Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.0 LAccepted-Finance | ₹19.0 L | 1 | Accepted-Finance Being L1 |
| 2 | 2₹20.0 L+₹98,431.60 (5.18%)Accepted-Finance | ₹20.0 L+₹98,431.60 (5.18%) | 2 | Accepted-Finance Being L2 |
| 3 | 3₹20.3 L+₹1.3 L (6.75%)Accepted-Finance | ₹20.3 L+₹1.3 L (6.75%) | 3 | Accepted-Finance Being L3 |
| 4 | 4₹20.6 L+₹1.6 L (8.32%)Accepted-Finance | ₹20.6 L+₹1.6 L (8.32%) | 4 | Accepted-Finance Being L4 |
| 5 | 4₹20.6 L+₹1.6 L (8.32%)Accepted-Finance | ₹20.6 L+₹1.6 L (8.32%) | 4 | Accepted-Finance Being L4 |
Tender Value
₹29.8 L
EMD Value
₹59,656
Closing Date
17 Mar 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
AR and MO water supply under SD-V, CD-I, APWD, Rangat. SW-Construction of Earthen Pond near Coir Industry at Sy. No. 24 at Panchawati village - Balance work - in Phase-I
2026_APWD_22233_1
94/DB/CD-I/RGT/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Panchawati
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹59,656
30 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Ordinary rock
Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 0.5 tonne roller, or wooden or steel ramnners, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift:
All kinds of soil
Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
TenderDocument.pdf
Tender Documents • 12.19 MB
BOQ_23538.xls
BOQ • 0.25 MB
Corrigendum999.pdf
PDF • 7.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .