Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.4 LAccepted-AOC UTTAR PRADESH UP | ₹65.4 L Quoted ₹82.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹87.2 L+₹5.1 L (6.21%)Rejected-Finance GOHANNA AKBARPUR AMBEDKAR NAGAR | ₹87.2 L+₹5.1 L (6.21%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.2 Cr
EMD Value
₹7.8 L
Closing Date
28 Mar 2026, 12:00 pmClosed
SE Ayo-Amb Circle Ayodhya
Office of SE Ayo-Amb Circle Ayodhya
Construction of a 3x3.00 meter span RCC culvert and approach road in place of the narrow culvert located at Km-21 of the Enwan-Bhadsari Kedarnagar Sadarpur road.
2026_CEUFZ_1128733_4
771/1COM-AYO-AMB CIRCLE/26 DT 18-03-2026
Open Tender
Civil Works - Bridges
Fixed-rate
360 days
Ambedkarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹7.8 L
Yes
Office of SE Ayo-Amb Circle Ayodhya
16 Sept 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in embankment Mechanically compacted 95% proctor density. filling in ordinary soil excavation to be in the from of regular pits not exceeding 0.5 metre in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to required lavels and slops and also including 1.50 lift and 30 M lead. The earth from cutting to be used in making embankment or to be doposited as spoil banks within 30 m distance as directed by E/I. (Excluding roylty). by 5 Km. cartage | |||||
| 2Construction of granular sub-base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401 | |||||
| 3Supply and Fixing of Hume pipe | |||||
| 4Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge with in a distance of 60mt (200feet) as per SOR Ch-17 PWD Sch-692 | |||||
| 5Dismantling of RCC Slab | |||||
| 6Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | |||||
| 7Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC M-15 | |||||
| 8Plain/Reinforced Cement Concrete in Super Structure complete as per Drawing and Technical Specifications of Grade - RCC GRADE M 30 | |||||
| 9Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification | |||||
| 10Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.82 MB
BOQ_2105198.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .