| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹245.3 CrAdmitted-Finance NCC HOUSE MADHAPUR HYDERABAD 500 081 | HYDERABAD | HYDERABAD | TELANGANA | 500081 | L1 | Admitted-Finance | |
| 2 | L2₹247.3 Cr+₹2.1 Cr (0.84%)Admitted-Finance 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical does not satisfy all eligibility criteria |
| Sl No | Description | Qty | Unit | Harsh Constructions Pvt Ltd L2 | NCC LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Transportation of material obtained from excavation including loading, unloading and conveying and disposing as directed. For 5.00 Kms. | 13,459.16 | Cum | 385 ₹51,81,776.6 | 381 ₹51,27,939.96 Lowest |
| 2.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 2,260.3 | CUM | 285 ₹6,44,185.5 | 282 ₹6,37,404.6 Lowest |
| 3.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto1.50m) By Mechanical Means | 3,390.44 | CUM | 385 ₹13,05,319.4 | 381 ₹12,91,757.64 Lowest |
| 4.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto1.50m) By Mechanical Means | 3,390.44 | CUM | 385 ₹13,05,319.4 | 381 ₹12,91,757.64 Lowest |
| 5.00 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means | 1,130.15 | CUM | 1,431 ₹16,17,244.65 | 1,416 ₹16,00,292.4 Lowest |
| 6.00 | Supplying BRICK BATS AT site, including conveying and stacking complete | 500 | CUM | 1,271 ₹6,35,500 | 1,258 ₹6,29,000 Lowest |
| 7.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. | 9,486.96 | CUM | 154 ₹14,60,991.84 | 152 ₹14,42,017.92 Lowest |
| 8.00 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. | 10,650 | CUM | 185 ₹19,70,250 | 183 ₹19,48,950 Lowest |
| 9.00 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 11,879.42 | CUM | 1,386 ₹1,64,64,876.12 | 1,372 ₹1,62,98,564.24 Lowest |
| 10.00 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 6,507.62 | CUM | 1,694 ₹1,10,23,908.28 | 1,677 ₹1,09,13,278.74 Lowest |
Tender Value
₹197.1 Cr
EMD Value
₹98.5 L
Closing Date
7 May 2024, 6:00 pmClosed
Chief Engineer,
Chief Engineer,(MSIDC) 4th floor, Bandhkam Bhavan, 25 Murzban Road, Fort, Mumbai
Construction of Dr. Panjabrao Deshmukh International Exhibition and Convention Center at Dhaba Plot No. 175/1, Nagpur.
2024_MSIDC_1029405_1
EE/PD/TC/Notice No-3_B-2
Open Tender
Civil Works
Item Rate
730 days
Nagpur
Please refer Tender documents
3 documents required · 3 mandatory
₹5,900
₹98.5 L
Yes
Chief Engineer Mumbai
11 Jul 2024
7 Mar 2024
10 May 2024
7 Mar 2024
7 May 2024
7 Mar 2024
18 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transportation of material obtained from excavation including loading, unloading and conveying and disposing as directed. For 5.00 Kms. | 13,459.16 | Cum | 252.22 | ₹33,94,669.34 |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 2,260.3 | CUM | 207 | ₹4,67,882.1 |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto1.50m) By Mechanical Means | 3,390.44 | CUM | 227 | ₹7,69,629.88 |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto1.50m) By Mechanical Means | 3,390.44 | CUM | 284 | ₹9,62,884.96 |
| 5 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means | 1,130.15 | CUM | 1,307 | ₹14,77,106.05 |
| 6 | Supplying BRICK BATS AT site, including conveying and stacking complete | 500 | CUM | 435 | ₹2,17,500 |
| 7 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. | 9,486.96 | CUM | 107 | ₹10,15,104.72 |
| 8 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. | 10,650 | CUM | 120 | ₹12,78,000 |
| 9 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 11,879.42 | CUM | 899.2 | ₹1,06,81,974.46 |
| 10 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 6,507.62 | CUM | 1,754.2 | ₹1,14,15,667 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
DTP.pdf
Tender Documents • 3.65 MB
BOQ_1799771.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .