| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.8 LAccepted-Finance KENDRA DALURBANDH KENDRA BURDHAN BARDHAMAN BARDHAMAN 713380 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713380 | ₹98.8 L | L1 | Accepted-Finance TC recommendation |
| 2 | L2₹1.0 CrRejected-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹1.0 Cr | L2 | Rejected-Finance TC recommendation |
| 3 | L3₹1.0 CrRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹1.0 Cr | L3 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | SINHA ENTERPRISES L1 | SWAPAN KUMAR AKHULI L2 | NANDI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Discription of items | ||||||
| 2.00 | Departmantal Estimation for installation and commissioning of 1000mm widex286mtr conveyor Belt in Panel No. PB1, -23L-9D TO-23L-20D of Depillaring RVIIB seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area.Transportation and installation of complete drive drum, driven drurh with gear motor base frame -10.5MT-discharge unit-2.5MT-tail end-1MT-load table-1MT+loop take up with tension trolley drum-3.60MT-Fix unit-1MT-motor, winch starter & switches cables etc -2.0MT-1000mm wide conveyor structure with top, bottom roller & foot stool-286mtr @68Kg/mtr 19.44MT-4 times Tail end shifting (extension)-4MT= total weight =45.04 MT | 45.04 | MT | 26,421 ₹11.9 L | 27,103 ₹12.2 L | 27,264 ₹12.3 L |
| 3.00 | Fitting of tail end and discharge scraper. | 2 | nos | 1,218 ₹2,436 | 1,249 ₹2,498 | 1,257 ₹2,514 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning, trail run etc | 582 | m | 558 ₹3.2 L | 572 ₹3.3 L | 576 ₹3.4 L |
| 5.00 | Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos | 120 | nos | 448 ₹53,760 | 460 ₹55,200 | 462 ₹55,440 |
| 6.00 | Cleaning of coal & unused materials before installation job | 1 | ls | 20,711 ₹20,711 | 21,245 ₹21,245 | 21,372 ₹21,372 |
| 7.00 | Making of Load table | 1 | nos | 28,981 ₹28,981 | 29,729 ₹29,729 | 29,905 ₹29,905 |
| 8.00 | Fencing of drive, loop take up & tail end. | 1 | ls | 18,274 ₹18,274 | 18,745 ₹18,745 | 18,857 ₹18,857 |
| 9.00 | Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by wellding, gas cutting etc. considering cost of consumables. | 1 | ls | 54,461 ₹54,461 | 55,866 ₹55,866 | 56,198 ₹56,198 |
| 10.00 | Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+loop take up with tension trolley drum-3.60MT+Fix unit-9 1MT-load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-250mtr @68Kg/mtr =17MT= total weight = 38.60 MT | 38.6 | MT | 10,112 ₹3.9 L | 10,373 ₹4.0 L | 10,435 ₹4.0 L |
Tender Value
₹98.8 L
EMD Value
₹1.2 L
Closing Date
10 Nov 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of conveyor belts in RVIIB seam for LHCM1 package of CM project at Nakrakonda Kumardihi-B Colliery under Bankola Area
2025_ECL_345945_1
ECL/GM/BA/E TENDER/25-26/ENM/162 Dt 24.10.2025
Open Tender
Electrical and Maintenance Works
60 days
Nakrakonda Kumardihi B Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.2 L
30 Apr 2026
24 Oct 2025
11 Nov 2025
24 Oct 2025
10 Nov 2025
24 Oct 2025
24 Oct 2025 - 4 Nov 2025
Amount
Discription of items
Departmantal Estimation for installation and commissioning of 1000mm widex286mtr conveyor Belt in Panel No. PB1, -23L-9D TO-23L-20D of Depillaring RVIIB seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area.Transportation and installation of complete drive drum, driven drurh with gear motor base frame -10.5MT-discharge unit-2.5MT-tail end-1MT-load table-1MT+loop take up with tension trolley drum-3.60MT-Fix unit-1MT-motor, winch starter & switches cables etc -2.0MT-1000mm wide conveyor structure with top, bottom roller & foot stool-286mtr @68Kg/mtr 19.44MT-4 times Tail end shifting (extension)-4MT= total weight =45.04 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making of Load table
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by wellding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+loop take up with tension trolley drum-3.60MT+Fix unit-9 1MT-load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-250mtr @68Kg/mtr =17MT= total weight = 38.60 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement
Departmantal Estimation for Installation and commissioning of 1000mm widex104mtr conveyor Belt in Panel No. PB1,-191/-90 to -191/-5D of Depillaring RVIB seam of CM Project at Nakrakonda Kumardihi and Colliery under Bankola Area.Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT-discharge unit-2.5MT+tail end-1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-104mtr @68Kg/mtr 7.07MT+1 times Tail end shifting (extension)-1MT= total weight =29.67 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making of Load table
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by wellding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-100mtr @68Kg/mtr =6.8MT= total weight = 28.4MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take base and discharge base cement concrete.
Departmantal Estimation for Installation and commissioning of 1000mm widex104mtr conveyor Belt in Panel No. PB1,-19L/-5D to -23L/-5D of Depillaring RVIIB seam of CM Project at Nakrakonda Kumardihi and Colliery under Bankola Area. Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end-1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-104mtr @68Kg/mtr -7.07MT+1 times Tail end shifting (extension)-1MT= total weight 29.67 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making of Load table
Fencing of drive, loop take up and tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+loop take up with tension trolley drum-3.60MT+Fix unit-9 1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-100mtr @68Kg/mtr =6.8MT= total weight = 28.4MT
Taken out and coiling of belt
Cost of M.S. Nut bolts and washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Departmantal Estimation for installation and commissioning of 1000mm widex364mtr conveyor Belt in Panel No. P81. 101-9D TO 24L/-9D of Depillaring AVIB seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area.Transportation and installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end-1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-364mtr @68Kg/mtr 24.75MT+5 times Tail end shifting (extension)-5MT= total weight =51.35 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =120nos
Cleaning of coal and unused materials before installation job
Making of Discharge unit
Fencing of drive, loop take up and tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end -1MT+loop take up with tension trolley drum-3.60MT+Fix unit-91MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-350mtr @68Kg/mtr =23.8 MT+Tail end shortning 5 times=5MT= total weight = 50.4 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts and washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI (BID ID -1193317)
NANDI ENTERPRISE (BID ID -1193300)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_358619.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid