Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.1 LAdmitted-Finance | -45.21% | ₹14.1 L | L1 | Admitted-Finance |
| 2 | L2₹15.3 L+₹1.2 L (8.60%)Admitted-Finance | -40.50% | ₹15.3 L+₹1.2 L (8.60%) | L2 | Admitted-Finance |
| 3 | L3₹15.4 L+₹1.3 L (9.51%)Admitted-Finance | -40.00% | ₹15.4 L+₹1.3 L (9.51%) | L3 | Admitted-Finance |
| 4 | L4₹16.0 L+₹2.0 L (13.9%)Admitted-Finance | -37.61% | ₹16.0 L+₹2.0 L (13.9%) | L4 | Admitted-Finance |
| 5 | L5₹16.5 L+₹2.4 L (17.0%)Admitted-Finance | -35.88% | ₹16.5 L+₹2.4 L (17.0%) | L5 | Admitted-Finance |
Tender Value
₹25.7 L
EMD Value
₹51,388
Closing Date
10 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
EMD 5 GEETA COLONY DELHI
M/o Various schemes under NA.II (EZ)Sub-Head- Repair of boundary wall at various locations in New Kondli Resettlement Colony and Gharoli, Delhi.
2026_DDA_920317_1
24/EE/EMD-5/DDA/2026-27
Open Tender
Civil Works
Percentage
120 days
EMD 5 GEETA COLONY DELHI
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹51,388
29 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
(a) All kinds of soil | 186.57 | sqm | 129.85 | ₹24,226.11 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a)1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 15.55 | cum | 6,518.6 | ₹1,01,364.23 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
(a)Cement mortar 1:4 (1 cement : 4 coarse sand) | 171.64 | cum | 7,370.65 | ₹12,65,098.37 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
(a) Cement mortar 1:4 (1 cement : 4 coarse sand) | 28.7 | cum | 9,344.35 | ₹2,68,182.85 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a)1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.15 | cum | 7,878.5 | ₹56,331.28 |
| 6 | 12 mm cement plaster of mix :
(a)1:4 ( (1 cement: 4 coarse sand) | 1,742.16 | sqm | 357.35 | ₹6,22,560.88 |
| 7 | Finishing walls with water proofing cement paint of required shade :
(a) New work (Two or more coats applied @ 3.84 kg/10 sqm) | 1,742.16 | sqm | 116.9 | ₹2,03,658.5 |
| 8 | Hiring, providing and running charges Excavator (3D) with driver and fuel etc all complete as per Engineer - in- charge. | 2 | per day | 11,167.7 | ₹22,335.4 |
| 9 | Amount after GST Reduction factor@ .973 (Rs.) | - | Nos | 1 | - |
| 10 | Add 3% cost index on DSR-2023 Items (Rs.) | - | Nos | 74,836.08 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
tender24.pdf
Tender Documents • 2.93 MB
BOQ_967125.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .