Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC ADARSH NAGAR 3RD LANE GUNUPUR 765022 | RAYAGADA | ODISHA | 765022 | ₹31.5 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹32.5 L+₹1.0 L (3.20%)Rejected-Finance PLOT NO 783 JAIL ROAD JHARPADA BHUBANESWAR | BHUBANESWAR | KHURDHA | ODISHA | ₹32.5 L+₹1.0 L (3.20%) | L2 | Rejected-Finance Rejected in the financial evaluation stage. |
| 3 | L3₹32.9 L+₹1.3 L (4.26%)Rejected-Finance | ₹32.9 L+₹1.3 L (4.26%) | L3 | Rejected-Finance Rejected in the financial evaluation stage. |
Tender Value
₹33.5 L
EMD Value
₹33,600
Closing Date
6 Aug 2026, 5:00 pmClosed
Divisional Officer
SUPERINTENDING ENGINEER R AND B DIVISION PARALAKHEMUNDI
Electric Utility shifting for the work Improvement of Kashinagar K Sitapur road such as Construction of RCC drain and widening with paver blocks from 12/900 KM to 13/425 KM in the district of Gajapati under state plan for the year 2025-26
2026_EICCL_136778_1
SE PKD RandB DIVN 04/2026 27
Open Tender
Electrical Works
Percentage
90 days
Gajapati
2 documents required · 2 mandatory
₹6,000
₹33,600
Yes
8 Sept 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
23 Jul 2026 - 30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-I (Erection of 3Ph 3W 11KV Line with 80sqmm covered conductor= 0.280 ckm & 4Nos. guarding)
WPB 160x152 (30.44KG/Mtr.),11 mtr- with base plate 300x300x12 | 14 | nos | 29,350.88 | ₹4,10,912.32 |
| 2 | MS 11 KV 'V' Cross Arm (10.2Kg Each) | 12 | nos | 1,349.15 | ₹16,189.8 |
| 3 | MS 'F' Clamp (Pole top Bracket) (2.9Kg each) | 12 | nos | 399.75 | ₹4,797 |
| 4 | G.I. Back Clamp for 'V' Cross Arm (11KV) (0.85Kg Each) | 12 | nos | 133.25 | ₹1,599 |
| 5 | 100X50X6 mm, G.I. Channel St Cross arm 1.45Mtr @ 9.2Kg/mtr (6Nos) including top piece | 80.04 | kg | 124.92 | ₹9,998.6 |
| 6 | Galvanisation of all RS and MS materials | 157.2 | kg | 16.66 | ₹2,618.95 |
| 7 | 11 KV Disc Insulator (T & C) 45 KN Polymer | 9 | nos | 1,432.43 | ₹12,891.87 |
| 8 | Tension Assembly Wedge Type with Anchoring Clamp for 11 kV 80 Sqmm covered conductor | 9 | nos | 990.37 | ₹8,913.33 |
| 9 | 11 KV Pin Insulator (polymer) | 51 | nos | 333.12 | ₹16,989.12 |
| 10 | H.T. Stay set complete | 7 | nos | 1,748.9 | ₹12,242.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_602877.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.87 MB
Tendernotice_1.pdf
PDF • 1.14 MB
Tendernotice_3.pdf
PDF • 2.17 MB
BOQ_602877.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .