Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95,678Accepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹95,919+₹241 (0.25%)Rejected-Finance 356 BASUDEVPUR ROAD SHYAMNAGAR NORTH 24 PARGANAS 743127 | SHYAMNAGAR | NORTH 24 PARGANAS | WEST BENGAL | 743127 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹97,121+₹1,443 (1.51%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹96,159
EMD Value
₹1,923
Closing Date
25 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE-I/LDCD
O/O EE-I,LDCD Fuleswar Uluberia Howrah 711316
Emergent protection work at Left bank of River Damodar near Bagua High School in GP - Balichak, Block - Amta - I, PS-Amta, District-Howrah
2026_IWD_5074269_6
WBIW/EE-I/LDCD/e-SNIT- 4/2026-27
Open Tender
CIVIL WORKS
Percentage
15 days
Amta
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,923
6 Nov 2026
23 Sept 2026
26 Sept 2026
23 Sept 2026
25 Sept 2026
23 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 81 | Each | 139.44 | ₹11,294.64 |
| 2 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (minimum 21 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary eqiupments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of Nylon crate as per direction of the Enginees-in-Charge. NB:- Volume of each earth / sand filled bags should not be less than 0.0328 cum. Sixe of Nylon crate is 1 metre x 1 metre x 1 metre. a) Where boats are not necessary. | 36 | Cum | 899.87 | ₹32,395.32 |
| 3 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.
Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary. | 45 | Each | 498.17 | ₹22,417.65 |
| 4 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, leveling as per direction of the Engineer-in-charge within a lead of.
A) Beyond 4.00 km and upto 5.00 km
NB :- Measurement to be taken on the basis of stack measurement/pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.(For compensation for earth for land owned and arranged by conductor add Rs. 25.00 per m3 extra over rate of E/W for land owned/arranged by the department. Royalty charge on earth @ 29.00 per m3 & Cesses charges @Rs. 5.30 per m3(i.e. Rs. 15.00 per 100 cft) as per govt notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses.) | 81 | Cum | 371 | ₹30,051 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
6.pdf
Other Document • 0.19 MB
BOQ_5160453.xls
BOQ • 0.26 MB
Form2911.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .