Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PTAEL NAGAR TELIPHONE EXCHANGE BIJROL ROAD BARAUT BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | Admitted-Finance |
| 2 | Admitted-Finance BINOLI ROAD GANDHI COLONY BUS STAND BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6.3 L
EMD Value
₹7,000
Closing Date
12 Feb 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC MEERUT
130 D PAARESHAN BHAWAN VICTORIA PARK MEERUT
WORK TENDER
2022_UPTCL_675393_1
T-101/21-22/ETC/MT
Open Tender
Electrical Works
Item Rate
365 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC MEERUT
₹7,000
24 Feb 2022
2 Feb 2022
14 Feb 2022
2 Feb 2022
12 Feb 2022
2 Feb 2022
90 days
Amount
Regular tower to tower ground & tower top patrolling of following 132 KV lines as detailed below. Patrolling work consist of detection of the defects like missing/theft tower members, hot point, punctured/flashed over disc insulator/polymer string, dislocation of vibration dampers, damaged conductor / earthwire, checking of foundation/stubs, position of earthing & position of trees in 27 meter wide line corridor. Patrolling shall be done regularly on quaterely basis i.e. 4 time in a year with petrolling report on specific UPPTCL performa in 3 copies.
132 KV S/C Line i. 132 KV Modipuram-Kankarkhera-II line Single circuit Section- 11.80 Km. ii. 132 KV Modipuram-Sardhana line single circuit section- 05.30 Km. iii. 132 KV Modipuram-Kapsad S/C line till LILO point- 16.00 Km. iv. 132 KV Sardhana-M/s Daurala Sugar Mill Co-gen S/C line- 10.02 Km. Total -43.12 Km x 4= 172.48 Km.
132 KV D/C Line i. Common section of 132 KV Modipuram-Sardhana line and 132 KV Modipuram-Kankarkhera-II line.- 09.50 Km. ii. LILO section of 132 KV Modipuram-Kapsad line and 132 KV Khatauli-Kapsad line.- 05.70 Km. Total – 15.20 Km. x 4= 60.80 Km.
Emergency patrolling includes tower top petrolling of 132 KV lines in the event of tripping/break down to find out fault location and type of fault. 43.12 Km. +15.20 Km. =58.32 Km. x 2= 116.64 Km.
Opening/Cutting of nut & bolts of remaining cut pieces of tower members stolen by miscreants to be opened safely/cut safely with the help of gas cutter/hacksaw blade. Fabrication & fixing of tower members including cartage of steel angles from Sub-station store, punching holes for proper placement tightening of nuts & bolts punching & chamfering at different tower location of above Transmission line and associated work to complete the job satisfactorily as per technical specification.
Strengthening/Replacement of damaged jumpers at tension towers.
Tightening of jumpers at Tension Towers on both sides.
Replacement of damaged/punctured disc insulator/polymer insulator string including cartage of material from store to work site and back to store of the above line:
For Suspension String
For Tension String
Lopping, chopping and cutting of trees branches in the 27 meter corridor of above line and stacking of above cuttings at proper place far from the line.
Removal of bird nest from cross arm/peak/cage/body of tension/suspension towers
From cross arm of tension/suspension tower with manual checking and cleaning of porcelain disc/composite polymer insulator string.
From peak/cage/body of tension/suspension tower.
Repairing of damaged ACSR Panther conductor by fixing one no. repair sleeve/mid span joint including lowering down of conductor (up to 01 Km) and restringing of the same with all associated work to complete the job satisfactorily.
Attending breakdown of broken panther conductor by fixing Mid Span Compression joints including lowering down of conductor restringing of the same up to 01 Km including replacement of conductor, insulator string, fitting, jumper and associated work as required.
Repairing of conductor by providing repairing sleeve/mid span joint when conductor down to earth during attending Breakdown of conductor as mentioned in item No. 9.
Replacement of dead end
When conductor down to earth as in item No (8) and (9).
When conductor required down to earth and restringing including replacement of damaged disc/polymer string and jointing of new conductor pieces as required including jumper providing new jumper.
Attending breakdown of earthwire/OPGW/tightening of loose earthwire/OPGW up to 01 Km.
Tightening/fixing of missing/displaced vibration damper/arcing horn.
M/S OM SAI CONTRACTOR
M/S AJAY TOMAR CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .