| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance | L1 | Accepted-Finance BELOW RATE QUOTED | |
| 2 | L2₹7.3 L+₹390.41 (0.05%)Rejected-Finance | L2 | Rejected-Finance ABOVE RATE QUOTED |
Tender Value
₹7.4 L
EMD Value
₹7,500
Closing Date
7 Jun 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.pt) KILPENNATHUR
BLOCK DEVELOPMENT OFFICE KILPENNATHUR
Construction Of New Kitchen Shed in PUM School AT Kallayee Panchayat at Kilpennathur Block in under 15TH FC BLOCK PANCHAYAT 2023-2024
2023_RDTN_321189_1
ASNOA7266922ADPTSDT27.04.23_5
Open Tender
Civil Works
Item Rate
180 days
KILPENNATHUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,500
8 Jun 2023
31 May 2023
7 Jun 2023
31 May 2023
7 Jun 2023
31 May 2023
Amount
Construction of New Kitchen Shed Building @PUMS Kallayee Panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.)
Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Weathering course in lime concrete using brick jelly 20 mm size including cost and conveyance and all labour charges etc complete
Terrace flooring with one course of pressed tiles size of 20 x 20 x 2cm using CM1:3 mixed with crude oil 10% by weight of cement and pointed with cement mortor 1:3 etc., complete
Floor finishing with Granolithic flooring in CC 1:2:4 mix using 10 - 12 mm ISS metal inckluding cost and conveyance of all materials and labour charges , etc, complete.
Ceiling Plastering with cement mortar 1:3 mix to 10 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
White washing two coats using shell lime including cost and conveyanceand all labour charges ctc. Complete
Distempering two coat with priming coat and two coat with OIL BOUND Distemper over Cement plastered surface, ceiling and other new surface including cleaning preparing the surface etc, complete.
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (New) including cost and all labour charges etc. complete
Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with standard specifications and as directed by the departmental officers.
Cost and Supply of steel doors of Specified Gauge and thicness as Directed by the departmental offcers, including all labour charges and fabrication charges etc, complete.
Cost and Supply of steel windows of Specified Gauge and thicness as Directed by the departmental offcers, including all labour charges and fabrication charges etc, complete.
provision for Cuddapha slab cubboard etc.,
Electrical arrangements
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
Towards cost and fixing of CFL bulb fittings with pipe and bilkets etc (SD 80)
Supply and fixing single type flu fitting compelete with copper choke and condenser with TW round blocks on wall or ceiling with flu tube with PVC Unsheated leads from terminals to the fittings (SD 88)
Supply and fixing of WT bulk head fitting with guard for 11W CFL SD 83
supplying and fixing of 500 lit pvc tank including cost of all matreial and labour charge .=9.6*1000=9600
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Fathimabee
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .