| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.9 LAccepted-Finance | ₹50.9 L | L1 | Accepted-Finance Found L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Eligible as per NIT criteria. |
| Sl No | Description | Qty | Unit | Oasis WFS (P) Ltd. L1 |
|---|---|---|---|---|
| 1.00 | SH:-1 SITC of refrigerated drinking water fountain with RO units
Supply, Installation, Testing and commissioning of wall mounted refrigerated barrier free bi-level (double spout/ Bubbler) drinking water fountain with front / side mechanical push pads to activate the flow of water manually with Cooling Capacity of 60 LPH and sensor & mechnical based independently activated two bottle filler system with two taps for dispensing Hot (min 10 ltr storage tank) & cold water (min 100 ltr Hydro Pressure Tank (HPT) storage tank) i/c front panel made of stainless steel top and heavy duty galvanized steel / brushed stainless steel frame to deliver the water through spout, suitable for operation at 230V (+10%), 50HZ, AC supply i/c all required accessories, valves, inter connecting water & drain piping/hardware like stop valve, minimum 100 micron strainer, trap with suitable size etc complete as per actual site requirement having R.O filteration system of 2Nos X 50 LPH, 5 stage filtration system, Commercial grade filters, minimum 400 GPD RO Membrane with point of use UV sanitization. The water Fountain shall meets all current Federal regulations for the differently abled such as ADA/ANSI/ NSF-USA. Product should be certified to be lead free as defined by the safe drinking water act. Agency has to execute electrical work and piping work required for installing the Water Fountain for its proper functioning and as directed by the E-I-C without any extra cost. The power point and water connection shall be provided by AAI near the installation. | 9 | Nos | 2,86,000 ₹25,74,000 Lowest |
| 2.00 | Dismantling of existing wall hanging non-refrigerated drinking water fountain unit of (Make: WAE, Model No. WAE-HTHB-OVLEBP-I) with booster/pressurising unit etc. complete in all respect as required. | 8 | JOB | 10,000 ₹80,000 Lowest |
| 3.00SH:-II Supply of Consumable spares Supply of consumable spare for 50 LPH RO System of Same make as supplied with Drinking water fountains. RO Membrane (Minimum 400 GPD) - Set of 04 | ||||
| 3.01 | For During defect liability period of 12 Months | 18 | JOB | 6,400 ₹1,15,200 Lowest |
| 3.02 | For Ist year after defect liability period of 12 Months | 18 | JOB | 6,600 ₹1,18,800 Lowest |
| 3.03 | For 2nd year after defect liability period of 12 Months | 18 | JOB | 6,800 ₹1,22,400 Lowest |
| 3.04 | For 3rd year after defect liability period of 12 Months | 18 | JOB | 7,000 ₹1,26,000 Lowest |
| 3.05 | For 4th year after defect liability period of 12 Months | 18 | JOB | 7,200 ₹1,29,600 Lowest |
| 3.06 | For 5th year after defect liability period of 12 Months | 18 | JOB | 7,400 ₹1,33,200 Lowest |
| 4.00Supply of consumable spare for 50 LPH RO System of Same make as supplied with Drinking water fountains. Sediment Filter (20 inches) | ||||
Tender Value
₹60.1 L
EMD Value
₹1.8 L
Closing Date
18 Aug 2026, 3:00 pmClosed
SM Engg(E)
Srinagar Airport
Supply, Installation, Testing and Commissioning of Refrigerated Drinking Water Fountain with RO System and 05 Years AICMC at Srinagar International Airport
2026_AAI_276192_1
AAI/SNR/ENGG-E/SITC-DRINKING WATER FOUNTAIN
Open Tender
Electrical Works
Item Rate
120 days
Srinagar Airport
Please refer Tender documents.
16 documents required · 16 mandatory
₹1,180
₹1.8 L
11 Sept 2026
28 Jul 2026
19 Aug 2026
28 Jul 2026
18 Aug 2026
28 Jul 2026
28 Jul 2026 - 11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH:-1 SITC of refrigerated drinking water fountain with RO units
Supply, Installation, Testing and commissioning of wall mounted refrigerated barrier free bi-level (double spout/ Bubbler) drinking water fountain with front / side mechanical push pads to activate the flow of water manually with Cooling Capacity of 60 LPH and sensor & mechnical based independently activated two bottle filler system with two taps for dispensing Hot (min 10 ltr storage tank) & cold water (min 100 ltr Hydro Pressure Tank (HPT) storage tank) i/c front panel made of stainless steel top and heavy duty galvanized steel / brushed stainless steel frame to deliver the water through spout, suitable for operation at 230V (+10%), 50HZ, AC supply i/c all required accessories, valves, inter connecting water & drain piping/hardware like stop valve, minimum 100 micron strainer, trap with suitable size etc complete as per actual site requirement having R.O filteration system of 2Nos X 50 LPH, 5 stage filtration system, Commercial grade filters, minimum 400 GPD RO Membrane with point of use UV sanitization. The water Fountain shall meets all current Federal regulations for the differently abled such as ADA/ANSI/ NSF-USA. Product should be certified to be lead free as defined by the safe drinking water act. Agency has to execute electrical work and piping work required for installing the Water Fountain for its proper functioning and as directed by the E-I-C without any extra cost. The power point and water connection shall be provided by AAI near the installation. | 9 | Nos | - | - |
| 2 | Dismantling of existing wall hanging non-refrigerated drinking water fountain unit of (Make: WAE, Model No. WAE-HTHB-OVLEBP-I) with booster/pressurising unit etc. complete in all respect as required. | 8 | JOB | - | - |
| 3SH:-II Supply of Consumable spares Supply of consumable spare for 50 LPH RO System of Same make as supplied with Drinking water fountains. RO Membrane (Minimum 400 GPD) - Set of 04 | |||||
| 3.01 | For During defect liability period of 12 Months | 18 | JOB | - | - |
| 3.02 | For Ist year after defect liability period of 12 Months | 18 | JOB | - | - |
| 3.03 | For 2nd year after defect liability period of 12 Months | 18 | JOB | - | - |
| 3.04 | For 3rd year after defect liability period of 12 Months | 18 | JOB | - | - |
| 3.05 | For 4th year after defect liability period of 12 Months | 18 | JOB | - | - |
| 3.06 | For 5th year after defect liability period of 12 Months | 18 | JOB | - | - |
| 4Supply of consumable spare for 50 LPH RO System of Same make as supplied with Drinking water fountains. Sediment Filter (20 inches) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
TDFINALWATERFOUNTAIN.pdf
Tender Documents • 14.70 MB
BOQ_333477.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .