Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.1 Cr+₹12.4 L (0.95%)Rejected-AOC 41 21 A KMC TOWERS C2 C2 SCHEME ROAD THENI 625531 | THENI | TAMIL NADU | 625531 | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.3 Cr+₹24.8 L (1.90%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹12.4 Cr
EMD Value
₹6.3 L
Closing Date
5 Jan 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, NH,Madurai
O/o Superintending Engineer, National Highways, No.5, Besant Road, ChinnaChokkikulam Madurai 02
Strengthening from km 1/0 - 5/2 and 5/6 -13/8 of Pullimancombai Road (M-667) including Reconstruction of Culverts at km 2/8(i),2/10,6/2, 6/6, km10/4andkm13/6, Construction of Protective wall at km 12/4 and Construction of Side Drain at km 12/10 and
2025_MoRTH_888204_1
TN No 16/2025-26/HDO/NH/Dt.02.12.25
Open Tender
Civil Works - Roads
Percentage
240 days
Theni
As per Tender Document
5 documents required · 5 mandatory
₹17,700
Divisional Engineer NH Madurai
₹6.3 L
O/o Superintending Engineer, NH,Madurai
14 Feb 2026
3 Dec 2025
6 Jan 2026
3 Dec 2025
5 Jan 2026
3 Dec 2025
19 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the Light Jungle including all other incidental charges etc., complete as MoRTH Standards and specifications( W-0002) | 13,533.72 | sqm | 6.89 | ₹93,247.33 |
| 2 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V Clause No. 111, 112, 202 & 501. | 3,601.27 | sqm | 23.36 | ₹84,125.67 |
| 3 | Construction of Granular Sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - for Grading-V Material | 790.01 | cum | 2,114.7 | ₹16,70,634.15 |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, 250 mm thick, including premixing the materials with water at OMC in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub-Base/Base course on well-prepared surface and compacting with vibratory roller to achieve the desired density; including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5. | 1,982.53 | cum | 2,585.27 | ₹51,25,375.33 |
| 5 | Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5. | 11,306.72 | sqm | 86.49 | ₹9,77,918.21 |
| 6 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 11,306.72 | sqm | 19.96 | ₹2,25,682.13 |
| 7 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 75,795.83 | sqm | 28.81 | ₹21,83,677.86 |
| 8 | Providing and laying Tack Coat over Existing Concrete surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 291.2 | sqm | 22.56 | ₹6,569.47 |
| 9 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base,(using Mini Hot Mix Plant and Power Roller)including cost of material,labour charges,rentals for machinery,fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch works). | 79.08 | cum | 8,835.7 | ₹6,98,727.16 |
| 10 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per pecification using CMP as per clause 505 MORTH Rev-5 | 4,411.77 | cum | 10,692.38 | ₹4,71,72,321.31 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
DOC16.rar
Tender Documents • 1.94 MB
BOQ_933562.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .