAI | CHENNAI | TAMIL NADU | 600016 | 3 | Accepted-Finance Satisfied | |
| 4 | Not Admitted-Fee/PreQual/Technical PLOT NO 35 ARVIND NAGAR CHANDRAPUR MAHARASHTRA 442401 INDIA | CHANDRAPUR | MAHARASHTRA | 442401 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹4,600
Closing Date
30 Mar 2023, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
2023_EB_295596_1
CE / MTPS-I / SE / M-I / BM / OT. 330 / 2022-23
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹4,600
Yes
25 Apr 2023
16 Mar 2023
31 Mar 2023
16 Mar 2023
30 Mar 2023
16 Mar 2023
Amount
Charges for buffing water wall tubes for tube thickness survey
Charges for providing assistance in Boiler tube thickness Survey
Charges for conducting Boiler tube thickness survey
Charges for conducting tube thickness survey by physical verification in boiler 2nd pass and inter pass area, arranging necessary lighting inside the Boiler
Charges for leading, lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area, Eco hanger tube area, Economiser Hopper area and ‘S’ panel area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding.
Charges for cutting removal of shrouding provided on Boiler tubes & bends for identify the tube erosion
Charges for fixing shrouding at erosion prone Boiler tubes & bends by Tac welding.
Hire charges for Ultrosonic thickness guage
SS welding Electrodes
T & Ps consumables as per annexure
THIAGARAJAN ENGINEERING CONTRACTOR
PWHT SOLUTIONS PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .