Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.0 Cr
EMD Value
₹3.0 L
Closing Date
18 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
the Executive Engineer NH Dn Hubli
Office of the Executive Engineer NH Dn Vishweshwar Nagar Hubli-580032
Road improvement in selected sections of Hanagalla-Manthagi-Sammasagi road from km. 12.50 to 15.10.(Job No CRIF-KNT-2026-27-228)
2026_MoRTH_934790_1
EE/NH/HBL/PB2/2026/27/1546-9 Dt16/11/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Sammasagi
As per tender doc
6 documents required · 6 mandatory
₹5,100
the Executive Engineer NH Dn Hubli
₹3.0 L
the Executive Engineer NH Dn Hubli
18 Nov 2026
18 Nov 2026
19 Dec 2026
18 Nov 2026
18 Dec 2026
18 Nov 2026
2 Dec 2026
135 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness.including all labour, usage charges of all machinery etc., complete. (for new roads) 2 .ii)By mechanical means A)in area of light jungle. with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 0.44 | Ha | 32,646 | ₹14,364.24 |
| - | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material with all lifts and leads including all labour, load, unload, usage charges of all machinery etc., complete. By Mechanical Means using Hydraulic excavator and with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 1,575 | sqm | 8.1 | ₹12,757.5 |
| - | Excavaton in soil using Hydraulic Excavator and Tippers with Disposal: Excavation for roadwrk in soil by hydraulicexcavator including cutting and loading in tippers, trimming bottom ans side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location, with all lifts and lead, including all labour, load, unloa, usage charges of all machinery etc, completeand as per the direction of the Engineer-In-Charge for successful completion of work and all other incidental charges. with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 405 | Cum | 105 | ₹42,525 |
| - | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for subgrade construction with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 1,398.71 | Cum | 93 | ₹1,30,080.03 |
| - | Construction of Subgrade and earthen shoulder with materials deposited at site from roadway cutting transporting to site, spreading, grading to requried slope and compacted to meet requrement of table 300-2.laid in layers not exceeding 250 mm loose thickness, and compacting it by mechanical means after adding water to its OMC, so as to achive 97% compaction of maximum dry dencity and finish the surface to the requried camber,grade by motor grador, consolidation by roller including all lead, lift,loading,unloading,all labour,usage charges of all machinery etc,complete. with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 243 | Cum | 61 | ₹14,823 |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 864 | Cum | 475 | ₹4,10,400 |
| - | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & as per the directions of Engineer-in-charge | 1,689.53 | Cum | 2,246 | ₹37,94,684.38 |
| - | Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, .B.Laying Using Grader. with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 1,817.81 | Cum | 2,440 | ₹44,35,456.4 |
| - | Providing and applying primer coat with SS1 bitumen emulsion complying IS-8887 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per table-500-3, including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete, including lead for emulsion..over WMM/WBM surface. with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 7,608.75 | Sqm | 100.77 | ₹7,66,733.74 |
| - | Providing and applying tack coat with bitumen emulsion(RS1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete, (A) On Granular surfaces treated with primer. with all lead and lifts and all labour, hire charges of all machineries and transpotation charges of all machineries and inclusive of all incidential charges etc., complete. as per specifications & and as per the directions of Engineer-in-charge | 7,608.75 | Sqm | 21.09 | ₹1,60,468.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Generalconditions.pdf
Additional Documents • 0.22 MB
Documentssubmit.pdf
Additional Documents • 0.38 MB
228KW4.pdf
Tender Documents • 1.33 MB
BOQ_982312.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .