Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 8TH WAD BCM ROAD BANDIKERI KAMALAPUR BELLARY KARNATAKA 583221 | VIJAYNAGAR | KARNATAKA | 583221 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹23.6 L+₹1,583.38 (0.07%)Rejected-AOC AKKAMAHADEVI ROAD VIJAYAPURA 586101 | VIJAYAPURA | VIJAYAPURA | KARNATAKA | 586101 | L2 | Rejected-AOC Not being L1 | |
| 3 | L3₹27.3 L+₹3.8 L (16.1%)Rejected-AOC | L3 | Rejected-AOC Not being L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Does not satified the technical eligibility criteria as per tender condition | |
| 5 | Rejected-Technical 189 9 1 KADUGODI BANGALORE KARNATAKA 560067 | BENGALURU URBAN | KARNATAKA | 560067 | - | Rejected-Technical Does not satified the technical eligibility criteria as per tender condition |
Tender Value
₹22.4 L
EMD Value
₹56,080
Closing Date
5 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist, ASI, Dharwad Circle,
O/o Superintending Archaeologist, Archaeological Survey of India, Dharwad Circle, Behind Kannada Sahitya Bhavan, Near R N Shetty Stadium, Dharwad-580008
EXECUTION OF WORK UNDER, MW(CONS) TO KADAMBESHWAR TEMPLE, RATTIHALLI DIST. HAVERI.
2022_ASI_719269_1
Sout/Dhar/Have/12 K/12550550
Open Tender
Civil Works
Works
120 days
Kadambeshwar Temple Rattihalli
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹56,080
Yes
27 Dec 2022
20 Oct 2022
7 Nov 2022
20 Oct 2022
5 Nov 2022
20 Oct 2022
Amount
EXECUTION OF WORK UNDER, MW(CONS) TO KADAMBESHWAR TEMPLE, RATTIHALLI DIST. HAVERI.
Demolishing old compound wall and Katta portion of stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area, complete as per the direction of Engineer in- charge.
Providing and laying in position plain cement concrete of Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications and as per the instruction of engineer in charge.
Providing Size Stone masonry to the compound wall with hard stone with Cement mortar 1:6 (1 cement : 6 coarse sand) The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements, curing and all other appurtenances required to complete the work as per technical specifications and as per the instruction of engineer in charge.
Providing and laying in position cement concrete of Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates over the compound wall for coping and for fixing the grill of granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers . The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications and as per the instruction of engineer in charge.
Providing and fixing grill as per the approved design over the new compound wall using old removed grill and providing the new grill to the remaining length. All the steel surface should be thoroughly cleaned free of rut and painted with anti-corrosive paint etc., complete The work includes cost of all materials, labour charges for all items of work , hire charges for welding, cutting and grinding equipment, and electricity charges etc., complete as per specification.
Providing and fixing the turn style gate in the western side as per the design. All the steel suface should be thoroughly cleaned free of rut and painted with anti-corrosive paint etc., complete The work includes cost of all materials, labour charges for all items of work , hire charges for welding, cutting and grinding equipment, and electricity charges etc., complete as per specification and as per the instruction of engineer in charge.
Carefully erecting and dismantling of 2 legged tubular scaffolding for the racking out the joints and pointing work using the scaffolding materials, with out causing any damage to the monument, etc complete as per the instruction of the engineer in charge.
Racking out of the joints at the shikara, and parapet wall of monument including preparing the surface for providing fresh pointing/ gap filling etc. complete carefully with out causing any damage to the monument, including water washing, cost of labours, conveyance and disposing debris away from the site etc. complete as per the instruction of the engineer in charge.
Providing pointing/ filling gaps to shikara, parapet wall etc.,complete using 1:1:1 Lime Mortar including cost of materials, labour charges, conveyance of materials, mixing, laying, curing etc. complete as per the instruction of the engineer in charge.
Carefully removing of the dead concrete water proof coarse to the original depth at the roof of the monument with out causing any damage to the monument and the structural and architectural members, including cost of labours, conveyance and disposing the same away from the site including transportation charge, conveyance, etc complete as per the instruction of the engineer in charge.
Racking out of the joints between the stone slabs of roof, etc. and preparing the surface for providing fresh pointing/ gap filling etc complete carefully with out causing any damage to the monument, including water washing, cost of labours, conveyance and disposing debris away from the site etc complete as per the instruction of the engineer in charge.
Providing grouting and pointing/ filling gaps stone slabs of roof, etc, complete using 1:1:1 Lime Mortar including cost of materials, labour charges, conveyance of materials, mixing, laying, curing etc complete as per the instruction of the engineer in charge.
Providing and laying of Lime Concrete water proof coarse over the roof using 1:1:1 Lime mortar with 20 mm down size brick bats with proper slope to the existing outlet for free flow of the water including proper ramming, cost of materials, labour charges, mixing, laying, proper curing etc. complete as per the instruction of the engineer in charge.
Providing the Clay tiles using lime mortar over the roof including transportation charges cost of materials, labour charges, laying, proper pointing and curing etc. complete as per the instruction of the engineer in charge.
DHARMENDRA P JADHAV
Sharanappa S Shankinadasar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .