| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC VILL BALIPOTA P O NARAJOLE P S DASPUR DIST PASCHIM MEDINIPUR PIN 721211 WEST BENGAL | NARAJOLE | PASCHIM MEDINIPUR | WEST BENGAL | 721211 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.1 L+₹5,861 (5.58%)Rejected-Finance 9 9 SITALATALA 2ND LANE NONA CHANDANPUR BARRACKPORE PIN 700122 | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700122 | L2 | Rejected-Finance Rejected as L2 | |
| 3 | L3₹1.1 L+₹8,132 (7.74%)Rejected-Finance 2 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | L3 | Rejected-Finance Rejected as L3 |
Tender Value
₹1.1 L
EMD Value
₹2,106
Closing Date
11 Aug 2025, 12:00 pmClosed
AE,SKHESD I
O/o The Assistant Engineer South Kolkata Health Electrical Sub Division-I, P.W.Dte. K.S.Ray T.B. Hospital, Jadavpur, Kolkata - 700 032
Supply and installation of 2 TR AC machine in the DPMU section at the Office of the CMOH, S24 Pgs., 2nd Floor, Admin Building MR Bangur Hospital, Kolkata.
2025_WBPWD_883933_1
WBPWD/AE/SKHESD-I/NIQ-15/25-26
Open Tender
A/C ORG
Item Rate
7 days
MR Bangur Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,106
16 Oct 2025
28 Jul 2025
13 Aug 2025
28 Jul 2025
11 Aug 2025
1 Aug 2025
Amount
Dismantling charge for existing split/window type air conditioner and handing it over to the store house /section office as per instruction of EIC
S&D of High Wall Split Air Conditioner with R410A/R407C/R-32 Refrigerant,with Rotary Compressor with minimum Cooling Capacity of (6.6KW-7.00KW), Air flow rate (630-875)CFM,Minimum cu. Pipe lenth from ODU to IDU not less than 15 MTR & suitable for operation on 230V,+- 5%, 50Hz, 1Ph AC supply with precharged refrigerant, Wireless remote & all other accessories complete with refrigerant. (Make- Ogeneral/ Mitsubishi Electric/ Mitsubishi Heavy)
Installation, testing and commissioning of High wall Split type AC Machine with all accessories i.e. fastner, nut bolt, wall cutting, all glass window/grill cutting where needed with S&F heavy guage ODU iron bracket incl. mending good damages.in place of old split AC Machine as per direction of EIC
Supply and Fixing of Copper Refrigeration pipe line for both Liquid line and Suction Line suitable for the above split unit with hard /soft drawn copper piping and with proper supports & brackets( per direction of E.I.C.) incl. 9 mm thick nitrile rubber insulation with proper tapping and mending good damages to original finish.
Suction Line : 5/8" Dia
Liquid Line : 1/4" Dia
Supply & drawing 3 core 2.5 sq. mm. P.V.C. insulated wire for connecting the Power hub to Outdoor unit supply. (Make Finolex/RR Kabel /Gloster) .
Supply & drawing 4 core 1.5 sq. mm. P.V.C. insulated wire for connecting the outdoor to indoor supply. (Make Finolex/RR Kabel /Gloster) .
Supply & laying of 3/4 '' PVC flexible drain pipe with necessary accessories as required.
S&F of 25 mm heavy type (40 Grade) UPVC pipe with necessary elbows,connector,solvent cement & clamps. (Make: Supreme)
Supplying, fabrication incl painting & fixing of frame for keeping the outdoor of AC machines with M.S angle of 6 mm thick of size (50 mm x 50 mm ) for making Base Frame/platform for installation of outdoor unit of above mentioned AC machines incl. drilling 2 no's holes in each channel , cutting holes into the wall & grouting the same with cement concrete (1:1 ½ :3) etc. fabricated with . horizontal flats of 25 mm x 5 mm and supporting angle of 50mm x50mm x 6mm in each platform in the outer edge for transmitting the load centrally through 3 no's (50 mm x50mm x6 mm) angle inserted into the existing wall incl. construction of railing with 50 mm x 50 mm x 6 mm (4 Columns) ,25 mmx25mmx6mm (top handle bar) and 25 x5 mm ( 3 runs in the inter mediate portion ) flats as per Direction of E.I.C. The entire structure must be safe to carry out maintenance of ODU . Area of the platform is 2.0 Mtr. x 1.5 Mtr., as per Direction of E.I.C
Charges for cutting the grill of the window and making a hinged door with proper locking arrangement as per Direction of EIC. The size of the cutout should be sufficient for a technician to pass on the platform .
Hiring charges for scaffolding arrangement including dismantling at the end of work and carriage, for ODU and Structure installation, per storey of building per vertical run
Terms and condition
The Agency must procure the materials from the Manufacturere/ OEM or from their authorised sales channel so that the standard warranty/ support of the Manufacturer/ OEM becomes applicable to the products to be delivered and installed by them.
Make & Model no of each and every materials to be approved by EIC.
Defect liability period 1(one) year.
GUHA ENTERPRISE (BID ID -6827411)
MAHESWAR ELECTRICAL INDUSTRIES (BID ID -6827763)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .