Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹2.5 L
Closing Date
29 Jun 2026, 9:30 pm
Cauvery Neeravari Nigam Limited
Construction of Bridge and Checkdam across Baavi halla near the land of Hankya naika in Chamundipura village of Kolagondanahalli G.P. Kanakapura taluk
306111
CNNL/2026-27/IW/WORK_INDENT5158
Open
Irrigation and Other Works
CNNL Mekedatu Project Div Harobele
6 documents required · 6 mandatory
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Construction of Bridge/checkdam of value not less than Rs.81.00 Lakhs Note: Work done certificate issued by competent authority not below the rank of Executive Engineer should be furnished Financial turnover & Work done of previous years indicated above shall be given a weightage of 10% per year to bring them to the price level of 2025-26
Executed in any one year , the following minimum quantities of work(1)Cement Concrete (Cum) 1200 (2)Steel (tonne) 16.60 Note: Work done certificate with year wise breakup of quantities should be furnished
Tenderers who meet the above specified minimum qualifying criteria will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as underAssessed available tender capacity (AxNx1.5-B) Where A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2026-27 price level) taking into account the completed as well as works in progress,N Number of months prescribed for completion of the works for which tenders are invited, B Value at 2026-27 price level, of existing commitments and on-going works
List of Key Minimum Technical personal required for the work are as under and should be enrolled in company/ firm/company/ should Employment register and document should be uploaded of Civil Engineer / Diploma holders: Civil Engineering with Min 5 years experience of one No
Achieved in at least two financial years an average annual financial turnover (in all classes of Civil Engineering construction works) only of Rs.322.40 Lakhs Note : Turnover certificate duly certified by Chartered accountant along with audited balance sheets should be furnished
Liquid assets and /or availability of credit facilities of no less than Rs 48.40 Lakhs (Credit lines/ letter of credit/ certificates from scheduled / nationalized banks for meeting the fund requirement etc.) in the prescribed format
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
₹4,030
₹2.5 L
12 Jun 2026
12 Jun 2026
30 Jun 2026
29 Jun 2026
16 Jun 2026
Construction of Bridge and Checkdam across Baavi halla near the land of Hankya naika in Chamundipura village of Kolagondanahalli G.P. Kanakapura taluk
Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete. complete with all lead and lifts and as directed by the engineer in charge.
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates for levelling course for all works in foundation. The granite/trap/basa...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material complete with all lead and lifts and as directed by...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towa...
Providing and fixing 50 mm diameter and 750 mm long perforated GI pressure relief pipe with one end closed by perforated GI plate and other end provided with alluminium lid hinged to pipe including co...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing and fixing 25 mm dia 2.50 m long cold twisted defomed steel anchor rod with 1.25 m length driven into 38 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry i...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of contractor, work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and fixing 25 mm dia 3 m long cold twisted defomed steel dowel bars with one end driven into 38 mm dia 1.50 m deep hole drilled in bed rock and other end provided with L - bend for mbedding ...
Providing rubble and sand filling in layers of 250 to 300 mm including cost of all materials, machinery, labour, watering, ramming etc.,complete with all lead and all lifts. complete with all lead and...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite /trap /basalt crushed graded coarse aggregates and fine aggregates as per relevant ...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufactur...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification complete with all lead and lifts and as directed by the engineer in charge.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. complete with all lead and lifts and as directed by the engin...
Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification complete with all lead and lifts and as directed by the engineer in charge.
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW4 5158.doc
Tender Document • 10.41 MB
Download all tender documents and submit your bid