Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAdmitted-Finance | ₹25.0 L | L1 | Admitted-Finance |
| 2 | L2₹25.8 L+₹77,340 (3.09%)Admitted-Finance | ₹25.8 L+₹77,340 (3.09%) | L2 | Admitted-Finance |
| 3 | L3₹27.2 L+₹2.2 L (8.92%)Admitted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹27.2 L+₹2.2 L (8.92%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAMESH ENTERPRISES L3 | RMS CONSTRUCTION L1 | SEKAR AND SONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing services for collection, loading, transportation, unloading and proper stacking/disposal of piled-up waste materials from various locations in the laboratory buildings of Indira Gandhi Centre for Atomic Research to the designated storage/disposal area within the campus, as directed by the Engineer-in-Charge. The scope includes handling of all types of non-hazardous scrap materials such as old cupboards, furniture, tables, metal scrap (MS/SS), aluminium items, dismantled materials and other miscellaneous waste. The work shall be carried out by deploying required labour, tools, tackles and suitable transport vehicles, ensuring safe handling, segregation (wherever required), and neat stacking at site. The rate shall include all leads, lifts, loading, unloading, transportation, labour, equipment, safety measures and all incidental charges, complete. | 35 | M.T. | 10,500 ₹3,67,500 | 9,546 ₹3,34,110 Lowest | 17,000 ₹5,95,000 |
| 2.00 | Collection of garbage / soil / Rock / refused materials like jungle Cutting materials, wild vegetation and periodic cleaning of dust bins, Dumped debris road sides of FBTR / DFRP Complex areas conveying to dumping yard, including loading, unloading, dumping, and levelling in dumping yard etc. including required labour, tools, hand saw, arc and mechanical transport with lead beyond 4 .00 km upto 5.00 kilometres as directed by the Engineer -in-charge. Note: This item operates for only manual loading Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. and 50% in respect of garden wastes, tree branches & Bin Wastes 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | 1,000 | Cu.m. | 300 ₹3,00,000 | 280 ₹2,80,000 Lowest | 320 ₹3,20,000 |
| 3.00 | Leveling, bull dozing the heaped / dumped loosened earth, debris etc., by hiring Excavator 140 Model (Poclain) including including Transporting, operating the vehicle, operating the vehicle by engaging driver/operator with valid driving license, diesel charges, insurance and admissible taxes, labour if any required etc. complete all as directed by Engineer-in-Charge. | 200 | Hours | 2,200 ₹4,40,000 | 2,500 ₹5,00,000 | 1,500 ₹3,00,000 Lowest |
| 4.00Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | ||||||
| 4.01 | Lead charges for lead exceeding 5 kilometre but not exceeding 6 kilometre | 2,000 | Cu.m. | 320 ₹6,40,000 | 280 ₹5,60,000 | 250 ₹5,00,000 Lowest |
| 5.00 | Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment’s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, sag rod, square sections etc. including chamfering and rounding off the edges, applying painting as described below of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: 1. Lifting device arrangements if any required also arranged by the contractor at his own cost. 2. Painting two coats of polyurethane paint with one under coat of suitable Epoxy/PU primer of approved make and colour as directed by the Engineer-in-Charge. | 1.7 | M.T. | 1,20,000 ₹2,04,000 Lowest | 1,22,000 ₹2,07,400 | 1,30,000 ₹2,21,000 |
| 6.00 | Providing and fixing G.I. chain link fencing conforming to IS:2721 of required width in mesh size 50x50mm, made of G.I. wire 3.15mm diametre including strengthening with top and bottom line wire 4mm diametre, (4mm diametre line wire at top, bottom & middle to be provided incase fencing height exceeds 2m) cutting of chain link & wires to required length, spreading, fixing & binding chain link to fencing post with 18 gauge binding wire including cost of GI bolts and washers and wire etc., complete in all respects all as per specifications & directed by the Engineer-in-Charge. | 620 | Sq.m. | 1,050 ₹6,51,000 | 800 ₹4,96,000 Lowest | 800 ₹4,96,000 Lowest |
| 7.00Earthwork excavation by mechanical means (Hydraulic excavator) for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge. | ||||||
| 7.01 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 20 | Cu.m. | 600 ₹12,000 | 550 ₹11,000 | 450 ₹9,000 Lowest |
| 8.00 | Providing and laying plain cement concrete 1:2:4 using 25mm maximum size graded aggregates and and crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | 8 | Cu.m. | 6,000 ₹48,000 Lowest | 6,500 ₹52,000 | 9,500 ₹76,000 |
Tender Value
₹30.6 L
EMD Value
₹61,180
Closing Date
22 Jul 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Removal of laboratory waste, cleaning of dump yard and providing fencing in IGCAR, Kalpakkam during the year 2026-2027.
2026_IGCAR_916377_1
CEG/IGC/2214/2026
Open Tender
Civil Works
Item Rate
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹61,180
18 Aug 2026
8 Jul 2026
23 Jul 2026
9 Jul 2026
22 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing services for collection, loading, transportation, unloading and proper stacking/disposal of piled-up waste materials from various locations in the laboratory buildings of Indira Gandhi Centre for Atomic Research to the designated storage/disposal area within the campus, as directed by the Engineer-in-Charge. The scope includes handling of all types of non-hazardous scrap materials such as old cupboards, furniture, tables, metal scrap (MS/SS), aluminium items, dismantled materials and other miscellaneous waste. The work shall be carried out by deploying required labour, tools, tackles and suitable transport vehicles, ensuring safe handling, segregation (wherever required), and neat stacking at site. The rate shall include all leads, lifts, loading, unloading, transportation, labour, equipment, safety measures and all incidental charges, complete. | 35 | M.T. | - | - |
| 2 | Collection of garbage / soil / Rock / refused materials like jungle Cutting materials, wild vegetation and periodic cleaning of dust bins, Dumped debris road sides of FBTR / DFRP Complex areas conveying to dumping yard, including loading, unloading, dumping, and levelling in dumping yard etc. including required labour, tools, hand saw, arc and mechanical transport with lead beyond 4 .00 km upto 5.00 kilometres as directed by the Engineer -in-charge. Note: This item operates for only manual loading Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. and 50% in respect of garden wastes, tree branches & Bin Wastes 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | 1,000 | Cu.m. | - | - |
| 3 | Leveling, bull dozing the heaped / dumped loosened earth, debris etc., by hiring Excavator 140 Model (Poclain) including including Transporting, operating the vehicle, operating the vehicle by engaging driver/operator with valid driving license, diesel charges, insurance and admissible taxes, labour if any required etc. complete all as directed by Engineer-in-Charge. | 200 | Hours | - | - |
| 4Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 4.01 | Lead charges for lead exceeding 5 kilometre but not exceeding 6 kilometre | 2,000 | Cu.m. | - | - |
| 5 | Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment’s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, sag rod, square sections etc. including chamfering and rounding off the edges, applying painting as described below of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: 1. Lifting device arrangements if any required also arranged by the contractor at his own cost. 2. Painting two coats of polyurethane paint with one under coat of suitable Epoxy/PU primer of approved make and colour as directed by the Engineer-in-Charge. | 1.7 | M.T. | - | - |
| 6 | Providing and fixing G.I. chain link fencing conforming to IS:2721 of required width in mesh size 50x50mm, made of G.I. wire 3.15mm diametre including strengthening with top and bottom line wire 4mm diametre, (4mm diametre line wire at top, bottom & middle to be provided incase fencing height exceeds 2m) cutting of chain link & wires to required length, spreading, fixing & binding chain link to fencing post with 18 gauge binding wire including cost of GI bolts and washers and wire etc., complete in all respects all as per specifications & directed by the Engineer-in-Charge. | 620 | Sq.m. | - | - |
| 7Earthwork excavation by mechanical means (Hydraulic excavator) for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge. | |||||
| 7.01 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 20 | Cu.m. | - | - |
| 8 | Providing and laying plain cement concrete 1:2:4 using 25mm maximum size graded aggregates and and crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | 8 | Cu.m. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_963201.xls
BOQ • 0.28 MB
2214technicalbid.pdf
Tender Documents • 2.45 MB
2214Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
2214FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .