| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance 7 B CHOKALINGAM STREET SHANMUGAPURAM COLONY VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹12.3 L (11.9%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.2 Cr+₹12.3 L (11.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹12.8 L (12.5%)Admitted-Finance | ₹1.2 Cr+₹12.8 L (12.5%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹14.9 L (14.5%)Admitted-Finance PLOT NO 5 SATHYAM GARDEN UYIRIYAL POONGA ROAD GORIMEDU SALEM 636 008 | SALEM | SALEM | TAMIL NADU | 636008 | ₹1.2 Cr+₹14.9 L (14.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹15.2 L (14.7%)Admitted-Finance KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | ₹1.2 Cr+₹15.2 L (14.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Thulasingam L1 | K DHINAKARAN L2 | M/s.Vetriconstructions L3 | RAJ ENGINEERING CONTRACTOR L4 | C.GOVINDAN L5 | M s Kumaresan and co L6 | JK ENGINEERS L7 | ASAITHAMBI.M L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS | 361.5 | cum | - | - | - | - | - | - | - | - |
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING | 181 | cum | - | - | - | - | - | - | - | - |
| 3.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for MR & DMR NOT Requiring BLASTING | 60.5 | cum | - | - | - | - | - | - | - | - |
| 4.00 | PCC 1:3:6, using 20mm HBG metal foundation/padding including cost of cement, all materials, labour, lead, lift, etc. complete. For transformer plinth | 111 | cum | - | - | - | - | - | - | - | - |
| 5.00 | Laying PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete without form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. | 71 | m3 | - | - | - | - | - | - | - | - |
| 6.00 | Laying PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete with form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. | 399 | m3 | - | - | - | - | - | - | - | - |
| 7.00 | RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal for foundation and culvert and cable duct bottom concrete without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, | 100 | cum | - | - | - | - | - | - | - | - |
| 8.00 | RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for cableduct and culvert side wall | 57 | cum | - | - | - | - | - | - | - | - |
| 9.00 | Plastering with CM 1:3, 12mm thick for ceiling, beams, sunshade and for transformer plinth including cost of all materials, curing, labour, lead, lift, etc., complete. | 292 | sqm | - | - | - | - | - | - | - | - |
| 10.00 | Plastering with CM 1:5, 12mm thick for cable duct including cost of all materials, curing, labour, lead, lift, etc., complete. | 671 | sqm | - | - | - | - | - | - | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
29 Jun 2020, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Providing cable duct, culvert, transformer structural plinth and filling the site with gravel for proposed ThillaiNagar (Vaikkalpattrai 110/22 KV SS
2020_EB_169143_1
TP1-012/2020-21
Open Tender
Civil Works
Works
120 days
salem
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
17 Jul 2020
18 Jun 2020
30 Jun 2020
22 Jun 2020
29 Jun 2020
22 Jun 2020
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for MR & DMR NOT Requiring BLASTING
PCC 1:3:6, using 20mm HBG metal foundation/padding including cost of cement, all materials, labour, lead, lift, etc. complete. For transformer plinth
Laying PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete without form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification.
Laying PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete with form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification.
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal for foundation and culvert and cable duct bottom concrete without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete,
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for cableduct and culvert side wall
Plastering with CM 1:3, 12mm thick for ceiling, beams, sunshade and for transformer plinth including cost of all materials, curing, labour, lead, lift, etc., complete.
Plastering with CM 1:5, 12mm thick for cable duct including cost of all materials, curing, labour, lead, lift, etc., complete.
Plastering with CM 1:5, 20mm thick for brick pillar including cost of all materials, curing, labour, lead, lift, etc., complete.
Colour washing 2 Coats over a base coat of primer using Exterior weather coat using Asian APEX or Equivalent of approved Brand, quality and colour for outer surfaces including cost of all labours to work at all levels cost of materials brushes, scaffolding charges etc. complete complying with standard specification and and as directed by the Engineer-in-charge at site.
Supplying, fabricating in GI angle/flats including cost of MS angle ,Flats , as per drawing and specification and galvanising ,placing in position , including cost of all materials, galvanizing charges , transportation, labour, lead, lift etc complete as directed by the dept. Engr at site
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for Precast cover slab
Providing steel reinforcement using steel of grade Fe 500 for RCC works including cost of steel, binding wire and placing in postion of the steel reinforcement, including cost of all materials, lead, lift, etc., complete.
Refilling the excavated earth including all lead, lift, etc., complete and as directed by the Dept. engineer at site
Removal of excess of excavated earth to a distance of 100 m with all lead, lift, etc., complete
Labour charges for transporting of RCC cover slab from curing tank to duct and fixing in correct position etc., complete.
Supplying and fixing readymade earth collars of size 60 cm inner dia with 30 cm height and shell thickness of 50 mm with cover slab including cost of all materials, transport to site, labour, lead, lift, etc., complete as per standard specification.
Supplying and fixing of 20 mm PVC bib cock including cost of all materials, etc., complete.
Providing and laying PVC high density 10 kg/cm2 pipe including cost of all materials, labour, etc., complete.for 20 MM DIA PVC PIPE
Providing and laying PVC high density 10 kg/cm2 pipe including cost of all materials, labour, etc., complete. For 32mm dia PVC Pipe
Providing and laying PVC high density 10 kg/cm2 pipe including cost of all materials, labour, etc., complete.for 40 MM DIA PVC PIPE
Providing and fixing wheel valve of various diameter of Gun metal leader make of best quality including cost of all materials, labour, lead, lift etc., complete. - 32mm Dia
Providing and fixing wheel valve of various diameter of Gun metal leader make of best quality including cost of all materials, labour, lead, lift etc., complete. - 40mm Dia
Fabriaction, galvanising, supplying and fixing of foundation bolts of various sizes and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Labour charges for fixing of Template including aligining in position including labour lead lift etc., complete. (Template shall be arranged by the contractor at their own cost).
Labour charges for fixing of rails with suitable alignment as per drawing and specification.
Supply of 90 lbs rails in transformer plinth including cost of material and fixing charges etc complete and as directed by the Engineer-in-charge at site.
Supplying, filling & spreading of good quality gravel layer by layer with proper consolidation for substation yard, low lying area, road berms, behind of abutment & wing wall including cost of all materials, labour, lead, lift etc., Complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K DHINAKARAN
M/s.Vetriconstructions
RAJ ENGINEERING CONTRACTOR
C.GOVINDAN
M s Kumaresan and co
JK ENGINEERS
ASAITHAMBI.M
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_202237.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .