Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹14.3 LAccepted-AOC AT SAREILO PO TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹14.3 L Quoted ₹12.2 L | L 1 | Accepted-AOC Accepted as L-1 bidder. |
| 2 | L 2₹13.6 LRejected-Finance AT PO BADAJORADA PS BIKRAMPUR TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹13.6 L | L 2 | Rejected-Finance Rejected as L-2 bidder. |
| 3 | L 3₹17.3 LRejected-Finance AT PO TALABEDA KANDHAL TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹17.3 L | L 3 | Rejected-Finance Rejected as L-3 bidder. |
| 4 | L 4₹17.6 LRejected-Finance AT BADAJORADA TALCHER ANGUL ODISHA 759103 | ANUGUL | ODISHA | 759103 | ₹17.6 L | L 4 | Rejected-Finance Rejected as L-4 bidder. |
Tender Value
₹26.6 L
EMD Value
₹33,300
Closing Date
23 Mar 2026, 5:00 pmClosed
ALOK KUMAR, SO(CIVIL), TALCHER AREA, MCL
ALOK KUMAR, O/O STAFF OFFICER (CIVIL), TALCHER AREA, MCL
Repair and maintenance of Haulage building at Nandira colliery, Talcher Area.
2026_MCL_356444_1
MCL/GM(TA)/SO(C)/ e-Tender/25-26/46 dt 12.03.26
Open Tender
Civil Works - Buildings
Percentage
120 days
Nandira Colliery
Please refer Tender documents.
3 documents required · 3 mandatory
₹33,300
11 Jul 2026
12 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
13 Mar 2026 - 16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 235.12 | cum | 217 | ₹51,021.04 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan), including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m,as per directions of Engineer in Incharge. All kinds of soil | 407.3 | cum | 166.05 | ₹67,632.17 |
| 1.03 | Supplying and filling in plinth with river sand under floors, including watering, ramming, consolidating and dressing complete. | 22.71 | cum | 910.15 | ₹20,669.51 |
| 1.04 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.09 | cum | 5,219.9 | ₹1,41,407.09 |
| 1.05 | Providing and laying 60 mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 255.2 | sqm | 832 | ₹2,12,326.4 |
| 1.06 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,475.7 | kg | 124 | ₹1,82,986.8 |
| 1.07 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 5.73 | cum | 1,203.2 | ₹6,894.34 |
| 1.08 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 101.89 | cum | 5,457.4 | ₹5,56,054.49 |
| 1.09 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.69 | cum | 6,667.75 | ₹51,275 |
| 1.1 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 709.56 | sqm | 226.25 | ₹1,60,537.95 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.48 MB
Tendernotice_2.pdf
PDF • 1.66 MB
BOQ_369296.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].