| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.0 LAccepted-AOC DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹60.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹60.9 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹60.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹62.3 LRejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹62.3 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BABLU SINHA L3 | SABIR CONSTRUCTION L1 | NANDI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00New installation of 2x150KW, 1200mm belt conveyor with 500 mtr structure at 16 no in RV seam for LHCM . (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Loading, unloading, carrying, transportation of 2x150 KW, 1200mm heavy duty drive head with Motor and starter from surface to mentioned belt conveyor - | 29 | MT | 25,300 ₹7,33,700 | 24,094 ₹6,98,726 | 24,460 ₹7,09,340 |
| 1.02 | Loading, unloading, carrying, transportation of other structure assoiciated with Drive head including discharge unit, loop take assembly, tail end assembly and safety guard from surface to mentioned belt conveyor - | 21 | MT | 25,300 ₹5,31,300 | 24,094 ₹5,05,974 | 24,460 ₹5,13,660 |
| 1.03 | Loading, unloading, carrying, transportation of 500 mtr structure at mentioned belt conveyor -@ 146kg per mtr | 73 | MT | 25,300 ₹18,46,900 | 24,094 ₹17,58,862 | 24,460 ₹17,85,580 |
| 1.04 | Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt | 1,000 | Meter | 400 ₹4,00,000 | 392 ₹3,92,000 | 398 ₹3,98,000 |
| 1.05 | Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT | 1 | MT | 25,300 ₹25,300 | 24,094 ₹24,094 | 24,460 ₹24,460 |
| 1.06 | Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes | 1 | nos | 27,500 ₹27,500 | 27,289 ₹27,289 | 27,704 ₹27,704 |
| 1.07 | Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes. | 1 | nos | 30,100 ₹30,100 | 29,108 ₹29,108 | 29,550 ₹29,550 |
| 1.08 | Fabrication and fitting of dischage and tail end scrapper | 1 | nos | 2,050 ₹2,050 | 2,000 ₹2,000 | 2,030 ₹2,030 |
| 1.09 | Loading, unloading transportation of control cable & assy laying and fitting | 1 | nos | 31,000 ₹31,000 | 30,360 ₹30,360 | 30,821 ₹30,821 |
Tender Value
₹60.0 L
EMD Value
₹75,000
Closing Date
19 Jan 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
New Installation of 2x150KW Drive Head in place of 2x90KW Drive head for LHCM in 16D belt of RV seam of Khottadih Colliery Panaveshwar Area
2026_ECL_350471_1
GM-PND/EandM/25-26/235/1229 dated 01/01/2026
Open Tender
Electrical and Maintenance Works
60 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹75,000
6 Mar 2026
3 Jan 2026
20 Jan 2026
3 Jan 2026
19 Jan 2026
3 Jan 2026
3 Jan 2026 - 12 Jan 2026
New installation of 2x150KW, 1200mm belt conveyor with 500 mtr structure at 16 no in RV seam for LHCM . (Inclusive of EPF/CMPF)
Loading, unloading, carrying, transportation of 2x150 KW, 1200mm heavy duty drive head with Motor and starter from surface to mentioned belt conveyor -
Loading, unloading, carrying, transportation of other structure assoiciated with Drive head including discharge unit, loop take assembly, tail end assembly and safety guard from surface to mentioned belt conveyor -
Loading, unloading, carrying, transportation of 500 mtr structure at mentioned belt conveyor -@ 146kg per mtr
Loading, unloading, carrying, transportation of belt from surface to belt install site then laying and lapping of belt
Loading, unloading, carrying, transportation of 01 nos of load table from surface to mentioned belt conveyor -1MT
Faencing of drive tail end etc including cost of DA,oxygen and welding electrodes
Fabrication of load table at surface workshop including cost of DA, Oxygen & welding elctrodes.
Fabrication and fitting of dischage and tail end scrapper
Loading, unloading transportation of control cable & assy laying and fitting
Fabrication & fitting of veticle support for structure hanging portion from discharge to loop take up including coast of DA and 02 nos oxygen cylibnder
Transportation and placing electrical VCB , cable (power and control) from surface to drive head - 1 set
Consumables 5/8"x2" -500kg and WASHER - 30 kg
Holding down bolt for drive head
Complete repairing of 400 Amps 6.6 kV Mine Line make FLP VCB at Khottadih Project under Pandaveswar Area. (Inclusive of EPF/CMPF)
Dismantling, Loading , carrying, transportation of discharge unit with required girders from mentioned belt conveyor to surface -3MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of heavy duty drive head from mentioned belt conveyor to surfac -10.5MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from mentioned belt conveyor to surfac -1MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of 500 mtr structure frommentioned belt conveyor to surfac -@ 110 kg per mtr
Dismantling, Loading, carrying, transportation of belting from mentioned belt conveyor to surface
Dismantling, Loading, carrying, transportation of loop take up from mentioned belt conveyor to surfac-4.75MT using DA and Oxygen
Dismantling, Loading, transportation of control cable & assy from mentioned belt conveyor to surfac
Dismantling, Loading, carrying, transportation electrical ACB, starter, cable (power and control) from mentioned belt conveyor to surfac
Dismantling, Loading, carrying, transportation of 02 nos load table from 16 no sbelt to surace -3MT using DA and Oxygen
Cleaning of coal for Discharge, Drive, Hopper & Tail end set from 37WL belt conveyor
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_363220.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid