Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹322.0 CrAccepted-Finance NO 4 GROUND FLOOR ALAYAM SPACE ANANDHA ROAD ALWARPET CHENNAI 600 018 | CHENNAI | TAMIL NADU | 600018 | ₹322.0 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹343.7 Cr+₹21.7 Cr (6.75%)Accepted-Finance 175 2 SOUTH STATE BANK NAGAR CHETTIPALAYAM ERODE 638 002 | ERODE | ERODE | TAMIL NADU | 638002 | ₹343.7 Cr+₹21.7 Cr (6.75%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹344.4 Cr+₹22.4 Cr (6.95%)Accepted-Finance P AND C TOWERS 2ND FLOOR 140 PERUNDURAI ROAD ERODE 638 011 | ERODE | TAMIL NADU | 638011 | ₹344.4 Cr+₹22.4 Cr (6.95%) | L3 | Accepted-Finance Accepted |
| 4 | L4₹355.2 Cr+₹33.2 Cr (10.3%)Accepted-Finance | ₹355.2 Cr+₹33.2 Cr (10.3%) | L4 | Accepted-Finance Accepted |
| 5 | L5₹374.9 Cr+₹52.9 Cr (16.4%)Accepted-Finance SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | ₹374.9 Cr+₹52.9 Cr (16.4%) | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Barbrik Project Limited L8 | RNS INFRASTRUCTURE LIMITED L4 | P and C Projects Private Limited L3 | SCC Infrastructure Pvt. Ltd. L7 | RPP infra Projects limited L5 | EKK Infrastructure Pvt Ltd L6 | RAMALINGAM CONSTRUCTION COMPANY PRIVATE LIMITED L2 | KCP INFRA LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||||||||
| 1.00 | Earth work excavation for foundation in all kinds soils in varying depths including dismantling any masonry or roots met within foundation and shoring with planks, baling water if necessary and filling the sides with excavated earth including clearing and levelling site etc., complete with an initial lead of 10m.and lift of 2m | 331 | cum | 90 ₹29,790 Lowest | 150 ₹49,650 | 150 ₹49,650 | 140 ₹46,340 | 180 ₹59,580 | 250 ₹82,750 | 120 ₹39,720 | 127 ₹42,037 |
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Additionally wherever required/as applicable: Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels
All kinds of soil. | 24,510 | cum | 120 ₹29,41,200 Lowest | 240 ₹58,82,400 | 150 ₹36,76,500 | 140 ₹34,31,400 | 240 ₹58,82,400 | 270 ₹66,17,700 | 120 ₹29,41,200 Lowest | 189 ₹46,32,390 |
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 1,044 | cum | 120 ₹1,25,280 | 150 ₹1,56,600 | 150 ₹1,56,600 | 140 ₹1,46,160 | 130 ₹1,35,720 | 270 ₹2,81,880 | 100 ₹1,04,400 Lowest | 189 ₹1,97,316 |
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. ordinary rock | 47,093 | cum | 180 ₹84,76,740 | 240 ₹1,13,02,320 | 470 ₹2,21,33,710 | 140 ₹65,93,020 Lowest | 480 ₹2,26,04,640 | 335 ₹1,57,76,155 | 175 ₹82,41,275 | 183 ₹86,18,019 |
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil.
30'0" dia up to the depth of 40'0" | 14,762 | cum | 180 ₹26,57,160 | 150 ₹22,14,300 | 150 ₹22,14,300 | 175 ₹25,83,350 | 135 ₹19,92,870 | 280 ₹41,33,360 | 120 ₹17,71,440 Lowest | 186 ₹27,45,732 |
| 1.01 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 44,047 | cum | 90 ₹39,64,230 | 150 ₹66,07,050 | 150 ₹66,07,050 | 175 ₹77,08,225 | 100 ₹44,04,700 | 250 ₹1,10,11,750 | 80 ₹35,23,760 Lowest | 127 ₹55,93,969 |
| 1.01 | Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ’/ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift :
All kinds of soil | 88 | cum | 120 ₹10,560 Lowest | 240 ₹21,120 | 300 ₹26,400 | 850 ₹74,800 | 300 ₹26,400 | 390 ₹34,320 | 350 ₹30,800 | 127 ₹11,176 |
| 1.01 | Earthwork excavation for trenches in all kinds of soil to correct grade, level, including dressing of sides, ramming of bottom, shoring, strutting, dewatering, wherever necessary, backfilling with selected excavated earth, watering, consolidating in layers for all lifts & lead involved in the work. | 240 | cum | 180 ₹43,200 | 240 ₹57,600 | 410 ₹98,400 | 175 ₹42,000 | 620 ₹1,48,800 | 288 ₹69,120 | 350 ₹84,000 | 128 ₹30,720 Lowest |
| 1.01Excavating trenches by mechanical/manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil as directed, within a lead of 50m: All kinds of soil | |||||||||||
Tender Value
₹420 Cr
EMD Value
₹4.3 Cr
Closing Date
6 Apr 2026, 3:00 pmClosed
Dy.ChiefEngineer
WAPCOS Limited (A Government of India Undertaking) Project Office, MEPZ Special Economic Zone, GST Road, Tambaram Chennai 600 045 Telephone 044 4511 8383
Revamping of Trunk Infrastructure Facilities at MEPZ Special Economic Zone, Tambaram, Chennai
2026_MSEZA_900828_1
WAP/ENVT/MEPZ/2026/ET/03
Open Tender
Civil Works
Item Rate
MEPZ-SEZ, Tambaram
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
WAPCOS Limited
₹4.3 Cr
MEPZ-SEZ,Tambaram
3 Jul 2026
2 Mar 2026
7 Apr 2026
2 Mar 2026
6 Apr 2026
2 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | CIVIL WORKS | - | - | - | - |
| 0.999 | Earth work excavation for foundation in all kinds soils in varying depths including dismantling any masonry or roots met within foundation and shoring with planks, baling water if necessary and filling the sides with excavated earth including clearing and levelling site etc., complete with an initial lead of 10m.and lift of 2m | 331 | cum | 151 | ₹49,981 |
| 0.000 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Additionally wherever required/as applicable: Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels
All kinds of soil. | 24,510 | cum | 294 | ₹72,05,940 |
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 1,044 | cum | 124 | ₹1,29,456 |
| 0.000 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. ordinary rock | 47,093 | cum | 597 | ₹2,81,14,521 |
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil.
30'0" dia up to the depth of 40'0" | 14,762 | cum | 167 | ₹24,65,254 |
| 0.000 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 44,047 | cum | 122 | ₹53,73,734 |
| 0.999 | Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ’/ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift :
All kinds of soil | 88 | cum | 373 | ₹32,824 |
| 0.000 | Earthwork excavation for trenches in all kinds of soil to correct grade, level, including dressing of sides, ramming of bottom, shoring, strutting, dewatering, wherever necessary, backfilling with selected excavated earth, watering, consolidating in layers for all lifts & lead involved in the work. | 240 | cum | 518 | ₹1,24,320 |
| 0.999 | Excavating trenches by mechanical/manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil as directed, within a lead of 50m:
All kinds of soil | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
NITtrunkinfradoc.pdf
Tender Documents • 4.66 MB
BOQ_946859.xls
BOQ • 1.86 MB
Corrigendum1.pdf
PDF • 0.10 MB
PrebidMinutes.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .