| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 CrAccepted-AOC | ₹10.2 Cr | L1 | Accepted-AOC Less Estimate Rate |
| 2 | L2₹10.5 CrRejected-Finance MADURAI | ₹10.5 Cr | L2 | Rejected-Finance Rate quoted above estimate rate |
Tender Value
₹10.8 Cr
EMD Value
₹10.8 L
Closing Date
28 Nov 2024, 3:00 pmClosed
Project Director
DRDA, Sivagangai
Construction of Bridge across Sarugani River along Muthupatti Paganeri road at ch. 2/2 at Panangudi Panchayatin Kallal Block at Sivagangai District.
2024_RDTN_497740_1
SCPAR_Bridge_Kallal
Open Tender
Civil Works
540 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10.8 L
17 May 2025
29 Oct 2024
28 Nov 2024
29 Oct 2024
28 Nov 2024
29 Oct 2024
Amount
Construction of Bridge across Sarugani River along Muthupatti Paganeri road at ch. 2/2 at Panangudi Panchayatin Kallal Block at Sivagangai District. SCPAR 2024-25
Dismantling the Existing Piped Causeway & Culvert in Cement Mortar in the existing causeway and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Removal Of Existing Bed Level Causeway
For PCC
Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.
Earthwork Excavation in all Classes of Soil Except Hardrock not Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for PILE CAP UNDER ABUTMENTS & PIERS.
Providing and Driving in position Permenent MS Liners for Piles from bottom of pile cap as per cl.709.1.4 of IRC 78 - 2014 (up to maximum scour level) including cost of liners and fabricating, welded construction with consumables, labour and plants and driving MS liner 6mm thick to be left permenantly with the pile shaft as per requirement and as per specification and placing them in position with all lead and lift etc complete.
Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1200mm diameter in vibrated RCC M35 using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another pile location, dismantling them and reerceting as necessary including all labour for driving or boring and providing temporary casing where required through all soils, leading the excavated earth to a distance of 200m including forming of working platform over the river bed of acomodating piling equipment including working platform etc., forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for casting pile cap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW PIERS AND ABUTMENTS.
Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Pile Cap Abutments & Piers.
Vibrated Reinforced Cement Concrete of Grade M 35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Pilecap.
Vibrated RCC of Grade M 35 grade using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Abutment and Returns Wall above Sill.
Vibrated Reinforced Cement Concrete of Grade M 35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier above Sill.
Vibrated Reinforced Cement Concrete of Grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Dirt wall and Bedblock.
Vibrated Reinforced Cement Concrete of Grade M 35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Capping Beam above Column Pier (Above Sill).
Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications, for RCC Pedestal over Bedblock and Capping Beam.
Supplying and Fixing of Elastomeric Bearing of required size as shown in the drawing including coast and conveyance to work site, labour for fixing the bearing in position and all other incidental charges., complete for ELASTOMERIC BEARING.
Vibrated Reinforced Cement Concrete of Grade M 35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC T- Beam & Cross Beam Girder.
Vibrated Reinforced Cement Concrete of Grade M 35 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Deckslab.
Providing and Fixing Seepage Pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm Dia Semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS.
Providing Filter Media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for Filling Behind the Abutment and Wings.
Supplying and Installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works-IV Revision; 2001 Published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications.
Vibrated Cement Concrete of Grade M 15, using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASECOURSE BELOW APPROACH SLAB.
Vibrated Reinforced Cement Concrete M 30 Grade using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for Approach Slab.
Add Supply and Fixed of High Quality PVC Pipe of 100mm dia including cost and Conveyance of Pipe to Site for providing utility services to footpath.
Vibrated Cement Concrete M30 using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing Coat of 75mm uniform thickness over Deck Slab and Approach Slab.
Vibrated Reinforced Cement Concrete of Grade M 40 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Crashbarrier.
Vibrated Cement Concrete M20 Grade using 40mm, 20mm & 12mm ISS Size Hard Granite Broken Metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights for PARAPET WALL OVER WINGS.
Providing and Fixing of Cast Iron Drainage Spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc., complete.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, Conforming to IS:1786 2008, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 Grade.
Approach Road
Excavation Including Removal and Satisfactory Disposal of all materials necessary for the Construction of Road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using the carted earth with a lead of 2km for Formation.
98% Compaction
100% Compaction
Collection and Supply of Gritty Gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc. complete, for SHOULDERS.
Construction of Granular Sub - Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 GSB-III.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and Laying of Prime Coat using Emulsion at the Rate of 7 Kg per Ten Square Meter Over the WMM surface preparatory to another Bituminous Construction Over it.
Providing and laying Tack Coat Over WMM Surface (treated with primer) using 2.5Kg of Bitumen Emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
[BM (Grade-II) 50mm Thick Using VG30] Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 [BITUMINOUS MACADAM 50 MM THICK]
BITUMINOUS CONCRETE 25/30/40 MM THICK USING CMP (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Diversion Road
Excavation Including Removal and Satisfactory Disposal of all materials necessary for the Construction of Road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using the carted earth with a lead of 2km for Formation.
98% Compaction
Construction of Granular Sub - Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 GSB-III.
Providing and Laying Spreading and Compacting Graded Stone Aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5.
Providing and Laying Reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry.
Provision for RCC Box Culvert
Dismantling the Existing Piped Causeway & Culvert in Cement Mortar in the existing causeway and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Removal Of Existing Slab Culvert
For RCC
For PCC
Earthwork Excavation in all classes of Soil Except Hardrock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION.
Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Foundation Concrete (Below Box Culvert).
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Box Culvert.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RETAINING WALL.
Vibrated Reinforced Cement Concrete of Grade M 40 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Crashbarrier on Top of Box Culvert.
Providing and Fixing Seepage Pipes of 100 mm dia PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm Dia Semi spherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS.
Providing and Making Gabion Struture with mechanically woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes as per IS 16014:2021, MORTH Clause 2500, of required size, Mech Type 10 x 12 (D=100mm with tolerance of +- 2%) Zinc Coated, Mesh Wire diameter 3.0mm, mechanically edged / selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200mm as per drawing, all complete as per direction of Engineer-in-Charge.
Filling behind Retaining Walls with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the Retaining walls.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe 500, conforming to IS:1786 2008, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the Reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete Fe 500 Grade.
Provision for Retaining wall (RCC)
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for FOUNDATION UNDER RETAINING WALL.
Plain Cement Concrete M15 Grade using 40mm, 20mm & 10mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for Levelling Course Below Retaining Wall.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm and below HBG graded metal including cost and conveyance of all materials to site excluding cost of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Footings of Retaining Wall.
Vibrated reinforced Cement Concrete of grade M 35 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Stem of RCC RETAINING Wall BELOW SILL LEVELS.
Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVELS.
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the Backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
Supply and Fabrication of STEEL Grade Fe 500 with suitable anticorrosive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete., Fe 500 Grade.
Provision for Retaining wall (RCC)
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for FOUNDATION UNDER RETAINING WALL.
Plain Cement Concrete M15 Grade using 40mm, 20mm & 10mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for Levelling Course Below Retaining Wall.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm and below HBG graded metal including cost and conveyance of all materials to site excluding cost of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Footings of Retaining Wall.
Vibrated reinforced Cement Concrete of grade M 35 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Stem of RCC RETAINING Wall BELOW SILL LEVELS.
Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVELS.
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the Backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
Supply and Fabrication of STEEL Grade Fe 500 with suitable anticorrosive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete., Fe 500 Grade.
Provision for Retaining wall (PCC)
Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAINING WALL.
Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications For Levelling Course Below Abutments & Footing of Retaining Wall.
Vibrated Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification etc, for FOOTINGS OF RETAINING WALLS.
Vibrated Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS.
Providing and Fixing Seepage Pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm Dia Semi spherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS.
Provision for Apron
Earthwork Excavation in all classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION FOR APRON.
Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (Base Course for Apron).
Provision for White Washing & Painting
Whitewashing of Abutments, Piers & Wing Walls using two Coats of Freshly Burnt Shell Lime
Plastic Emulsion Painting for Crashbarrier and Handrails using two coats of Enamel Paint.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Balaji Builders (BID ID -1192933)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid