Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC | ₹32.9 L | L1 | Accepted-AOC selected in the lottery |
| 2 | L1₹32.9 LRejected-Finance | ₹32.9 L | L1 | Rejected-Finance not selected in lottery |
| 3 | L2₹33.7 L+₹82,579.50 (2.51%)Rejected-Finance | ₹33.7 L+₹82,579.50 (2.51%) | L2 | Rejected-Finance not L1 |
| 4 | L3₹34.6 L+₹1.7 L (5.20%)Rejected-Finance | ₹34.6 L+₹1.7 L (5.20%) | L3 | Rejected-Finance not L1 |
| 5 | L4₹35.3 L+₹2.5 L (7.53%)Rejected-Finance | ₹35.3 L+₹2.5 L (7.53%) | L4 | Rejected-Finance not L1 |
Tender Value
₹44.2 L
EMD Value
₹44,160
Closing Date
30 Mar 2026, 5:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer, (RandB) Division, Nayagarh
Repair and Renovation of Academic building , Workshop building and Ladies Hostel building at Govt. Polytechnic Nayagarh in the District of Nayagarh.
2026_EICCL_127500_16
eTCN11 of 2025-2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹44,160
Yes
1 Sept 2026
23 Mar 2026
31 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris within 50m lead. Per 1 sqm | 1 | cum | - | - |
| 2 | Earth work in excavation in foundation in hard with initial leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete | 1 | cum | - | - |
| 3 | Filling foundation and plinth with sand well watered & rammed with cost, conveyance, royality, taxes etc. complete. | 1 | cum | - | - |
| 4 | Plain cement concrete (1:3:6) nominal mix in foundation as per Drawing and Technical Specification with 4cm size hard granite metal including cost, conveyance, royality, taxes, watering and curing etc. complete. | 1 | cum | - | - |
| 5 | Fixing interlocking paver Block of 60mm thick of premium grade in floors treads or steps and on 25mm thick bed of cement mortar 1:1(1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost, carriage, royalty & taxes of all materials, cost of all labours T&P etc complete. | 1 | cum | - | - |
| 6R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying in Roof Slab Cover Slab | |||||
| 7 | Supplying fitting and placing uncoated HYSD bar reinforcement complete asper drawing and technical specification. | 1 | cum | - | - |
| 8Flay ash bricks of 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and super structure per cum. In Superstructure(Ground Floor) | |||||
| 9In Superstructure(First Floor) | |||||
| 10 | 12mm thick cement plastering in cement mortor 1:6 in finished smooth surface of brick wall after raking joints including cost, conveyance, royalties ,taxes of all materials etc complete. | 1 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
BOQ_585958.xls
BOQ • 0.33 MB
DTCN1117.pdf
Tender Documents • 1.20 MB
1stCorrigendum.pdf
Additional Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .