Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.6 LAccepted-AOC KAPILA NIWAS MASIT WALI GALI UNA TEHSIL DISTT UNA H P | L-1 | Accepted-AOC ok | |
| 2 | L-2₹18.4 L+₹1.8 L (11.0%)Rejected-AOC R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | L-2 | Rejected-AOC ok | |
| 3 | Rejected-Technical LUDHIANA | - | Rejected-Technical As per technical Evaluation Bids | |
| 4 | Rejected-Technical VILLAGE PO MALAHAT TEHSIL DISTRICT UNA HP | - | Rejected-Technical As per technical Evaluation Bids |
Tender Value
Refer Docs
EMD Value
₹23,200
Closing Date
19 May 2021, 9:00 amClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 2 Construction of Missing CD on Badehar Khuhi Pekhubela road km.0-0 to 3-600 Sub Head Construction of 3mtr. span RCC culvert at RD.1-540.
2021_PWD_47358_1
Job 2 Construction of Missing CD on Badehar Khuhi
Open Tender
Civil Works - Others
Item Rate
30 days
Una
Please refer to Bidding Documents
13 documents required · 13 mandatory
₹500
Executive Engineer, Una Division, HPPWD, Una
₹23,200
3 Jul 2021
12 May 2021
19 May 2021
12 May 2021
19 May 2021
12 May 2021
Amount
Dismantling of existing structures like culverts , bridges, retaining walls and other structure comprising of masonry , cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary , sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material within any leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. a) Plain cement concrete
Reinforcement cement concrete
Dismantling of existing structures like culverts , bridges, retaining walls and other structure comprising of brick masonry ,including disposal of unserviceable material and stacking the serviceable cement mortor including carriage of material within any leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Removing all types of hume pipes and stacking within any leads and lifts includig earth work and dismantling of masonry works as per technical specification clause 202 above 600mm to 900mm humepipe . including carriage of materials within all leads and lifts and other incidential . The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Earth work in excavation for all type of road structure and all type of on classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) such as retaining walls, breast walls, culverts, drains and parapets etcetera as per drawings and technical specification clause 305.1 and as per direction of the Engineer- In – Charge including carriage of materials within all leads and lifts and other incidential . The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation/ for all type structure complete of plain cement concrete nominal mix 1:4:8 ( One cement :four sand:eight graded crushed /broken stone aggregate 20mm (twenty Millimeter) nominal size in or under wateror ground complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge ,including carriage of material within all leads and lifts and other incidential.The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation/ for all type structure complete of plain cement concrete grade M-10 (M-Ten) with cement contents not less than 250kg(Two hundred fifty kilogram) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced cement concrete in substructure upto all heights of culverts or all type of structure complete of plain cement concrete standard concrete design mix of grade M-15 (M-fifteen) with cement contents not to be less than 275 kg.(two hundred seventy five kilogram)per cubic metre ) in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.804,805,806,807,1202 and 1204 as per the direction of the Engineer-in- chargeincluding carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced cement concrete in substructure upto all heights for all type structure complete of reinforced cement concrete standard concrete design mix of grade M-20 (M-twenty) with cement contents not to be less than 350kg.(three hundred fifty kilogramme)per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.804,805,806,807,1202 and 1204 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced cement concrete in open foundation upto all heights for all type structure complete of reinforced cement concrete standard concrete design mix of grade M-25 (M-twenty five)with 20mm(twenty millimetre) nominal size with cement contents not less than 400kg.(four hundred kilogram) per cubic metre and curing complete in all heights complete as required at site which may arise for all heights/ depths including the cost of form work with steel plates as per drawings and technical specification Clause 800, 1205.4 and 1205.5 as per the direction of the Engineer-in- charge ,including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Supplying fitting and placing HYSD bar in reinforcement in substructure complete as per drawing and technical specification clauses—1002,1005,1010 and 1202 including cutting, bending binding and placing in position complete in all respect including cost of binding wire in all heights including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Supplying fitting and placing HYSD bar in reinforcement in superstructure complete as per drawing and technical specification clause—1002,1010 and 1202 including cutting, bending binding and placing in position complete in all respect including cost of binding wire in all heightsincluding carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing weepholes in brick masonry/ stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100mm(hundred milimetre)dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H)(one vertical twenty horzontial) towards drawing face complete as per drawings and technical specification clause 614,709,1204.3.7 including carriage of material within all leads and lifts and other incidential. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundations upto all heights for all type structure complete of plain with cement concrete standard concrete design mix of grade M-20 (M-twenty) cement contents not less than 350kg.(three hundred fifty kilogram) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803,1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Construction of embankment with approved materials obtained from borrow pits and transported to the sirte spreading in layers of suitable thickness and exceeding 200mm( two hundred millimeters) and compacted with 80-100 KN.static/ vibratory road roller to meet the requirements of table 300.1 and 300.2 specifications to lines,grades,level and cross sections as per drawings or directions of the Engineer-in-charge including preparation of foundation for embankment in all kinds and classification of soils including saturated soil and dewatering/ bailing out of water wherever required including handling of materials for construction of embankment within all leads and lifts.The rate shall include carriage of machineries, equipment, tolls and materials and safety measures, payment of all taxes and octori incidentials necessary to complete the work in all respect as per direction of the Engineer-in-charge including carriage of material within all leads and lifts and other incidentials.The rates are inclusive octori, royality, malkhana, toll tax sale tax or other taxes imposed by the Govt.
Construction of Granular Sub Base by providing well graded material, spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC , and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause for grading I material including carriage of materials within all leads and lifts and other incidentals The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing , laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (pug mill) carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN (Eighty to hundred kilo newton) capacity to achieve the desired density including lighting barricading and maintenance of diversion etc. as per tables 400.11 & 400.12 and technical specification clause 406. including carriage of material within all leads and lifts and other incidentials.The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and applying evenly a prime coat with bitumen emulsion(SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg (zero point seven zero to one point zero ) per square metre using mechanical means as per technical specification and as per direction of Engineer-in-charge including carriage of material within all leads and lifts and other incidential. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.25 to 0.30 kg.per sqm(Zero point two five to zero point three zero )per square metre.on the prepared granular surfaces treated with primer and cleaned with Hydraulic broom as per technical specification .clause 503 including carriage of material within all leads and lifts and other incidential. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing laying and rolling of open grades premix carpet of 20mm ( twenty millimeter) thickness composed of Type-A 13.2mm ( thirteen decimal two millimeter) to 5.6mm ( five decimal six millimetre aggregate at the rate of 0.27 cum(zero point two seven cubic metre)mixed with using penetration VISCOSITY GRADE-10(TEN)PAVING BITUMEN at the rate of 14.6kg(fourteen point six kilogramme)per 10sqm(ten square metre)of road surface to required line,grade and level to serve as wearing course on a previously prepared base, including mixing and heating binder and aggregate suitable plant laying and rolling with a three wheel 80-100 ( eighty to hundred )KN static road roller manually capacity finished to required level and grade to be followed by seal coat as per . technical specifications clause No. 508 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer – in- Charge including carriage of material within all leads and lifts and other incidential. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying seal coat for sealing the voids in a bituminous surface laid to specified level grade and cross fall using type-B as per technical specification clause 510 using VISCOSITY GRADE-10(TEN) PAVING BITUMEN at the rate of 6.8kg(six point eight kilogram)premixed with 0.06cum(zero point six) cubic metre of fine aggregate per 10 Sqm. ( Ten square metre) heated in mini hot mix plant and laying manually of mixed material and rolling with power road roller 8-10 ( eight to ten capacity) including carriage of material labour and equipment required to execute the work to the site of work complete in all respect including carriage of material within all leads and lifts and other incidential. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Balbir Singh Govt Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .