| 1 | L1₹15.4 LAccepted-AOC PLOT NO 39 HIGH STREET VGN TRINITY GARDEN TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹16.7 L+₹23,517 (1.43%)Rejected-AOC | L2 | Rejected-AOC Not Considered |
| Sl No | Description | Qty | Unit | H.Venkateswaran L2 | Phoenix Engineering L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing Heavy Jungle | 240 | Sqm | 6 ₹1,440 | 5 ₹1,200 Lowest |
| 2.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. | 80 | cum | 210 ₹16,800 | 200 ₹16,000 Lowest |
| 3.00 | Supply and Filling in foundation and basement with M.sand including cost of all materials, labour, consolidation, lead, lift, etc., complete as per the direction of Engineer. | 12.7 | cum | 400 ₹5,080 Lowest | 500 ₹6,350 |
| 4.00 | Plain cement concrete 1:3:6 using 12-20mm HBG metal for foundation including cost of all materials, labour, lead, lift, etc., complete in all respects. | 12.7 | cum | 5,000 ₹63,500 Lowest | 5,200 ₹66,040 |
| 5.00 | RCC M20 with nominal mix using 12 to 20mm HBG metal including cost of all materials without form work labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. (For Column Raft - without Form work ) | 16.5 | cum | 6,500 ₹1,07,250 Lowest | 7,000 ₹1,15,500 |
| 6.00 | RCC M20 mix using 12 to 20mm HBG metal for column including cost of all materials with form work, labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. (For Column- with Form work ) | 7.3 | cum | 12,500 ₹91,250 Lowest | 13,000 ₹94,900 |
| 7.00 | Refilling with excavated earth including all labour, lead, lift etc., complete. | 80 | cum | 44 ₹3,520 | 30 ₹2,400 Lowest |
| 8.00 | RCC M20 using 12 to 20mm HBG metal for works including cost of all materials with form work, shuttering, centering, mixture, machine vibrating, curing, lead and lift, etc., complete but excluding cost of reinforcement. (For Grade Beam) | 9.68 | cum | 10,000 ₹96,800 Lowest | 11,000 ₹1,06,480 |
| 9.00 | Brick work in CM 1:5 using good quality 2nd class chamber burnt country bricks for compound wall between RCC pillars including cost of all materials, curing,lead, lift, etc., complete. | 49 | cum | 10,000 ₹4,90,000 | 9,000 ₹4,41,000 Lowest |
| 10.00 | Plastering with CM 1:4, 12mm thick for Ceiling and RCC works including cost of all materials, curing, labour, lead, lift, scaffolding, etc., complete. | 588 | sqm | 320 ₹1,88,160 Lowest | 350 ₹2,05,800 |
Tender Value
Refer Docs
EMD Value
₹15,050
Closing Date
14 Jul 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-II/CNI
Superintending Engineer,GCC II,230 KV CMRL GIS SS,Alandur,chennai-16
As per NIT
2025_EB_572191_1
OT-23/2025-26 of GCC-II
Open Tender
Civil Works
Works
120 days
Ambatur
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹15,050
Yes
9 Oct 2025
21 Jun 2025
15 Jul 2025
21 Jun 2025
14 Jul 2025
23 Jun 2025
Amount
Clearing Heavy Jungle
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete.
Supply and Filling in foundation and basement with M.sand including cost of all materials, labour, consolidation, lead, lift, etc., complete as per the direction of Engineer.
Plain cement concrete 1:3:6 using 12-20mm HBG metal for foundation including cost of all materials, labour, lead, lift, etc., complete in all respects.
RCC M20 with nominal mix using 12 to 20mm HBG metal including cost of all materials without form work labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. (For Column Raft - without Form work )
RCC M20 mix using 12 to 20mm HBG metal for column including cost of all materials with form work, labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. (For Column- with Form work )
Refilling with excavated earth including all labour, lead, lift etc., complete.
RCC M20 using 12 to 20mm HBG metal for works including cost of all materials with form work, shuttering, centering, mixture, machine vibrating, curing, lead and lift, etc., complete but excluding cost of reinforcement. (For Grade Beam)
Brick work in CM 1:5 using good quality 2nd class chamber burnt country bricks for compound wall between RCC pillars including cost of all materials, curing,lead, lift, etc., complete.
Plastering with CM 1:4, 12mm thick for Ceiling and RCC works including cost of all materials, curing, labour, lead, lift, scaffolding, etc., complete.
Providing and placing in position of steel reinforcement for all RCC works for office building and septic tank with labour charges for cutting, bending, tying and binding, placing, etc., including cost of binding wire, steel, etc., complete in all respects.
Supplying and fixing 'Y' angle for Fencing of 75x75x6mm MS angle, etc., Complete as directed by the Engineer as per standard specifcation
Supplying and labour charges for winding, tensioning and binding with binding wire of GI barbed wire of 6 rows of horizontally in layers at equal distance as instructed by the engineer at site for fencing including cost of hot dip galvanised barbed wire including all labour, lead, lift etc. complete. (For 6 rows)
Labour charges for dismantling of existing damaged brick work and removing from the site including cost of all labour, lead, lift etc., complete
Labour charges for dismantling of RCC item including cost of all labour, lead, lift etc., complete
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
H.Venkateswaran (BID ID -1394155)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .