| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC The work has been awarded to Udit Narayan Pradhan |
| 2 | L2₹2.3 Cr+₹7.0 L (3.19%)Rejected-Finance | ₹2.3 Cr+₹7.0 L (3.19%) | L2 | Rejected-Finance Rejected Bidder |
| 3 | L3₹2.7 Cr+₹47.0 L (21.4%)Rejected-Finance AT CHAKRA RAGHUNATHPUR PO CHHOTI DIST KENDRAPARA 754214 | KENDRAPARA | KENDRAPARA | ODISHA | 754214 | ₹2.7 Cr+₹47.0 L (21.4%) | L3 | Rejected-Finance Rejected Bidder |
| 4 | L3₹2.7 Cr+₹47.0 L (21.4%)Rejected-Finance | ₹2.7 Cr+₹47.0 L (21.4%) | L3 | Rejected-Finance Rejected Bidder |
| 5 | L3₹2.7 Cr+₹47.0 L (21.4%)Rejected-Finance AT NUKERKFRE PUR P D ALAVA P S ALADI DIST KENDRAPARA | ₹2.7 Cr+₹47.0 L (21.4%) | L3 | Rejected-Finance Rejected Bidder |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
19 Feb 2026, 5:00 pmClosed
Chief Construction Engineer,R.W Circle KPD-JJP
O/o CCE,R.W Circle,Kendrapara-Jajpur
Construction of Building works
2026_CERWI_125577_1
Tender Online RCK-01/26
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
Kendrapara
Please refer tender documents
4 documents required · 4 mandatory
₹10,000
₹2.7 L
Yes
22 Jul 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
5 Feb 2026 - 19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in hard soil with initial lead and lift including rough dressing and breaking clods upto 5cm to 7cm size and laying in layers each layer not exceeding 0.3m in depth etc. complete. | 286.89 | Cubic Meters | 304.93 | ₹87,479.93 |
| 2 | Construction of Embankment with approved material obtained from borrow pits with all lead &lifts transporting to site by mechanical means within a lead of 5 km spreading, grading to the required slope & compacting to meet the requirement of table 300-2& clause 305 of MoSRT&H specification for road & Bridge works ( 4 th Revision) | 262.8 | Cubic Meters | 256.05 | ₹67,291.12 |
| 3 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. | 296.56 | Cubic Meters | 1,351.9 | ₹4,00,919.46 |
| 4 | C.C. of proportion (1:3:6) in foundation and floors using 4cm (3/2) inch size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6) inch thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work, but excluding cost of Centering and Shuttering for Mass Concrete etc complete. | 182.49 | Cubic Meters | 7,106.8 | ₹12,96,919.93 |
| 5 | Providing & erecting necessary plants, equipments and labour for boring holes and casting of 375 mm dia bored cast-in-situ Double under reammed RCC piles of 15.0 mtr length below the finished ground level as per drawing or as directed by the Engineer-in-charge for all piles with RCC M30 grade desgin mix concrete and rate shall include supply and cost of all materials such as stone chips, sand, cement and bentonite with all leads and lifts of materials but excluding the cost of reinforcement and the cost of boring holes for piles shall be included in the unit rate of piles. | 1,350 | RM | 1,753.96 | ₹23,67,845.24 |
| 6 | Providing fly ash brick masonary using fly ash.bricks in cement mortar(1:6) after immersing bricks for six hours in water before use in superstructure using fly ash bricks of 9 inch size having a crushing strength of not less than 50kg/sqm including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curring etc.complete including cost and conveyance of all materials and labour and T and P required for the work etc.complete. In Foundation | 72.87 | Cubic Meters | 5,811.9 | ₹4,23,513.15 |
| 7 | In Super Structure (Ground Floor) | 207.73 | Cubic Meters | 5,845.2 | ₹12,14,223.4 |
| 8 | First Floor | 138.39 | Cubic Meters | 6,223.6 | ₹8,61,284 |
| 9 | R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement.
Rcc in Footing or Column Base | 71.08 | Cubic Meters | 8,026.95 | ₹5,70,555.61 |
| 10 | Rcc in Plinth Beam | 16.53 | Cubic Meters | 8,328.6 | ₹1,37,671.76 |
stage.html
html • 0.18 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_579487.xls
BOQ • 0.39 MB
DTCN.pdf
Tender Documents • 8.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .