| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 CrAccepted-AOC MIRZAPUR UTTAR PRADESH | ₹8.1 Cr Quoted ₹8.4 Cr | 1 | Accepted-AOC Work in Progress |
| 2 | Not Admitted-Fee/PreQual/Technical G T ROAD MADHAULI CHURAMANPUR BHULLANPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical MIRZAPUR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.8 Cr
EMD Value
₹17.7 L
Closing Date
31 Jan 2025, 12:00 pmClosed
SE, Mzp Circle, PWD, Mzp
SE, Mzp Circle, PWD, Mzp
Widening and Strengthening Work
2024_CEMRZ_984043_2
5887/53M-Mzp Circle/2024-25 Dt. 11-12-2024
Open Tender
Civil Works - Roads
Item Rate
182 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹17.7 L
Yes
SE, Mzp Circle, PWD, Mzp
15 Apr 2025
17 Dec 2024
31 Jan 2025
17 Dec 2024
31 Jan 2025
17 Dec 2024
20 Dec 2024
Amount
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. :- Excavation for roadwork in soil withhydraulic excavator including cutting and loading in tippers, trimming botom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of Embankment with Material deposited fromRoadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requírement of table 300-2
Construction of Embankment with Material obtained from BorrowpitsConstruction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
G.S.B.Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete. (Two layer)
Providing, laying spreading and compacting well graded stone aggregates as wet mix macadam specification including premixing the material at OMC in mechanical WMM mixing plant, carriage of mixed material by tipper to site and laying with paver in base course on well prepared surface, compacting with vibratory roller to achieve the desired density. Including cost of material, T&P, labour and all taxes etc. for proper completion of the work. Complete work as per MORT&H specification No. 406.
Providing and applying prime coat with slow setting bitumen emlusion on prepared surface of Granular Base including cleaning of road surface and spraying primer @ 0.70 kg. per sqm. using machenical means as per MORT&H
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Grade-II)
Providing and applying tack coat with medium setting bitumen emulsion using Bitumen pressure dristributor @ 0.30 kg. per sqm. on the prepared bituminous surface As per MORT&H Clause 503
Bituminous ConcreteProviding and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects.
Construction of subgrade and earthen shoulders with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead) (patri work)
Earth work in excavation in foundation in moorum/single/ kankar requiring the used of specal T&P such as pixckaxes subbals etc including all labour T&P royality etc all complete.
Supply and laying of local sand in trench including ramming, dressing, watering etc. including cost of all material, labour etc. complete. (within 8 km.) SI No. 255
Cement concrete with 4 cm gauge stone ballast coarse sand and cement in the proportion 8:4:1 including cost of all material, labour etc. complete. SI No. 281
RCR stone masonary in 1:3 cement chopan caorse sand mortar in cluding all labour T&P etc complete
Struck pointing 1:2 cement and fine sand mortar on both visibule face of end wall in parapet.
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
R.C.C. in 1:2:4 with one part of cement 2 part coarse sand and 4 part of 20 mm gauge hard stone grit in slab and bed block including all taxes, royality but excluding cost of steel including supply of all material, labour, T&P and etc. required for proper completion of the work as per direction of E/I.
M.S. iron work such as in reinforced concrete work wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. As per SI No 504 as per direction of E/I.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .