| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC N A | ₹12.7 L | 1 | Accepted-AOC ok |
| 2 | 2₹14.4 L+₹1.7 L (13.5%)Rejected-Finance MOHAL KHERA | ₹14.4 L+₹1.7 L (13.5%) | 2 | Rejected-Finance ok |
Tender Value
₹21.1 L
EMD Value
₹42,240
Closing Date
30 Jun 2026, 5:00 pmClosed
Narender Singh Suhag
Municipal Council Narwana
REPAIR and PATCH WORKS AT VARIOUS PLACES IN MC NARWANA (Recall)
2026_HRY_530990_1
2026C1DEF7E5 395E 4A31 BCBE AAD51CEA9046301ULB
Open Tender
Civil Works
Works
220 days
Narwana
2 documents required · 2 mandatory
₹1,000
₹42,240
Yes
20 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.77]Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] | 557.28 | Sqm | 637 | ₹3,54,987.36 |
| 2 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 1,100 | Kg. | 83 | ₹91,300 |
| 3 | [17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 113.27 | cum | 1,243 | ₹1,40,794.61 |
| 4 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 557.28 | Sqm | 7 | ₹3,900.96 |
| 5 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 891.65 | Sqm | 26 | ₹23,182.9 |
| 6 | [17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate] | 557.28 | Sqm | 66 | ₹36,780.48 |
| 7 | [17.73]Construction of unreinforced plain cement concrete pavement in M-25 mix design over a prepared sub base with OPC 43 grade conforming to IS:383 mixed with concrete mixer using batch type concrete mixer as per IS:1791, laid in position, compacted with needle vibrator, screed vibrator and plate vibrator, dewatering of free water with vaccum pump, finishing the surface with power floater, finishing to required lines and grades as per drawings and technical clause 1501 of MORTH specifications [Through Rate] | 63.59 | cum | 4,873 | ₹3,09,874.07 |
| 8 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | 228.6 | Metre | 363 | ₹82,981.8 |
| 9 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 15 | Each | 1,155 | ₹17,325 |
| 10 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 148.54 | cum | 202 | ₹30,005.08 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_610036.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .