| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.8 LAccepted-AOC AT GOBINDPUR PO TRIBANPUR PS RAIRAKHOL DIST SAMBALPUR PIN 768106 | SAMBALPUR | ODISHA | 768106 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹44.3 L+₹1.5 L (3.41%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹51.4 L
EMD Value
₹1.0 L
Closing Date
24 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(Civil)
Engineering Section 3rd floor main building Argul Jatni Dist-Khordha Odisha
Annual civil repair and maintenance works of Residential campus at IIT Bhubaneswar, Argul for the year 2026-27
2026_IITBR_897939_1
IITBBS/SE/Engg section/50/2025-26
Open Tender
Civil Works
Works
365 days
Main Building, 3rd floor IIT Bhubaneswar, Argul
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
Engineering Section
8 Apr 2026
10 Feb 2026
25 Feb 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DSR-2023, Item No.2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10 | Cum | 253.27 | ₹2,532.7 |
| 2 | DSR-2023, Item No.2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m andfor all lift. | 5 | Cum | 190.71 | ₹953.55 |
| 3 | DSR-2023, Item No.4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 12 | Cum | 6,628.08 | ₹79,536.96 |
| 4 | DSR-2023, Item No.5.1.3
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | Cum | 8,351.65 | ₹83,516.5 |
| 5 | DSR-2023, Item No.5.1.25
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 5 | Cum | 8,801.51 | ₹44,007.55 |
| 6 | DSR-2023, Item No.5.2.2
Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets, columns,
pillars, piers, abutments, posts and struts etc. above plinth level up to
floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3 | Cum | 10,559.92 | ₹31,679.76 |
| 7 | DSR-2023, Item No.5.9.1
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 10 | Sqm | 381.56 | ₹3,815.6 |
| 8 | DSR-2023, Item No.5.9.3
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. | 10 | Sqm | 902.21 | ₹9,022.1 |
| 9 | DSR-2023, Item No.5.9.5
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 10 | Sqm | 716.52 | ₹7,165.2 |
| 10 | DSR-2023, Item No.5.9.6
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 10 | Sqm | 935.34 | ₹9,353.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.83 MB
BOQ_943830.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .