Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 CrAdmitted-Finance | -37.11% | ₹6.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.2 Cr+₹30.5 L (4.42%)Admitted-Finance | -34.33% | ₹7.2 Cr+₹30.5 L (4.42%) | L2 | Admitted-Finance |
| 3 | L3₹7.3 Cr+₹44.3 L (6.42%)Admitted-Finance | -33.07% | ₹7.3 Cr+₹44.3 L (6.42%) | L3 | Admitted-Finance |
| 4 | L4₹7.5 Cr+₹57.5 L (8.35%)Admitted-Finance | -31.86% | ₹7.5 Cr+₹57.5 L (8.35%) | L4 | Admitted-Finance |
| 5 | L5₹7.8 Cr+₹91.4 L (13.3%)Admitted-Finance | -28.77% | ₹7.8 Cr+₹91.4 L (13.3%) | L5 | Admitted-Finance |
Tender Value
₹11.0 Cr
EMD Value
₹21.9 L
Closing Date
13 Mar 2026, 4:00 pmClosed
ER R K Agastam
Office of the Chief Engineer PWD R and B department Jammu Zone Lok Nirman Bhawan Rail Head complex Jammu
refer to BOQ
2026_PWDJK_303925_1
eNIT No.21 of 2025-26 Dated 19.02.2026
Open Tender
Civil Works
Percentage
547 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Chief Accounts Officer PWD R and B Jammu Zone
₹21.9 L
Chief Engineer Office PWD Jammu Zone
1 Apr 2026
19 Feb 2026
14 Mar 2026
20 Feb 2026
13 Mar 2026
20 Feb 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth incl. all leads and lifts as directed by Engineer-in-Charge.All kinds of soil : | 2,625.89 | Cum | 187.3 | ₹4,91,829.2 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil | 81 | Cum | 89.75 | ₹7,269.75 |
| 3 | Providing and laying in position cement concrete of specified grade inclu. curing excluding the cost of centring & shuttering-All work upto plinth level 1:4:8 (1 cement: 4 fine sand : 8 graded stone aggregate 40mm nominal size) incl. all leads, lifts & carriage of material by MT / H.L. | 1,673.65 | Cum | 5,202.9 | ₹87,07,833.58 |
| 4 | Providing and laying in position cement concrete of specified grade incl.curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl. all leads, lifts & carriage of material by MT/ H.L. | 573.79 | Cum | 5,733.6 | ₹32,89,882.34 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level | 527.88 | Cum | 8,021.1 | ₹42,34,178.27 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | 938.91 | Cum | 9,412.05 | ₹88,37,067.87 |
| 7 | Add or deduct for using more or less cement in the items of design mix over and above the specified cement content therein. | 58.67 | Quintel | 941 | ₹55,208.47 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,16,340 | Kg | 123.2 | ₹2,66,53,088 |
| 9 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth. in cement mortar 1:6 ( 1 cement : 6 coarse sand) | 836.85 | Cum | 7,571.55 | ₹63,36,251.62 |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 836.85 | Cum | 1,455.65 | ₹12,18,160.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_987089.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .