Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC ARIYALUR | TAMIL NADU | 608901 | ₹18.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹18.3 LRejected-AOC | ₹18.3 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | K.Rajavel L1 | Chinnusamy P L2 |
|---|---|---|---|---|---|
| 1.00Construction of New 30000 Ltrs OHT (12 M Staging Height) at Velampalayam HO Kakaveri Panchayat Rasipuram Block at Namakkal District Under SFC (D.Pts) 2025 26 | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 64.9 | Cum | 260 ₹16,874 | 300 ₹19,470 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 8.11 | Cum | 1,736.95 ₹14,086.66 | 1,736.95 ₹14,086.66 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.78 | Cum | 5,449.57 ₹26,048.94 | 7,500 ₹35,850 |
| 5.00 | Brick work in cement mortar 1:5 mix using Fly bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.25 | Cum | 7,339.27 ₹1,834.82 | 7,339.27 ₹1,834.82 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.54 | Cum | 6,845.38 ₹3,696.51 | 7,200 ₹3,888 |
| 7.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.73 | Cum | 285.04 ₹1,348.24 | 350 ₹1,655.50 |
| 8.00Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | |||||
| 9.00 | Items 1.50 m to 4.50m below GL | 8.62 | Cum | 9,483.87 ₹81,750.96 | 9,483.87 ₹81,750.96 |
| 10.00 | Items 0 m to 1.50m below GL | 1.75 | Cum | 9,345.1 ₹16,353.93 | 9,345.1 ₹16,353.93 |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
26 Dec 2025, 3:00 pmClosed
The Block Development Officer(B.P), Rasipuram
The Block Development Officer(B.P), Rasipuram
Construction of New 30000 Ltrs OHT (12 M Staging Height) at Velampalayam HO Kakaveri Panchayat Rasipuram Block at Namakkal District Under SFC (D.Pt) 2025 26
2025_RDTN_632929_1
2841/2025/A2 Dt.15.12.2025
Open Tender
Civil Works - Water Works
90 days
Kakkaveri
Required Documents as Per Schedule
4 documents required · 4 mandatory
₹0
₹18,500
Yes
21 Jan 2026
16 Dec 2025
26 Dec 2025
16 Dec 2025
26 Dec 2025
16 Dec 2025
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortar 1:5 mix using Fly bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Items 1.50 m to 4.50m below GL
Items 0 m to 1.50m below GL
Items 0.0 to 4.50m Above GL
Items Above 4.51m to 7.32 m
Items Above GL 7.33m to 10.98m
Items 10.98 m to 14.64 m above GL
14.64 m 18.30m above GL
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
For Plan surface
Below GL
From 0.00 -3.30m
From 5.30m to 6.30 m
From 8.30m to 9.30m above G.L
From 11.30 m to 12.30m
Curved Surface
Upto 0-3.30m height
From 5.31-6.30m Height
Square column
Below GL
8.31 to 9.30m ht
10.31 to 11.30m ht
Painting two coats using ready mixed Plastic Emulsion paint inlcuding priming coat including cost and conveyance of all materials to site and all labour charges etc comoplete
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Supplying , Fabricating,Delivery and placing in position MS steel Ladder wide 0.45m made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded and Jointed etc. , Complete complying with stanard specification.
Supplying and Fixing of RCC inner access Ladder in RCC 1:11/2:3mix etc. , Complete complying with stanard specification.
Providing PVC ventilating arrangements mosquito proof nylon net with 110mm PVC cowl and as directed by Departmental Officers
Providing Cut stone slab in CM 1:3 mix and as directed by Departmental Officers
Providing Manhole cover of size 0.60x0.60 m in RCC 1:11/2:3 mix with suitable reinforcement and 50x50x6mm Ms angle fixed along edges and as directed by Departmental Officers
Provision for Pipe connection arrangements
65m dia GI Pipe for inlet connection& outlet
65mm dia GI Pipe for over flow and rain water harvesting pipes
50mm dia GI Pipe for scour pipes
65mm dia GM Gate valve
50mm dia GM Gate valve
50 mm dia Flange set
65mm dia GI Tee
65mm dia GI coupling
65mm dia GI flange set
65mm dia GI Elbow
50 mm dia GI Elbow
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
63mm PVC Pipe 4ksc
Earth Work excvation and depositing on bank with intial lead and lift including all charges )
Laying and Jointing of PVC Pipe into Trench
Refilling the earth work after into trench
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_757232.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_757232.xls
BOQ • 0.26 MB
Techbit.pdf
Additional Documents • 1.69 MB
Download all tender documents and submit your bid