Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹7.0 LAccepted-Finance SCHOOL BAZAR MIDNAPUR | MEDINIPUR EAST | WEST BENGAL | 721130 | 1st | Accepted-Finance 1st lowest bidder | |
| 2 | 2nd₹7.1 L+₹18,748 (2.69%)Rejected-Finance | 2nd | Rejected-Finance 2nd lowest bidder | |
| 3 | 3rd₹7.2 L+₹20,832 (2.99%)Rejected-Finance 35 DHARSA MAHITAL KHAN S BYE LANE JIGACHA MUKHERJEE PARA HOWRAH PIN 711112 | HOWRAH | HOWRAH | WEST BENGAL | 711112 | 3rd | Rejected-Finance 3rd lowest bidder |
Tender Value
Refer Docs
EMD Value
₹13,940
Closing Date
12 Jun 2024, 2:30 pmClosed
SE,SWEC,PWD
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.D) South-Western Electrical Circle PWD Compound, Midnapore, Paschim Medinipur
AMC of Electrical Works at Govt. General Degree College, Mohanpur, Paschim Medinipur- Day to day maintenance of Electrical installations including S and D maintenance material and Annual Comprehensive Maintenance of Split AC machine.
2024_WBPWD_689493_1
WBPWD/SE/SWEC/NIQ13/2024-25
Open Tender
ELECTRICAL WORKS M/R
Item Rate
365 days
MIDNAPORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,940
OFFICE OF THE SE,SWEC,PWD
6 Dec 2024
5 Jun 2024
14 Jun 2024
5 Jun 2024
12 Jun 2024
8 Jun 2024
7 Jun 2024
Amount
Day to day Annual maintenance of Electrical installations of Govt. General Degree College, Mohanpur, Paschim Midnapur. Charges for providing 1 No Electrician, 1 No Helper for 1(One) shiftas per Scope of work, terms & condition given below. every Day(incl. holy day) including emergency breakdown etc. of beyond maintenance hour if required]
ANNUAL COMPREHENSIVE MAINTENANCE OF AC MACHINES.
Annual comprehensive maintenance contract of existing Split ( 2.0 Tr Capacity) A.C. machine at different sites of Govt. General Degree College, Mohanpur, Paschim Midnapur. As per detail terms & conditions furnished below :-
a) 2.0Tr. Split type AC Machine.- 16 Nos( for 12 months, 16x12=192)
Supply of 240V, 9W LED bulb. (Make- havells/Philips/Crompton)
Supply 240V,1200 mm sweep ceiling fan. (Make- CG Aura/ Usha striker / Orient quasser)
Supply of single LED Light Fittings.(Make- Crompton-IGP161LT8-16 1 x T8 or equivalent of Philips/Havells)
Supply of twin LED Light Fittings. (Make-Crompton-Crompton-IGP162LT8-16 2 x T8 or Philips/ Havells)
Supply of 240V, 16 watt single LED tube Light. (Make- Crompton- LTT8-16 or equivalent of Philips/ Havells)
Supply of ding dong Call bell
Supply of 5 Amp 3/5-Pin piano type plug socket( Anchor make)
Supply of 6 Amp piano type switch( Anchor make)
Supply of 15 Amp3/5-Pin piano type plug socket( Anchor make)
Supply of 15 Amp 3-Pin plug switch( Anchor make)
Supply of 16 amp kit kat rewarable fuse ( Anchor make)
Supply of step type electronics fan regulator ( Anchor make)
Supply of angular batten holder. ( Anchor make)
Supply of 1.1 KV grade 1.5 sq.mm 'FR/FRLS' stranded Copper Wire.(Make-Havells/Kei/Gloster)
Supply of 1.1 KV grade 2.5 sq.mm 'FR/FRLS' stranded Copper Wire.(Make-Havells/Kei/Gloster)
Supply of 1.1 KV grade 4.0 sq.mm 'FR/FRLS' stranded Copper Wire.(Make-Havells/Kei/Gloster)
Supply of 240V, 6-32Amp MCB of Breaking capacity 10kA & C characteristics.(Make- L&T/Legrand/Havells)
Supply of 240V, 40Amp DP isolator.(Make- L&T/Legrand/Havells)
Supply240/415V of 32 amp HRC fuse.(Make- Legrand/L&T/Havells)
Supply 415V of 63 amp HRC fuse.(Make- L&T/Havells)
Supply 415V of 125 amp HRC fuse link bottol type.(Make- L&T/Havells)
Supply of 2.5 micro farad fan condencer. (Make-Tibcon)
SCOPE OF WORK:- I) FOR EI MAINTENANCE:- a) The primary objectives of preventive and corrective maintenance are to minimize electrical breakdowns and faults, prevent fire hazards arising from electrical short circuits and faults, and reduce downtime. Any fire hazard incidents resulting from short circuits, or the falling of ceiling fans, luminaries, etc., due to inadequate maintenance will be treated with utmost seriousness. The maintenance agency shall be held accountable for such incidents. b) The electrical installation includes entire cabling network and wirings, BDB’s, PDB’s power & distribution cables, Compound lights, fittings & fixture. LT panels, UPS system etc. c) working time: 1 no Electrician, 1 no Helper FOR 1(One) shift every Day including holy day. At the time of emergency breakdown etc. of beyond maintenance hour agency must be provite staff to restore the problem.
II) FOR AC MAINTENANCE:- A) Routine checking and servicing (Preventive maintenance). The rate are inclusive of all taxes. i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. twice in each month. ii) Checking of performance of each machine, Load Current (Amp) , CFM, grill temperature¸ room temperature etc. twice in a month & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) In every three months, the Outdoor unit should be thoroughly cleaned and washed by vacuum cleaner and jet spray. iv) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. v) Cleaning of filters twice in each month. vi) Lubricating the bearing of the motor & fan as and when required vii) Checking the electrical incomer upto incoming M.C.B incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. viii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition. ix) If any fire hazard occurred due to poor maintenance of the Split/WindowAir Conditioning machine, the liability will goes to solely on the concerned maintenance agency.
B) Overhauling: i) Through overhauling of the machine part by part once in a year. ii) Cleaning & painting of the machine body, base tray etc. once in a year. iii) Cleaning & discalling of condenser unit, cooling coil etc. and gas leak test once & when required in a year. iv) Overhauling shall preferably be done during winter season and must be noted in the Log Book.
C) Supply & Repairing: This comprehensive contract covers preventive & corrective maintenance of A.C. machine/ spare parts as required so as to keep the A.C. machine operative/ functioning round the clock and for ensuring uninterrupted & trouble - free performance of the equipment. i) Replenishing refrigerant required as a result of a leak in system arising out of fair wear & tear as per requirement. ii) Supply of refrigerant shall be made as & when required by the Agency in his own cost for all AC Machine.. iii) Repair of microprocessor controls & to be replaced free of cost for all AC Machine. iv) Replacement capacitor (P2 type) incl. of all spare parts, including compressors , shall be made by the Agency for smooth running of the machine at his cost for all AC Machine. v) Filters be changed except nylon filter once in a year & the new once shall be approved by the EIC. vi) Replace/ repair of all spare parts of ductable split type (Like- Refrigerent, blower motor, remote sensing unit, controler, ducting, damper unit, all kind of valve, communication card, contactor and other electrical accerise etc) are to be made agency own cost. vii) No major parts shall be removed without permission of concerned Asstt. Engineer. Challan shall be obtained from Junior Engineer while taking away machine or parts from site for repairing and materials shall be returned/ repaireed within three days to worksite in Co’s challan.
D) Attendance of break down: i) Break downs to be attended by experienced AC machines immediately after receiving initiation from the Junior Engineer, Asstt. Engineer and the authority concerned. ii) AC machine must be provided with cell phone with contact no. iii) Nature of break down with date shall be recorded in the Log Book.
ADDITIONAL & SPECIAL TERMS & CONDITIONS OF CONTRACT- I) For E.I. Maintenance) The agency must provide measuring/operating equipment such as digital multimeter, clambmeter, thermal imeger, earth regeistance tester, low voltage insulation mager, hot air blower, air blower, screw driver set, all type of spaner, cable puncher etc. to the employed staff.
The agency shall maintain one Call Book which shall record all the calls alongwith remedial action taken, duly verified by the Junior Engineer/Assistant Engineer periodically.
Separate Log book is to be maintained for all L.T. installation . The daily record of the Log book is to be signed by the licensed Supervisor of the contractor and verified & signed by concerned Junior Engineer & Assistant Engineer; and the same should be sent to the Executive Engineer through proper channel at the time of submission of bills.
Recording of various electrical parameters (with co. own tools/equipments) of different L.T. panel board, BDBs, Main switches etc, are to be made in Log book in regular manner and the necessary working report in this respect to be submitted monthly to the concerned Assistant Engineer & Junior Engineer every day. Thermal imager should be used in measuring/observing temperature rise of electrical equipments like Cable, BDBs, L.T. panel boards, AC, Light fittings, etc. regularly to find out any abnormalities and the measurements are to be recorded in Log book compulsorily in proper manner every day.
In case, any abnormal reading is noticed, then the same should be rectified/set right immediately by taking prompt, appropriate & effective measures/actions by proper recording under intimation to the concerned Assistant Engineer & Junior Engineer.
The agency will check and clean all the ceiling fans exhaust fans, stand fans etc. to prevent falling down of those as a measure of safety and maintain a register mentioning fan numbers etc. including keeping those light fittings and fans clean as per the direction of Assistant Engineer or respective Junior Engineer.
All the ceiling fans of every Buildings are to be inspected, at least once in 3(three) Months, in respect of Split Pin, Jam nut, fan clamp & suspension arrangement etc. to avoid unwanted falling of Ceiling Fans, failing which responsibility will be fixed up upon the agency (in case of falling of ceiling fans). Report regarding physical condition of Split Pin & Jam Nut must be submitted quarterly in the format prescribed by the EIC.
All the fittings, fixture, panel board, PBDB, SPNDB Main-switches & other Electrical Installation inside all the block/floor/buildings as well as for compound lighting installation must be kept in a tip top condition by cleaning of all the said electrical equipments, dusting off accumulated dirt, cobweb etc. once in a month, and all the cleaning materials like detergent etc. are to be supplied by the agency free of cost.
The agency will have to attend all the break-down/fault of any nature involving electrical installation within the scope of contract and restore the same with its own manpower, tools & tackles keeping entries in Log books mentioning type of faults, nature of work done, fault clearance time etc.
All incidents of breakdown shall be immediately reported to the concerned Junior Engineer & Assistant Engineer, or direct to Executive Engineer in exceptional circumstances.
All the maintenance staff of the contractor should have proper & constant vigilance and check to ensure that there is no sign of overheating, burning smell, discoloration or sparking/chattering at any of BDBs, panel boards, etc. due to overloading or loose connection/termination. Care should be taken to check any highly unbalanced loading at any point. N.B:Periodical check on daily basis by thermal imager scan is required to be carried out for BDB,PDB,Cables, Panels, , Main switches etc and kepping the record and should be reported to the concerned JE on regular basis.
The weekly duty roster of the deputed staff should be submitted in advance.
The contractor shall issue identity cards to every member of his staff, regular or substitute. No staff will be allowed to perform duty without proper identity card and the agency shall have to assume responsibility for any untoward incident/situation.
The authorized licensed supervisor should attend the site regularly and in case of emergency he should attend without any delay and report the incident to the Engineer in Charge.
Frequent change of staff is not allowed. Substitute staff list shall have to be submitted at least one week in advance to the Junior/Assistant Engineer.
Recording of attendance should in the in the attendance register as per the direction of the EIC and shall be regularly checked and verified by the concerned Junior Engineer/Assistant Engineer. Monthly attendance report should be submitted along with the Bill.
Proof of verification of attendance of the staff deputed in the night shift (10 pm to 6 am) by the authority is mandatory for billing purpose.
The agency must have separate contact numbers preferably mobile phone numbers for his office and the deputed Supervisor (maintenance team) so that the communication can be easily made in case of urgency.
The space for sitting accommodation for the staff of the agency inside the compound will be provided by the PWD/user authority.
The Engineer-in-Charge reserves the right for re-allocation of duty to any or all member of the staff as per the requirement of the site or elsewhere.
Materials required as replacement during maintenance of electrical installations like fuse wires, screws, nuts, bolts, washers, AL/Cu socket (up to 35 sq. mm.) dusters etc will be supplied Agency so far as practicable, through a separate Issue register to be maintained by the agency at site.
The replaced / dismantled materials generated for carrying out breakdown or preventive maintenance or due to civil renovation / dismantling work are to be carried out and deposited to the respective Section Office or any other locations within the compound by the agency by its own labour / arrangements / tools and tackles as per the direction of the Assistant Engineer concerned. If required, the agency will have to dismantle existing electrical installations in connection with any civil renovation / dismantling work and deposit the same to convenient locations as per the direction of the Assistant Engineer concerned by its own labour / arrangements / tools and tackles.
Any fault of electrical installations , LT cables and all sub- panels, distribution boards, related main switches, isolators, earthing attachments, compound lights etc has to be detected, attended and restored by the agency by its own man power with the help of the materials (cables, main switches, DBs, wires, HRC fuses etc) available from this department or as per the terms & conditions of this contract.
a) Routine checking and preventive maintenance of the electrical installation has to be carried out by the agency daily with a view to ensure uninterrupted power supply within compound. Any negligence in the part of the agency in complying with any of the above described terms & conditions causing inconveniences to public service will be viewed otherwise and is subject to unilateral penalty, be it detected on the spot of thereafter (even after payment).
b) Routine inspection of the electrical and allied installation shall be carried out by the agency every morning to ensure that all the light/fan socket outlets/ AC/ UPS and other items of work, as may be directed by Junior Engineer/ Assistant Engineer/ Executive Engineer from time to time are in order and action for restoration shall be taken immediately for faulty items.
In case of any breakdown caused by cable fault, etc. , the agency will have to restore the power supply either with the materials available with this department or arranging the same temporarily and safely till completion of permanent restoration work as may be directed by the Engineer-in-Charge.
Maintenance materials, viz. Incandescent lamps, Main switches, Power DB, SPN BDB, Main & Sub-main cables, fluorescent/LED tubes, Chokes, Ignitors, and Condensers etc. will be supplied by the Department. However auxiliary items like screws, nuts & bolts, washers, fuse wire, insulating tapes etc. will have to be arranged by the agency on its own expense.
No materials should be taken out of the maintenance site without the permission and necessary Challan of the site-in-charge.
The agency will take care to prepare the requisition of materials required for the maintenance within his jurisdiction well in advance and submit the same to the concerned Junior Engineer so that no delay in maintenance/repair / replacement cause trouble in the system & hampering of the service thereof.
The repairing of the different type of light fittings, ceiling fans, exhaust fans etc. have to be done by the agency incl. dismantling and re-fixing the same. (Materials to be supplied by Department).
In case of power failure or development of any unfavorable situation, the agency will have to communicate with concerned WBSEDCL authority and extend co-operation to them in restoring of power supply. Meanwhile, the agency will have to operate the switching mechanisms of interconnections among available sources at suitable locations to maintain power supply at important locations by monitoring electrical loads in consultation with concerned Junior Engineer/Assistant Engineer.
Any major shut down or fault should be brought to the notice of EIC immediately in writing and over telephone for further course of action.
Insulation test with the help of Megger for the entire Electrical Installation as well as earth resistance of the earthing installation for each building and also sub-station are to be carried out in the presence of concerned Assistant Engineer/Junior Engineer once in six months and the result thereof is to be furnished to the Engineer –In-Charge through proper channel alongwith the bill.
The agency must have separate offices & separate contact telephone nos. for his site office and main/head/branch office and the same should be intimated to this Department in writing. All telephone calls should be responded without delay.
The agency should be responsible for any damage in the installation due to mishandling / mal-operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per direction of E.I.C. and the accused staff should be replaced immediately.
If any kind of incapability & negligence are noticed in observing all the above-said terms & conditions, this Department posses the right to deduct the cost from the bills of the contractor on pro-rate basis as determined by the Engineer –In-Charge. In that case, the above-said contract may be terminated without issuing any notice whatsoever and stringent & punitive action may be taken against the contractor as may be decided by the Engineer-in-Charge or higher authority.
Valid workman’s permits, electrical licence, Diploma certificate, identity proof etc. are to be furnished for each electrician/workman, helper & Diploma Electrical Engineer/Supervisor engaged by the agency along with the name & contact mobile no. of the persons and all these information with supporting documents are to be submitted in written to the concerned Junior Engineer, Assistant Engineer & Executive Engineer.
The contract may be terminated by one month’s notice from either side.
Any negligence in the part of the agency in complying with any of the above-mentioned terms and conditions and/or causing inconvenience to public service will be viewed seriously and shall be subject to unilateral penalty, be it detected on the spot or thereafter (even after payment of bills).
The agency should have been responsible for any damage in the installation due to mishandling or mal-operation. If so, the cost for rectification or replacement will be recovered from the bill on proportionate and the incident will be counted while issuing the performance report.
The agency will have to maintain log books in such a manner so that at least one log book may always be made available at site as and when asked for.
Bills should be submitted quarterly or as per direction of EIC, keeping at least one spare log book at site. Payment will be made as per PWD norms against placement of bills supported by log book and duly verified by the Junior Engineer / Assistant Engineer.
Labour laws : Before undertaking the work as per order, agency must produce labour license obtained from the Assistant Labour Commissioner/Dy. Labour Commissioner’s office in the Region in compliance with the provisions of Central Labour Regulation & Abolition Act, 1970 and the rules made thereunder. He should comply with all labour laws to protect the labourers engaged by him. The successful bidder after placement of the order shall have to comply with following in order to get payment : a) He shall have to follow the rules and regulations of the prevailing Acts of Central and State Governments. b) He shall be responsible for compliance of statutory obligation under the Central Labour (R&A) Act, 1978, Minimum Wages Act, 1948, Payment of Wages Act 1936, Bonus Payment Act, 1956, and also be responsible for payment of contribution (Both employer and employee’s) under Provident Fund Act & Employees’ State Insurance Act,1952 in respect of the employee. c) He shall be solely responsible for any accident, occurring if any, during the course of the work or any injury to any person and in the event of any such accident/injury he will be held responsible and must pay proper compensation for the same as per Workmen’s Compensation Act, 1923 (when Employee State Insurance Act 1948 is not applicable); d) No labour of minor age should be employed; e) Statutory minimum wages for all categories of labour are to be paid as per notifications issued by the appropriate authority of the Government from time to time:
Uniform, safety shoes, helmet, raincoat, umbrella, gumboot, torch/ emergency light, etc. and all types of tools and tackles (Like digital multimeter, tongtester, earth regeistance tester, low voltage insulation mager, hot air blower, air blower, screw driver set, all type of spaner, cable puncher, lader etc) are to be provided by the agency to its staff.
All the issues related to the safety of the staff should be taken care by the Agency itself.
In case of any mishap or accidental injury to any member of the staff deputed by the agency, the whole responsibility is to be borne by the agency but should be informed to the EIC immediately.
Any unethical/unruly attitude/behaviour or activity of the agency or any of his deputed staff should be viewed seriously and legal action would be taken accordingly by this end.
The philosophy of “Public Interest” would be the ‘motto’ of this maintenance contract. Any deviation may be viewed otherwise and action taken accordingly.
It will be the duty and responsibility of the agency to ensure strict compliance of the provisions of the contract. Should any major or recurring deviation or negligence be observed/detected in execution of the contract by the agency during any scheduled/surprise inspection of the higher authority, penal action will be taken with retrospective effect without any further reference/correspondence, and without any prejudice to the right of the Engineer-in-Charge to terminate the contract by invocation of any of the clauses of the contract.
The Executive Engineer/ Assistant Engineer the right to depute any both members of the maintenance staff to other site, in exigency of public service, restore normally or assist other team members working there.
The Maintenance Personnel, deputed by the agency should be a permanent resident of West Bengal with valid Voter / Aadhar Identity Card and should possess valid Workman Permit/ License, as mentioned below, issued by Directorate of Electricity, Govt. of West Bengal. Sl. No Category of Maintenance Personnel Mandatory Requirement 1. Electrical Supervisor SCC Part No. 1,2,3,4,5, 6A, 6B, 7A,7B, 10,11& 12 or National SCC /Highly skulled issueded by, DOE, WB 2. Skilled Electrician ITI/ Equivalent Certificate Holder Electrical/ SCC Part No. 1,2,3,4,6A,6B, 7A,7B, 11, 12 issued by Directorate of Electricity, West Bengal 3. Semi-Skilled Electrician Workman Permit i(a) and/ or i(b) and (ii) issued by Directorate of Electricity, West Bengal 4. Unskilled Personnel/ Helper Basic knowledge of Electrical works (Experience Certificate from reputed Electrical firm required)
Supply materials will be supplied by the entrusted agency time to time as per requirement of the site.
II) FOR AC MAINTENANCE:- i) All payments shall be made as per Govt. rules. ii) Agency may raise bills for quarterly payment. He shall submit service challan and Monthly Log Sheet (Format given by department) duly filled & countersigned by the Junior Engineer,& Asstt. Engineer mentioning therein the performance of the machine with grill temperature, room temperature at the time of servicing along with the log book duly signed by the JE & AE concerned. iii) No extra payment shall be made for repairing & replacement of machine parts or refrigerant. iv) The Log Book shall be kept upto-date & ready at Junior Engineer Chamber for verification by higher authority at any time & to be produced whenever demanded by the EIC for verification. v) The Executive Engineer reserves the right to terminate the contract at any time with one month notices. vi) If the Agency fails to make a break down machine operational with in 24 Hrs. or fails to provide replacement of the machine from his own working machine (loan machine), deduction from the bill will be made @`20/- for each day for split machine @ 200/- for each day for ductable type AC machine in excess of 24 Hrs.
ELCON ENGINEERS
CHAKRABORTY ELECTRIC
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .