| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹29.2 L+₹1.1 L (3.73%)Rejected-Finance | L2 | Rejected-Finance Highly Quoted | |
| 3 | Rejected-Technical | - | Rejected-Technical Non-Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non-Responsive |
Tender Value
₹24.2 L
EMD Value
₹48,000
Closing Date
26 Aug 2021, 5:00 pmClosed
Sr. Manager(PnC)
Rangit Power Station,Rangit Nagar,South Sikkim
Restoration of river training works below Tower No.1 and 2 at right bank of Power House at Rangit Power Station
2021_NHPC_642035_1
NH/RPS/PHC011(13)/2/2021-PH C/001720/166
Open Tender
Civil Works
Works
90 days
Rangit Power Station, Rangit Nagar, South Sikkim
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
NHPC Limited
₹48,000
8 Jan 2022
6 Aug 2021
1 Sept 2021
6 Aug 2021
26 Aug 2021
6 Aug 2021
Earth work in excavation by mechanical means (Hydraulic Excavator )/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and Laying in position cement concrete of 1:2:4 mix. (1 cement, 2 coarse and, 4 graded stone aggregate of 20mm & down size) including compacting curing etc all complete
Providing and Laying in position specified grade of reinforced cement concrete excluding the cost of form work, finishing and reinforcements.1:1.5:3 Mix (1cement, 1.5 coarse sand 3 graded stone aggregate 20mm and down nominal gauge)
Supplying, bending and placing in position tor- steel reinforcement in all R.C.C works including cost of binding wires, all complete.
Providing, fixing & removing form work for casting R.C.C items for walls with imported timber from outside the state wall.
Providing and Laying Random Rubble Stone Masonry in 1:3:6 c.c. (1cement, 3 sand, 6 clean hard graded stone chips, size 40mm gauge) including bond stone, through stone of size 150mm x 150mm x 450mm manufactured in 1:4:8 (1cement, 4 clean coarse sand, 8 clean hard stone aggregate of size 40 mm and down) and curing etc, complete as per the direction of Engineer in Charge, excluding the cost of carriage of materials
Providing and Laying in position cement concrete of specified grade including compacting curing etc all complete.1:1.5:3 (1cement, 1.5 coarse sand,3 graded stone aggregate of 20mm & down size)
Providing, fixing & removing form work for casting R.C.C items as indicated below: with imported timber from outside the state)--Wall
Providing and laying dry stone masonry for any thickness of wall, brought to course roughly with hammer dressed to give uniform face; for construction of wall such as retaining, breast, and gabion or like etcetera with or without batter in straight / curvature (In plan) including laying of bond stone (Through stone, for wall thicker than 60 cm, bond stones may be of two pieces placed side by side overlapping at least 15 cm) up to wall height of 6.00 meter and an initial lead up to 30 meters. The face stone shall be comparatively larger with hammer dressed to secure closed joint so that the stones when laid will come into close proximity and to give uniform front face. (The rate is exclusive of taxes , transportation /mechanical carriage , loading ,unloading and stacking but inclusive of royalty for stone )
Supply of GI wire made from 8BWG galvanized steel wire and weaving @2.14kg per sqm for making of mesh having opening size 125x125mm including launching and fixing of wire net in position, (including overlap & wastage at 15%) for construction of hand packed wall in hilly terrain and like etc complete as per direction of Engineer-in-charge within a lead of 30m. consumption of GI wire for work execution shall be at 2.48kg/sqm (the rate is exclusive of taxes, transportation/ mechanical carriage, loading, unloading and stacking but inclusive of 12% premium over the basic rate of SSOR'12 for GI wire)
Head load of non-stock materials for a distance beyond 30 m and within 100 m distance
Head load of stock materials for a distance beyond 30 m and within 100m distance.
Loading and Unloading of Stone Boulder/ Stone aggregates/ Sand/ Kanker/ Moorum.
Loading and Unloading of Cement or Steel by Manual Means and Stacking.
Cost of Haulage Excluding Loading and Unloading Surfaced Road.
Head load of stock materials - Cement for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under sub- head "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
Head load of stock materials - Steel for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under sub- head "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
Head load of non-stock materials - Sand, stone aggregate below 40 mm nominal size for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under sub- head "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
Head load of non-stock materials - Soling stone /Stone for a distance beyond 100 m and for every additional lead of 50 meter or part thereof etc complete. The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead "Carriage of Materials" (These rates are inclusive of Contractor's profit and over heads but exclusive of GST) upto 200m
M/S MAHAMAYA CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .