Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹1.4 Cr Construction of New Building for Urdu, Yoga and Music and Adult Education (G plus 2) for Dr. Hari Singh Gour University Campus, Sagar (M.P.). SH: Construction of 04 Lakh Litre Underground Sump including collection tank at Boys hostel and pipe works at Dr. Hari Singh Gour University Campus, Sagar (M.P.). | Construction of New Building for Urdu, Yoga and Music and Adult Education (G plus 2) for Dr. Hari Singh Gour University Campus, Sagar (M.P.). SH: Construction of 04 Lakh Litre Underground Sump including collection tank at Boys hostel and pipe works at Dr. Hari Singh Gour University Campus, Sagar (M.P.). | ₹1.4 Cr | L1 |
| 2 | L2₹1.7 Cr+₹32.7 L (23.9%) Construction of New Building for Urdu, Yoga and Music and Adult Education (G plus 2) for Dr. Hari Singh Gour University Campus, Sagar (M.P.). SH: Construction of 04 Lakh Litre Underground Sump including collection tank at Boys hostel and pipe works at Dr. Hari Singh Gour University Campus, Sagar (M.P.). | Construction of New Building for Urdu, Yoga and Music and Adult Education (G plus 2) for Dr. Hari Singh Gour University Campus, Sagar (M.P.). SH: Construction of 04 Lakh Litre Underground Sump including collection tank at Boys hostel and pipe works at Dr. Hari Singh Gour University Campus, Sagar (M.P.). | ₹1.7 Cr+₹32.7 L (23.9%) | L2 |
| 3 | - | - | - |
| Sl No | Description | Qty | Unit | M/s Rohit Anthony L1 | M/s TKN DEVELOPERS L2 |
|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -27.29 ₹1,00,16,784.09 Lowest | -9.2 ₹1,25,08,925.8 |
| 2 | Electrical Work | - | - | -25 ₹36,98,300.25 Lowest | -9.2 ₹44,77,408.84 |
Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
6 Mar 2025, 3:00 pmClosed
EE-Bhopal-II
PRASOON KUMAR PAL
EE-Bhopal-II
Construction of New Building for Urdu, Yoga and Music and Adult Education (G plus 2) for Dr. Hari Singh Gour University Campus, Sagar (M.P.). SH: Construction of 04 Lakh Litre Underground Sump including collection tank at Boys hostel and pipe works at Dr. Hari Singh Gour University Campus, Sagar (M.P.).
104458
27/CE(Bhopal)/EE-II/2024-25
OPEN
Civil Works - Others
NCB
5 months
Sagar, Madhya Pradesh
11 documents required · 11 mandatory
₹3.7 L
Not Applicable
6 Mar 2025
27 Feb 2025
6 Mar 2025
6 Mar 2025
2 Mar 2025
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
CorrectionSlip.pdf
document • 28.23 MB
PartB.pdf
document • 0.47 MB
CivilSchedule.pdf
document • 0.07 MB
PartC.pdf
document • 0.28 MB
ElectricalSchedule.pdf
document • 0.07 MB
Cover+ABC.pdf
document • 0.04 MB
NITcover.pdf
document • 0.38 MB
PartA.pdf
document • 0.24 MB
SOQProforma.pdf
document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .