Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹6,365.19 (3.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.8 L+₹10,415.77 (6.30%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.8 L+₹12,151.73 (7.36%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹1.9 L+₹22,856.83 (13.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
25 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,WRD
O/o, TheExecutive Engineer, WRD., Periyar Main Canal Division, Melur.
Special repairs to 23A sluice of 9th Distributary in Ambalakaranpatty village in Melur Taluk in Madurai District
2026_WRD_720693_1
08 2026-2027 JDO2 F.105 DATED.02.11.2026
Open Tender
Civil Works
Percentage
90 days
Ambalakaranpatty
4 documents required · 4 mandatory
₹0
₹3,000
25 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of brick or stone masonry in cement Mortar walls under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 1.1 | Cubic Meter | 520.23 | ₹572.25 |
| 2 | Earthwork excavation for foundation Earth work Excavaction for foundation in hard stiff clay,stiff black cotton soil, Hard red earth, shales, murrams, gravel, stoney earth and earth mixed small size blouders and hard grvelly soil depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and deposting the surplus earth in places as shown by the depar tmental offices with an initial lead of 10metres and initial left of 2 metres and clearing, levelling the site etc., complying with standard specification and as directed by the departmental officers. | 2.5 | Cubic Meter | 147.02 | ₹367.55 |
| 3 | Providing and Placing Plain Cement Concrete M15 grade using well graded aggregates of nominal maximum size of 40mm and downgraded to I.S. Specified grading (to achieve the specified characterstics strength of 10N/mm2 in 28 days) andmixing the ingredients in approved mixer including dewatering of the placement site by bailing/pumbing and diverting wharever necessary, placing concrete in layers, watering, curing, finishing the surface with all leads and lifts etc complete as directed by the Engineer in Charge of works and as per the technical specifications. | 0.6 | Cubic Meter | 6,161.9 | ₹3,697.14 |
| 4Supplying and erecting water tight steel centering for sides and soffits including necessary supports and shuttering including strutting for retaining wall and all RCC works such as column, footing, plinth beam, etc., upto 3.29m height and all cross bracings using mild steel BG 10 sheets of size 90cm x 60cm gauge stiffeded with welded mild steel angles of size 25x25x3mm for boarding laid over silver oak ( country wood ) joits of size 10x6.5cm spaced at about 90cm centre to centre and suitably supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre including cost of materials etc., complete complying with standard specification as directed by the departmental officers the payment for centering shall be given after the concrete is laid and the retrived materials should be taken back the contractor | |||||
| 4.01 | Without Strutting | 3.45 | Square Meter | 990.95 | ₹3,418.78 |
| 4.02 | With strutting | 18.5 | Square Meter | 1,098 | ₹20,313 |
| 5 | Cement Concrete of M15 grade using 40% quantity of 20mm size HBG stone jelly and 60% quantity of 40mm HBG stone jelly including curing, finishing, dewatering if found necessary, compacting complying with standard specification. SS 28 as per the technical specifications. | 7.5 | Cubic Meter | 6,494.95 | ₹48,712.13 |
| 6 | Plastering with cement mortar 1:4 (One cement and four P.sand ) 20 mm thick - 10m2 including curing, finishing etc., complete complying with the standard specification | 33.5 | Square Meter | 584.17 | ₹19,569.7 |
| 7 | Supplying and fixing of Head Set Assembly light duty with hexagonal nut (Approximate 50 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assemblyto the work site. Fixing the head set assembly to the top beam by usingrequired rust fre bolts and nuts in proper alignment including dismantling the existing damaged Head set assembly, conveying and stacking at sectio store. The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc.., | 1 | Number | 41,636 | ₹41,636 |
| 8 | Supplying , Laying and fixing in position of R.C.C. Hume pipes of NP3 class of 300mm Dia with suitable collars including labour charges and jointing materials etc., complete complying with standard specification and as directed by the departmental officers complying with standard specification and as directed by the departmental officers | 3.5 | Running Meter | 2,497.17 | ₹8,740.1 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
document89.pdf
Tender Documents • 0.64 MB
BOQ_865436.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .