| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.1 L (3.49%)Admitted-Finance 9 K K NAGAR 10TH STREET POLICE QUARTERS ROAD GANAPATHY COIMBATORE 641 006 | COIMBATORE | TAMIL NADU | 641006 | ₹1.2 Cr+₹4.1 L (3.49%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI BANU CONSTRUCTIONS L2 | SARASWATHI & CO L1 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing old mettaled surface from 50mm to 100mm thick surface without damaging the exisiting base course and cleaning the site etc, complete. | 1,797 | m2 | 20 ₹35,940 Lowest | 20 ₹35,940 Lowest |
| 2.00 | Earth Work Excavation in all Soil with Initial Lead and Left etc., Complete a) Ordinary Soil (SS 20 A) Earth work excavating and depositing on bank with intial lead of 10 m & initial lift of 2 m in and, silt or other loose Soil, Wet Sand or silt not under water, light black cotton soil sandy loam and 106.25 cum 116.88 ordinary soil including excavated earth (SS 20 A) | 1,637 | m3 | 70 ₹1,14,590 | 50 ₹81,850 Lowest |
| 3.00 | Removal of Excavated Excess Earth away from the site to 15 K.M including loading and transportation charges etc, complete as per standard | 1,310 | m2 | 110 ₹1,44,100 | 100 ₹1,31,000 Lowest |
| 4.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. | 14 | m3 | 1,700 ₹23,800 | 1,600 ₹22,400 Lowest |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 763 | m3 | 2,200 ₹16,78,600 | 2,100 ₹16,02,300 Lowest |
| 6.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 10,168 | m2 | 90 ₹9,15,120 | 80 ₹8,13,440 Lowest |
| 7.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 10,168 | m2 | 20 ₹2,03,360 Lowest | 20 ₹2,03,360 Lowest |
| 8.00 | Dense bituminous mecadam Providing and laying 50 mm compacted thick compacted bituminous macadam using 0.24 cum of 26.5-11.2 to 2.8 mm graded metal and 0.25 cum of 13.2- 2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 38 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20- 30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental chargesetc.,complete using C M P clause 505 of MORTH Rev-5 | 509 | m3 | 10,800 ₹54,97,200 | 10,511.85 ₹53,50,531.65 Lowest |
| 9.00 | Providing and laying Bituminous concrete to 30mm thick using 10% plastic waste and 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG30/ VG40 bitumen,5.03 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm /30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 306 | m3 | 11,100 ₹33,96,600 | 11,000 ₹33,66,000 Lowest |
| 10.00 | Road marking with hot applied Thermoplastic compound with reflectorising glass benads on bituminous suface.Providing and laying of hot applied thermoplastic compound 2.5mm exclusive of surface applied glass beads as per IRC 35.The finished surface to be level,uniform and free form streaks and holes. | 27 | m2 | 850 ₹22,950 | 800 ₹21,600 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.4 L
Closing Date
29 Sept 2022, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Big bazaar street, Town hall, Coimbatore-1
Restoration of BT Surface at Periyar nagar main road and cut Road at Ward no .07, and Restoration of BT Surface at L.N. Nagar Main Road and Cut Road at Ward no .8 and Restoration of BT Surface at Ashok Jee nagar at Ward no .9, Restoration of BT Surfa
2022_MAWS_251612_2
e-43/2022 TURIP 2022-23 TWO COVER
Open Tender
Civil Works
Works
180 days
East Zone package-2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.4 L
JNNURM Conference Hall, Coimbatore Corporation
3 Oct 2022
14 Sept 2022
29 Sept 2022
14 Sept 2022
29 Sept 2022
14 Sept 2022
21 Sept 2022
Amount
Picking the existing old mettaled surface from 50mm to 100mm thick surface without damaging the exisiting base course and cleaning the site etc, complete.
Earth Work Excavation in all Soil with Initial Lead and Left etc., Complete a) Ordinary Soil (SS 20 A) Earth work excavating and depositing on bank with intial lead of 10 m & initial lift of 2 m in and, silt or other loose Soil, Wet Sand or silt not under water, light black cotton soil sandy loam and 106.25 cum 116.88 ordinary soil including excavated earth (SS 20 A)
Removal of Excavated Excess Earth away from the site to 15 K.M including loading and transportation charges etc, complete as per standard
Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No.
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Dense bituminous mecadam Providing and laying 50 mm compacted thick compacted bituminous macadam using 0.24 cum of 26.5-11.2 to 2.8 mm graded metal and 0.25 cum of 13.2- 2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 38 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20- 30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental chargesetc.,complete using C M P clause 505 of MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 10% plastic waste and 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG30/ VG40 bitumen,5.03 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm /30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road marking with hot applied Thermoplastic compound with reflectorising glass benads on bituminous suface.Providing and laying of hot applied thermoplastic compound 2.5mm exclusive of surface applied glass beads as per IRC 35.The finished surface to be level,uniform and free form streaks and holes.
Providing and fixing of road studs 100x100mm diecast in aluminum resistant to corrosive effect of salt and grit, fitted with lens reflectors, installed in concrete of asphaltic surface by drilling hole 30mm. Up to a depth of 60mm. and bedded in a suitable bituminous grout of epoxy mortar, etc. Complete. (as per BS : 873 (PART 4) 1973).
SRI BANU CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
ITB.pdf
Additional Documents • 0.05 MB
Pkg2.pdf
Tender Documents • 0.35 MB
BOQ_297818.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .