Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Rank | Status |
|---|---|---|---|
| 1 | LAccepted-AOC HANUMAN BAJARIA MORENA MADHYA PRADESH | MORENA | MADHYA PRADESH | 476001 | L | Accepted-AOC LOI Accepted |
| 2 | LAccepted-AOC 105 APR COLONY KATANGA JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L | Accepted-AOC LOI Accepted |
| 3 | LAccepted-AOC | L | Accepted-AOC LOI Accepted |
| 4 | LAccepted-AOC | L | Accepted-AOC LOI Accepted |
| 5 | LAccepted-AOC | L | Accepted-AOC LOI Accepted |
| Sl No | Description | Qty | Unit | NUtec Enterprises L19 | Geeta Electricals Indore Pvt Ltd L43 | D. S. Electricals L26 | NIRMAN UDYOG L1 | Digamber Electricals L23 | SHRI ANANT TRANSFORMERS AND ENGINEERS L42 | Pragya Enterprises L17 | PRADEEP TIWARI CHHATARPUR MP L1 | JEEVAN JYOTI TRANSFORMERS L11 | M/s Ujala Stone Crusher L22 | OM SAI ENTERPRISES L1 | K. P. S. ENTERPRISES L36 | SIGNAL and TELECOM CONST INDIA L35 | ADITI ELECTRICALS L25 | KRISHNA POWER L1 | M/S BANSALA ENGINEERS POWERTECH LLP L28 | Voltech Engineering L30 | Transtech Engineer L31 | FALGUNYA ENGINEERING SERVICES L1 | SHREE KAALIKA POWER & TECHNOCRATS (OPC) PRIVATE LIMITED L1 | M.V. Plast Pvt Ltd L1 | R V POWER L1 | TARA TRANSFORMER L1 | PRISM CORPORATION L1 | Z M ENTERPRISES L1 | JABALPUR ENERGY L1 | Kiran Industries L15 | TUSHAR TRANSFORMER L8 | UNIVERSAL POWER TECH L1 | ARIHANT TRANSFORMERS L41 | Kamla Transformers (P) Ltd. L6 | Aaradhya Enterprises L34 | P S L Industries L1 | MATESHWARI TRANSFORMER L1 | PIONEER ENGINEERS L1 | Raj Transformer And Electrical Equipment L37 | PARAS ELECTRICALS L16 | MISHRA GROUP L24 | BHUWAN JYOTI TRANSFORMERS L14 | NEW POWER SUPPLY L7 | Shri Krishna Enterprises L1 | LIGHT AND COMPANY L27 | MALWA UDYOG L33 | MISHRA WIRE L20 | SHRI RADHEY ENTERPRISES L1 | KUMAR ELECTRICALS L1 | Sharad Electricals L21 | UDGAM INDUSTRIES L1 | S.K. ELECTRICALS L1 | YASH INDUSTRIES L1 | M/S Raj kumar sharma L1 | FUSION INDUSTRIES L1 | Keshav Transformers L12 | Goodwill Electricals L9 | jai ambey electricals L1 | ARVIND ELECTRICALS L1 | KUMAR ELECTRICAL INDUSTRIES L18 | SHRI LAXMI INDUSTRIES L29 | AGARWAL INFRASTRUCTURE L1 | M/s STAR TRANSMISSION L4 | PRIYA ENTERPRISES L1 | RMK ELECTRICALS L1 | SHIV ENGINEERING L5 | RADHA DAMODAR CONSTRUCTION L1 | SHUBHAM CONSTRUCTION L1 | Shubh Laxmi Transmission Pvt Ltd L1 | B.K.Rewinding Works L38 | MS SHIV SHAKTI ENGINEERING L1 | Akshay Industries L1 | TRINITY TRANSFORMER L1 | M/s NEELAM TRANSFORMER L40 | ARPIT PARASHAR AND ASSOCIATES L1 | VIJAY INDUSTRIES L1 | mamta enterprises L1 | SHIVOHAM CONSTRUCTION L32 | MAMSAI ELECTRICALS PRIVATE LIMITED L2 | Dayalok Transformers Private Limited L3 | R. K. ELECTRICAL L1 | ASHISH ENGINEERING WORKS L1 | G. O. Electrical Industries L39 | M/s VI-MAN TRANSFORMERS L10 | SURYA ENGINEERS L1 | NANDINI ELECTRICALS L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 25 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 28,721.2 ₹28,721.2 | 29,877.6 ₹29,877.6 | 28,616.18 ₹28,616.18 | - | 28,461.6 ₹28,461.6 | 28,927.7 ₹28,927.7 | 28,615 ₹28,615 | - | 27,994.35 ₹27,994.35 | 28,609.1 ₹28,609.1 | - | 28,697.6 ₹28,697.6 | 28,631.52 ₹28,631.52 | 28,495.82 ₹28,495.82 | - | 28,497 ₹28,497 | 28,722.38 ₹28,722.38 | 28,721.2 ₹28,721.2 | - | - | - | - | - | - | - | - | 28,638.6 ₹28,638.6 | 28,337.7 ₹28,337.7 | - | 28,728.28 ₹28,728.28 | 27,158.88 ₹27,158.88 | 28,166.6 ₹28,166.6 | - | - | - | 29,205 ₹29,205 | 28,709.4 ₹28,709.4 | 28,611.46 ₹28,611.46 | 28,164.21 ₹28,164.21 | 28,202 ₹28,202 | - | 28,827.4 ₹28,827.4 | 28,704.68 ₹28,704.68 | 28,567.2 ₹28,567.2 | - | - | 28,597.3 ₹28,597.3 | - | - | - | - | - | 28,202 ₹28,202 | 28,491.1 ₹28,491.1 | - | - | 30,675.28 ₹30,675.28 | 28,605.56 ₹28,605.56 | - | 28,166.6 ₹28,166.6 | - | - | 27,154.16 ₹27,154.16 Lowest | - | - | - | 28,734.18 ₹28,734.18 | - | - | - | 28,567.8 ₹28,567.8 | - | - | - | 28,391.98 ₹28,391.98 | 27,582.5 ₹27,582.5 | 27,338.24 ₹27,338.24 | - | - | 29,057.5 ₹29,057.5 | 28,337.7 ₹28,337.7 | - | 28,461.6 ₹28,461.6 |
| 2.00 | 25 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 32,214 ₹32,214 | 34,007.6 ₹34,007.6 | 32,118.42 ₹32,118.42 | - | 32,412.24 ₹32,412.24 | 32,833.5 ₹32,833.5 | 32,178.6 ₹32,178.6 | - | 31,883.89 ₹31,883.89 | 32,573.9 ₹32,573.9 | - | 32,591.6 ₹32,591.6 | 32,525.52 ₹32,525.52 | 32,566.82 ₹32,566.82 | - | 32,391 ₹32,391 | 32,639.98 ₹32,639.98 | 32,638.8 ₹32,638.8 | - | - | - | - | - | - | - | - | 32,391 ₹32,391 | 32,497.2 ₹32,497.2 | - | 32,650.6 ₹32,650.6 | 30,773.22 ₹30,773.22 Lowest | 32,075.94 ₹32,075.94 | - | - | - | 32,863 ₹32,863 | 32,538.5 ₹32,538.5 | 32,576.26 ₹32,576.26 | 32,012.59 ₹32,012.59 | 32,349.7 ₹32,349.7 | - | 32,804 ₹32,804 | 32,625.82 ₹32,625.82 | 32,601.04 ₹32,601.04 | - | - | 31,906.02 ₹31,906.02 | - | - | - | - | - | 32,214 ₹32,214 | 32,367.4 ₹32,367.4 | - | - | 33,655.96 ₹33,655.96 | 32,381.56 ₹32,381.56 | - | 32,155 ₹32,155 | - | - | 30,777.94 ₹30,777.94 | - | - | - | 32,655.32 ₹32,655.32 | - | - | - | 32,426.4 ₹32,426.4 | - | - | - | 32,041.72 ₹32,041.72 | 31,334.9 ₹31,334.9 | 30,927.8 ₹30,927.8 | - | - | 32,302.5 ₹32,302.5 | 32,478.32 ₹32,478.32 | - | 32,585.7 ₹32,585.7 |
| 3.00 | 63 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 36,155.2 ₹36,155.2 | 38,007.8 ₹38,007.8 | 36,156.38 ₹36,156.38 | - | 36,259.04 ₹36,259.04 | 36,875 ₹36,875 | 36,108 ₹36,108 | - | 36,025.21 ₹36,025.21 | 36,467.9 ₹36,467.9 | - | 36,485.6 ₹36,485.6 | 36,449.02 ₹36,449.02 | 36,165.82 ₹36,165.82 | - | 36,403 ₹36,403 | 36,490.32 ₹36,490.32 | 36,491.5 ₹36,491.5 | - | - | - | - | - | - | - | - | 36,050.18 ₹36,050.18 | 36,361.7 ₹36,361.7 | - | 36,497.4 ₹36,497.4 | 35,488.5 ₹35,488.5 | 36,721.6 ₹36,721.6 | - | - | - | 37,052 ₹37,052 | 36,414.8 ₹36,414.8 | 36,470.26 ₹36,470.26 | 36,239.85 ₹36,239.85 | 36,084.4 ₹36,084.4 | - | 36,355.8 ₹36,355.8 | 36,498.58 ₹36,498.58 | 36,551.68 ₹36,551.68 | - | - | 36,102.1 ₹36,102.1 | - | - | - | - | - | 35,942.8 ₹35,942.8 | 36,231.9 ₹36,231.9 | - | - | 40,312.34 ₹40,312.34 | 35,921.56 ₹35,921.56 | - | 35,754 ₹35,754 | - | - | 35,493.22 ₹35,493.22 | - | - | - | 36,498.58 ₹36,498.58 | - | - | - | 36,440.76 ₹36,440.76 | - | - | - | 36,419.52 ₹36,419.52 | 35,282 ₹35,282 | 34,928 ₹34,928 Lowest | - | - | 37,583 ₹37,583 | 36,321.58 ₹36,321.58 | - | 36,450.2 ₹36,450.2 |
| 4.00 | 63 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 34,780.5 ₹34,780.5 | 43,341.4 ₹43,341.4 | 35,496.76 ₹35,496.76 | - | 35,586.44 ₹35,586.44 | 41,878.2 ₹41,878.2 | 34,751 ₹34,751 | - | 36,598.45 ₹36,598.45 | 36,001.8 ₹36,001.8 | - | 35,069.6 ₹35,069.6 | 34,974.02 ₹34,974.02 | 35,811.82 ₹35,811.82 | - | 34,869 ₹34,869 | 36,486.78 ₹36,486.78 | 36,486.78 ₹36,486.78 | - | - | - | - | - | - | - | - | 35,400 ₹35,400 | 38,296.9 ₹38,296.9 | - | 40,769 ₹40,769 | 39,866.3 ₹39,866.3 | 35,612.4 ₹35,612.4 | - | - | - | 40,120 ₹40,120 | 35,106.18 ₹35,106.18 | 35,998.26 ₹35,998.26 | 36,771.82 ₹36,771.82 | 38,055 ₹38,055 | - | 35,636 ₹35,636 | 37,642 ₹37,642 | 35,742.2 ₹35,742.2 | - | - | 35,512.1 ₹35,512.1 | - | - | - | - | - | 41,134.8 ₹41,134.8 | 38,928.2 ₹38,928.2 | - | - | 43,811.04 ₹43,811.04 | 36,486.78 ₹36,486.78 | - | 36,698 ₹36,698 | - | - | 39,860.4 ₹39,860.4 | - | - | - | 41,636.3 ₹41,636.3 | - | - | - | 40,822.1 ₹40,822.1 | - | - | - | 35,728.04 ₹35,728.04 | 31,535.5 ₹31,535.5 Lowest | 38,715.8 ₹38,715.8 | - | - | 38,645 ₹38,645 | 38,704 ₹38,704 | - | 38,940 ₹38,940 |
| 5.00 | 100 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 46,315 ₹46,315 | 48,238.4 ₹48,238.4 | 46,692.6 ₹46,692.6 | - | 46,135.64 ₹46,135.64 | 46,810.6 ₹46,810.6 | 46,256 ₹46,256 | - | 45,723.48 ₹45,723.48 | 46,267.8 ₹46,267.8 | - | 46,279.6 ₹46,279.6 | 46,243.02 ₹46,243.02 | 46,361.02 ₹46,361.02 | - | 46,079 ₹46,079 | 46,331.52 ₹46,331.52 | 46,338.6 ₹46,338.6 | - | - | - | - | - | - | - | - | 45,923.24 ₹45,923.24 | 46,267.8 ₹46,267.8 | - | 46,338.6 ₹46,338.6 | 43,636.4 ₹43,636.4 | 46,824.76 ₹46,824.76 | - | - | - | 46,551 ₹46,551 | 46,433 ₹46,433 | 46,284.32 ₹46,284.32 | 45,893.26 ₹45,893.26 | 45,925.6 ₹45,925.6 | - | 46,315 ₹46,315 | 46,351.58 ₹46,351.58 | 46,123.24 ₹46,123.24 | - | - | 46,710.3 ₹46,710.3 | - | - | - | - | - | 45,500.8 ₹45,500.8 | 45,931.5 ₹45,931.5 | - | - | 44,958 ₹44,958 | 46,162.78 ₹46,162.78 | - | 45,300.2 ₹45,300.2 | - | - | 43,630.5 ₹43,630.5 | - | - | - | 46,351.58 ₹46,351.58 | - | - | - | 45,241.2 ₹45,241.2 | - | - | - | 46,756.32 ₹46,756.32 | 43,996.3 ₹43,996.3 | 42,633.4 ₹42,633.4 Lowest | - | - | 46,315 ₹46,315 | 46,174.58 ₹46,174.58 | - | 46,332.7 ₹46,332.7 |
| 6.00 | 100 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 49,483.3 ₹49,483.3 | 51,766.6 ₹51,766.6 | 48,951.12 ₹48,951.12 | - | 49,648.5 ₹49,648.5 | 50,209 ₹50,209 | 49,442 ₹49,442 | - | 49,025.23 ₹49,025.23 | 49,681.54 ₹49,681.54 | - | 49,701.6 ₹49,701.6 | 49,547.02 ₹49,547.02 | 49,912.82 ₹49,912.82 | - | 49,383 ₹49,383 | 49,725.2 ₹49,725.2 | 49,731.1 ₹49,731.1 | - | - | - | - | - | - | - | - | 49,385.36 ₹49,385.36 | 49,624.9 ₹49,624.9 | - | 49,737 ₹49,737 | 48,315.1 ₹48,315.1 | 49,023.1 ₹49,023.1 | - | - | - | 50,504 ₹50,504 | 49,324 ₹49,324 | 49,687.44 ₹49,687.44 | 49,165.88 ₹49,165.88 | 49,217.8 ₹49,217.8 | - | 49,796 ₹49,796 | 49,442 ₹49,442 | 49,781.24 ₹49,781.24 | - | - | 48,875.6 ₹48,875.6 | - | - | - | - | - | 48,214.8 ₹48,214.8 | 49,412.5 ₹49,412.5 | - | - | 50,258.56 ₹50,258.56 | 49,584.78 ₹49,584.78 | - | 48,940.5 ₹48,940.5 | - | - | 48,321 ₹48,321 | - | - | - | 49,746.44 ₹49,746.44 | - | - | - | 48,934.6 ₹48,934.6 | - | - | - | 48,993.6 ₹48,993.6 | 47,477.3 ₹47,477.3 Lowest | 48,663.2 ₹48,663.2 | - | - | 49,560 ₹49,560 | 49,569.44 ₹49,569.44 | - | 49,731.1 ₹49,731.1 |
| 7.00 | 200 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 71,626 ₹71,626 | 74,222 ₹74,222 | 70,720.94 ₹70,720.94 | - | 71,159.9 ₹71,159.9 | 72,558.2 ₹72,558.2 | 71,567 ₹71,567 | - | 70,325.73 ₹70,325.73 | 71,367.58 ₹71,367.58 | - | 71,531.6 ₹71,531.6 | 71,436.02 ₹71,436.02 | 71,388.82 ₹71,388.82 | - | 71,331 ₹71,331 | 71,590.6 ₹71,590.6 | 71,590.6 ₹71,590.6 | - | - | - | - | - | - | - | - | 71,333.36 ₹71,333.36 | 69,030 ₹69,030 | - | 71,272 ₹71,272 | 67,537.3 ₹67,537.3 | 71,588.24 ₹71,588.24 | - | - | - | 70,593.5 ₹70,593.5 | 71,036 ₹71,036 | 71,372.3 ₹71,372.3 | 70,504.49 ₹70,504.49 | 68,569.8 ₹68,569.8 | - | 71,552.84 ₹71,552.84 | 71,390 ₹71,390 | 71,386.46 ₹71,386.46 | - | - | 70,705.6 ₹70,705.6 | - | - | - | - | - | 68,038.8 ₹68,038.8 | 69,018.2 ₹69,018.2 | - | - | 64,121.2 ₹64,121.2 Lowest | 71,532.78 ₹71,532.78 | - | 68,652.4 ₹68,652.4 | - | - | 67,532.58 ₹67,532.58 | - | - | - | 71,611.84 ₹71,611.84 | - | - | - | 70,018.84 ₹70,018.84 | - | - | - | 71,484.4 ₹71,484.4 | 68,280.7 ₹68,280.7 | 67,531.4 ₹67,531.4 | - | - | 71,567 ₹71,567 | 69,325 ₹69,325 | - | 69,354.5 ₹69,354.5 |
| 8.00 | 200 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 78,658.8 ₹78,658.8 | 81,915.6 ₹81,915.6 | 77,797.4 ₹77,797.4 | - | 78,746.12 ₹78,746.12 | 80,051.2 ₹80,051.2 | 78,706 ₹78,706 | - | 76,225.74 ₹76,225.74 | 78,959.7 ₹78,959.7 | - | 78,965.6 ₹78,965.6 | 78,929.02 ₹78,929.02 | 79,176.82 ₹79,176.82 | - | 78,883 ₹78,883 | 79,078.88 ₹79,078.88 | 79,077.7 ₹79,077.7 | - | - | - | - | - | - | - | - | 78,086.5 ₹78,086.5 | 70,151 ₹70,151 | - | 79,060 ₹79,060 | 74,762.44 ₹74,762.44 | 77,221.56 ₹77,221.56 | - | - | - | 74,074.5 ₹74,074.5 | 76,523 ₹76,523 | 78,950.26 ₹78,950.26 | 76,400.35 ₹76,400.35 | 69,950.4 ₹69,950.4 | - | 78,588 ₹78,588 | 78,918.4 ₹78,918.4 | 78,865.3 ₹78,865.3 | - | - | 77,036.3 ₹77,036.3 | - | - | - | - | - | 75,413.8 ₹75,413.8 | 70,092 ₹70,092 | - | - | 70,077.84 ₹70,077.84 | 79,061.18 ₹79,061.18 | - | 70,210 ₹70,210 | - | - | 74,764.8 ₹74,764.8 | - | - | - | 79,095.4 ₹79,095.4 | - | - | - | 77,207.4 ₹77,207.4 | - | - | - | 77,136.6 ₹77,136.6 | 69,266 ₹69,266 Lowest | 73,313.4 ₹73,313.4 | - | - | 78,057 ₹78,057 | 71,071.4 ₹71,071.4 | - | 70,493.2 ₹70,493.2 |
| 9.00 | 25KVA - In case X-mer is found to be uneconomical at firm’s works for the reason specified in tender document lump-sum rate for handling labour and to & fro transportation of un-repaired unit to concerned A/s. | 1 | Per DTR | 1,445.5 ₹1,445.5 | 1,150.5 ₹1,150.5 | 2,356.46 ₹2,356.46 | - | 1,770 ₹1,770 | 1,829 ₹1,829 | 1,416 ₹1,416 | - | 1,257.11 ₹1,257.11 | 1,534 ₹1,534 | - | 2,065 ₹2,065 | 2,094.5 ₹2,094.5 | 1,532.82 ₹1,532.82 | - | 2,065 ₹2,065 | 1,417.18 ₹1,417.18 | 1,411.28 ₹1,411.28 | - | - | - | - | - | - | - | - | 1,386.5 ₹1,386.5 | 1,593 ₹1,593 | - | 1,416 ₹1,416 | 1,416 ₹1,416 | 2,419 ₹2,419 | - | - | - | 1,770 ₹1,770 | 1,770 ₹1,770 | 1,298 ₹1,298 | 1,274.79 ₹1,274.79 | 1,534 ₹1,534 | - | 1,534 ₹1,534 | 1,180 ₹1,180 | 1,416 ₹1,416 | - | - | 2,253.8 ₹2,253.8 | - | - | - | - | - | 1,180 ₹1,180 | 1,622.5 ₹1,622.5 | - | - | 1,413.64 ₹1,413.64 | 1,416 ₹1,416 | - | 1,534 ₹1,534 | - | - | 1,416 ₹1,416 | - | - | - | 914.5 ₹914.5 Lowest | - | - | - | 2,124 ₹2,124 | - | - | - | 2,360 ₹2,360 | 1,416 ₹1,416 | 1,416 ₹1,416 | - | - | 1,770 ₹1,770 | 1,416 ₹1,416 | - | 1,652 ₹1,652 |
| 10.00 | 63 KVA - In case X-mer is found to be uneconomical at firm’s works for the reason specified in tender document lump-sum rate for handling labour and to & fro transportation of un-repaired unit to concerned A/s. | 1 | Per DTR | 1,781.8 ₹1,781.8 | 1,386.5 ₹1,386.5 | 2,891 ₹2,891 | - | 2,006 ₹2,006 | 2,419 ₹2,419 | 1,770 ₹1,770 | - | 1,694.35 ₹1,694.35 | 1,770 ₹1,770 | - | 2,360 ₹2,360 | 2,360 ₹2,360 | 1,886.82 ₹1,886.82 | - | 2,301 ₹2,301 | 1,768.82 ₹1,768.82 | 1,765.28 ₹1,765.28 | - | - | - | - | - | - | - | - | 1,740.5 ₹1,740.5 | 2,065 ₹2,065 | - | 1,770 ₹1,770 | 1,770 ₹1,770 | 3,009 ₹3,009 | - | - | - | 2,242 ₹2,242 | 2,124 ₹2,124 | 1,947 ₹1,947 | 1,718.06 ₹1,718.06 | 2,006 ₹2,006 | - | 1,770 ₹1,770 | 1,770 ₹1,770 | 1,534 ₹1,534 | - | - | 2,808.4 ₹2,808.4 | - | - | - | - | - | 1,416 ₹1,416 | 2,065 ₹2,065 | - | - | 1,768.82 ₹1,768.82 | 2,124 ₹2,124 | - | 2,065 ₹2,065 | - | - | 1,770 ₹1,770 | - | - | - | 1,150.5 ₹1,150.5 Lowest | - | - | - | 2,596 ₹2,596 | - | - | - | 2,950 ₹2,950 | 1,534 ₹1,534 | 1,770 ₹1,770 | - | - | 2,006 ₹2,006 | 1,888 ₹1,888 | - | 2,124 ₹2,124 |
Tender Value
₹105.4 Cr
EMD Value
₹1 L
Closing Date
9 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CGM (S and P) MPPKVVCL Jabalpur
CGM (S and P) MPPKVVCL Jabalpur
Repairing and Testing of BGP Failed 11/0.433 KV Distribution Transformers (25 KVA to 200 KVA Ratings)
2022_PKVVC_205287_2
TS-1251 DTR Repairing
Open Tender
Electrical Works
Item Rate
730 days
CGM (S and P) MPPKVVCL Jabalpur
As per Tender Document
3 documents required · 3 mandatory
₹11,800
Yes
₹1 L
Yes
Jabalpur
2 May 2023
8 Jun 2022
11 Jul 2022
8 Jun 2022
9 Jul 2022
17 Jun 2022
14 Jun 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 25 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 2 | 25 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 3 | 63 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 4 | 63 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 5 | 100 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 6 | 100 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 7 | 200 KVA - Net Repairing cost of Non-Star (only New Design transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 8 | 200 KVA - Net Repairing cost of BEE Level 1 / Level 2 transformers as per complete scope of work detailed in the tender which shall include To & Fro Transportation Charges upto 50 KM, Transformer Oil and GST,crediting cost of scrap material. | 1 | Per DTR | 1 | ₹1 |
| 9 | 25KVA - In case X-mer is found to be uneconomical at firm’s works for the reason specified in tender document lump-sum rate for handling labour and to & fro transportation of un-repaired unit to concerned A/s. | 1 | Per DTR | 1 | ₹1 |
| 10 | 63 KVA - In case X-mer is found to be uneconomical at firm’s works for the reason specified in tender document lump-sum rate for handling labour and to & fro transportation of un-repaired unit to concerned A/s. | 1 | Per DTR | 1 | ₹1 |
stage.html
html • 0.42 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_245679.xls
BOQ Document • 0.26 MB
99567946.pdf
Tender Document • 0.13 MB
TenderDocumentTS1251DTRRepairing.pdf
Tender Document • 1.07 MB
99567948.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .