Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC BHATTACHARIYA PARA SURI BIRBHUM | SURI | BIRBHUM | WEST BENGAL | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹5.6 L+₹3,540 (0.64%)Rejected-AOC NICHUPATTY BOLPUR BIRBHUM | BIRBHUM | WEST BENGAL | 713129 | L2 | Rejected-AOC Being L2 Bidder | |
| 3 | L3₹5.6 L+₹5,616 (1.01%)Rejected-Finance NICHUPATI BOLPUR BIRBHUM | BOLPUR | BIRBHUM | WEST BENGAL | 731204 | L3 | Rejected-Finance Being L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹11,261
Closing Date
20 Nov 2024, 12:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E P.W.DTE BIRBHUM ELECTRICAL DIVISION
Ofc of The EXECUTIVE ENGINEER P.W.DTE. Birbhum Electrical Division P.O. Suri, Dist Birbhum, Pin 731101
Day to day operation of 02 Two Nos of 08 Eight passengers lift at prashasan Bhaban, Suri for the period of 01 One year including all holidays.
2024_WBPWD_768229_1
BIRED/121/e-NIQ (1st call) of 2024-2025
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
SURI
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,261
OFFICE OF The EXECUTIVE ENGINEER P.W.DTE. Birbhum
27 Jan 2025
11 Nov 2024
22 Nov 2024
11 Nov 2024
20 Nov 2024
14 Nov 2024
14 Nov 2024
Amount
Day to day operation of 02 (Two) Nos of 08 (Eight) passengers lift at prashasan Bhaban, Suri for the period of 01 (One) year including all holidays, in 02 (Two) nos. lift operator with valid lift attendant's authorisation duly issued by licencing board Govt of West Bengal. The Agency has to depute : i) Two (02) Semi-skilled Lift operator/ attendants in General shift or in the shift as per direction of EIC for 02 (Two) Nos of 08 (Eight) passengers lift. Period- 12 months
Logistic & service Charge for new dress (2 Nos), cleaning of dress, all kind of register, all instruments Vaccume Cleaner, Blower etc) and tools like, Mobile (with sufficient balance), Thinner, Hand gloves, jute or wiping clothe,safety shoe,Yellow colour helmet, safety belt, ladder (Al and Wooden) as per requirenment etc.
TERMS & CONDITIONS :- (1) The contractor has to depute 01 no. Lift Operator / Attendant (Semi-Skilled labour) per shift per day for 2 shifts in a day (including suitable substitutes for those on leave) throughout the year having a sound knowledge for operation of the Lift satisfactorily with valid Lift Attendant’s Authorisation duly issued by the Licensing Board, Govt. of West Bengal. (2) The Lift Operator/Attendant should be dutiful and polite to all. He has to keep watch on the Lift for any difficulties. (3) The report is to be submitted periodically about the condition of the lift & all of its accessories with safety devices to the concerned Assistant Engineer(Electrical) & Junior Engineer(Electrical). (4) The lift enclosure should be kept clean regularly by the operator. (5) Penalty may be imposed for non-operation of the Lift in time as well as for absence of the operational staff. The decision of the Executive Engineer(Electrical) will be final in this respect. (6) The agency should be responsible for any damage to the Lift due to mishandling / mal-operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per direction of E.I.C. and the accused staff should be replaced immediately.
(7) The contract may be terminated with one month’s notice from either side. (8) The agency shall maintain one attendance register at site, to be signed regularly by the staff on duty and the same should be authenticated/verified by the concerned Junior Engineer(Electrical) and Assistant Engineer(Electrical). The copy of this Attendance Register duly counter signed by the concerned Assistant Engineer(Electrical) should be submitted along with the bill quarterly. (9) The agency should must submit P.F and E.S.I’s challan and payment acknowledgement document of the respective Lift Operators/Attendant during submission of bill. (10) Bills should be submitted at the end of every three month with the certification of concerned Engineers on satisfactory completion. (11) The agency must have their office & Telephone contact with Mobile no. and the same should be intimated to this Department in writing. The telephone call should be responded without delay. (12) The agency shall provide photo identity cards to all the maintenance staff employed, including substitutes. (13) The agency will have to immediately replace any or all members of the Lift operational staff, who has been reported against. (14) Any shut down or fault should be brought to the notice of EIC immediately in writing and over telephone for further course of action.
(15) The Department would not be held responsible for any accident of the Liftman on duty for any reason. The Contractor or their Lift Operator would not claim any compensation in any shape from this department for such accident. (16) The agency should submit a copy of the Duty Roster of the Lift Operator at the beginning of each month (or as directed time to time) to the concerned Junior Engineer(Electrical) and the concerned duty officers of Prashasan Bhaban, Sur.
(17) Valid Authorisation Letter duly issued by the Licensing Board, Identity proof etc. are to be furnished for each Lift Operator / Attendant engaged by the concerned agency along with the name & contact no. of the persons and all these information with supporting documents are to be submitted in written to the concerned Junior Engineer(Electrical), Assistant Engineer(Electrical) & Executive Engineer(Electrical). (18) If any kind of incapability & negligence are noticed in observing all the above-said terms & conditions, this Department posses the right to deduct the cost from the bills of the contractor on pro-rate basis as determined by the Engineer-In-Charge. In that case, the above-said contract may be terminated without issuing any notice and Stringent & punishable action may be taken against the contractor. (19) No. quotation with price variation clause will be accepted. Rates offered should be stable for the entire period of maintenance. (20) The agency has to obey the labour department rules strictly.
The philosophy of “Public Interest” would be the MOTTO of this maintenance contract. Any deviation may be viewed otherwise. If any kind of incapability & negligence are noticed in observing all the above-said terms & conditions causing inconveniences to public service, is subject to unilateral penalty, be it detected on the spot or thereafter (even after payment). This Department also reserves the right to deduct the cost from the bills of the contractor on pro-rata basis as determined by the Engineer –In-Charge for any shortfall in observing above T&C. In that case, the above-said contract may be terminated without issuing any notice and Stringent & punishable action may be taken against the contractor.
N.B: i) Rate should be Quoted per Month basis. ii) Payment will be made after availability of fund from concern Department. iii) Payment will be made as per P.W.D norms.
MOON LIGHT (BID ID -5765208)
NARAYAN CHANDRA DAS (BID ID -5765342)
technical_1701085.pdf
PDF • 0.22 MB
techsummary_1701085.pdf
PDF • 0.44 MB
finance_1701085.pdf
PDF • 0.20 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_1701085.pdf
PDF • 0.10 MB
AOC.pdf
PDF • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .