Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC GAT NO 303 1 312 313 VILLAGE KONDHAPURI TALUKA SHIRUR KONDHAPURI INDIA KONDHAPURI MAHARASHTRA PUNE MAHARASHTRA 412209 | PUNE | MAHARASHTRA | 412209 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹52.4 L+₹22.9 L (77.8%)Rejected-Finance GAT NO 304 VILLAGE KONDHAPURI TALUKA SHIRUR VILLAGE KONDHAPURI PUNE MAHARASHTRA 412209 | PUNE | MAHARASHTRA | 412209 | L2 | Rejected-Finance L2 BIDDER |
Tender Value
₹24.3 L
Closing Date
17 Nov 2022, 3:00 pmClosed
DGM CONTRACTS
Contract Cell Barauni Refinery 851114
Increasing the reliability of the compressor 802-K-01A/B after carrying out root cause analysis of Chronic problem of High wear rate of Piston and Rider rings.
2022_BR_155983_1
BCCM225331
Open Tender
Mechanical Works
Works
Barauni Refinery
Please refer NIT and Tender documents
6 documents required · 6 mandatory
Exempted
Barauni Refinery
17 Mar 2023
7 Sept 2022
18 Nov 2022
7 Sept 2022
17 Nov 2022
21 Sept 2022
7 Sept 2022 - 12 Sept 2022
13 Sept 2022
Amount
Increasing the reliability of the compressor 802-K-01A/B after carrying out root cause analysis of Chronic problem of High wear rate of Piston & Rider rings.
Compressor Make:- BPCL Model:- 2HD/2 Tag:- 802-K-01A/B Vendor is to carry out the site visit. The activities involved are as below. 1. Checking all the operating parameters of the compressor. 2. Checking physical condition of the compressors. 3. Taking readings, clearances and the measurements as per the standard checklist. 4. Carrying out the root cause analysis of the problem of high wear rate of rider & piston Rings of both the stages. 5. Submitting the report of root cause analysis to IOCL. 6. Attending the problem as per the root cause analysis done. 7. Supply and installation of modified parts if required. 8. Supply and installation of the damage/worn-out spares parts such as liner, piston, piston rod, packing cups etc. 9. Complete execution of the job at site. 10. Refurbishing of all the suction and discharge valves of the compressor. 11. Carrying out MRT of the compressor 12. Commissioning the compressor. 13. Giving guaranteed operation of the compressor for minimum 6000hrs without failure of the Rider & Piston ring. 14. Supply of Four sets, Rider and Piston Rings as a spares. Note:- EA means one compressor.
Burckhardt Compression India Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .