Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹27,780
Closing Date
3 Aug 2026, 5:00 pm7d left
EE
Nagar Nigam Gorakhpur
Ward number 51 Devi Prasad Nagar mein Omkar nath Tripathi ke Makan se Guddu Shukla ke Makan Tak vah Dube kirana store ke Bagal wali Gali mein RCC nali V CC sadak Nirman karya.
2026_DOLBU_1162590_2
FFC Ward 51 sn 55
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Nagar Nigam Gorakhpur
₹27,780
21 Jul 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches.SI No.251a | 1 | Cu.M | 120 | ₹119.88 |
| 1.02 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-273) | - | Cu.M | 4,007 | - |
| 1.03 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No-289) | 1 | Cu.M | 9,082 | ₹9,072.92 |
| 1.04 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | - | Qtl. | 7,690 | - |
| 1.05 | M-150 Brick Work in 1:4 cement & c/sand 2.20 F.M mortar in foundation and plinth including supply of all materials, Labour and T&P etc. Required for proper completion of the work. (S.I-305) | - | Cu.M | 5,817 | - |
| 1.06 | 12mm thick plaster with cement and c/sand in 1:4 over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & Plants etc. required for proper completion of the work. (S.I-584) | - | Sq.M | 159 | - |
| 1.07 | Cement Concrete with 20mm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I-279a) | - | Cu.M | 8,186 | - |
| 1.08 | E/W filling with cartage upto 10km including all complete of work. | - | Cu.M | 330.1 | - |
| 1.09 | Brick solling with straight over burnt brick laid flat and dry including all complete all complete the work. | 1 | Sq.M | 336 | ₹335.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.20 MB
BOQ_2198226.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].