Tender Value
₹70.7 L
EMD Value
₹1.4 L
Closing Date
30 Jul 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
TECHNICAL
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of [V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Tenderer must have to submit valid Electrical Contractor license as per Indian Electricity Rules for the respective category of works and issued by Government Electrical Licence Board on or before closing date of tender. Copy of which should be submitted along with the tender offer, otherwise tender will be summarily rejected.
The Similar nature of works for this instant tender shall be "Supply ,erection, testing & commissioning of overhead transmission line work(11 KV & above)." The tenderer should have executed the similar nature of works in Central /State Government department or PSUs of Central /State Government."
Experience in similar nature of work:- a) The tenderer must have successfully completed any of the following during last 07(seven) years, ending last day of month previous to the one in which tender is invited: Three similar nature of works each costing not less than the amount equal to 30% of the advertised value of the tender, or Two similar nature of works each costing not less than the amount equal to 40% of the advertised value of the tender, or One similar nature of work each costing not less than the amount equal to 60% of the advertised value of the tender. (b) (i) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. And in the case of major bridges - substructure, superstructure etc.), the tenderer must have successfully completed any of the following during last 07 (seven) years, ending the last day of the month previous to the one in which tender is invited: Three similar nature of works each costing not less than the an amount equal to 30% of the advertised value of each component of the tender, or Two similar nature of works each costing not less than the amount equal to 40% of the advertised value of each component of tender, or One similar nature of work each costing not less than the amount equal to 60 % of the advertised value of each component of the tender. Note for b(i): Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria. (b) (ii) In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (iii) To evaluate the technical eligibility of the tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility shall be considered. The scope of work covered in other remaining components shall be either executed by the tenderer himself if he has work experience as mentioned in clause 7 (a) (ii) of Part-II of GCC or through subcontractor fulfilling the requirements as per clause 7 of Part-II of GCC or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. In case after the award of the contract or during the execution of work it becomes necessary for the contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of Part-II of GCC, with prior approval of the Chief Engineer in writing.
51 conditions · 3 needing a document upload
Whether the cost of earnest money deposited
WHETHER VALID ELECTRICAL CONTRACTOR LICENCE SUBMITTED.
Payment of Earnest Money deposit (EMD) & Tender Document Cost (TDC), in respect of e-tendering,should be accepted through net banking or online payment gateway only
Migration to GST regime - Special Tender Conditions: The rates should clearly indicate the rate of applicable duties and taxes included in the prices quoted by them. Any variation in tax structure/ rate due to introduction of GST, shall be dealt with under Statutory Variation Clause. It should be ensure that bidders/tenderers are GST compliant and quoted tax structure/rates are as per GST Law.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor should submit the GSTIN number and same should be mentioned in the bills along with a copy of GSTIN registration certificate while submitting the bills to accounts for audit and payment, As GST is scheduled to implemented wef 01.07.2017. Without GSTN, no bill will be accepted w.e.f. 01.07.2017
From 01.07.2017 GST has been implemented but the detail guideline is still not clear. Hence, new tax structure on materials and labour will be applicable to both Railway & contractor after getting proper notification
Outsourcing of manpower for repair & maintenance of 33KV Railway dedicated feeder from Kalain to BXK under the jurisdiction of SSE/P/BPB for two years (730 Days).
EL-LM-25-26-37-RT-2
EL-LM-25-26-37-RT-2
Open
Works - General
730 Days
Hojai, Assam
₹0
₹1.4 L
30 Jul 2026
7 Jul 2026
16 Jul 2026
86 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 23,96,487.8 | ||
| — | 730.00 | Man-Days | — | ||
| Outsourcing of 01 (One) No. skilled manpower for carrying out fault rectification, repair, preventive/breakdown maintenance and replacement of all electrical assets pertaining to 33 kV Kalain-BXK Railway dedicated feeder under the jurisdiction of SSE/Elect/BPB. The manpower shall be deployed round the clock as per site requirement and instructions of Site In-Charge. The scope includes attending emergency breakdowns, patrolling, line maintenance, equipment servicing, assisting in testing and commissioning activities, and ensuring uninterrupted power supply to the feeder.Total engagement: 730 Man-days (1 x 730). The quoted rate shall be inclusive of wages, statutory compliances (EPF/ESI as applicable), tools & tackles, safety equipment, and all incidental charges required for execution of work. | — | — | — | 7,47,308.3 | |
| — | 2190.00 | Man-Days | — | ||
| Outsourcing of 03 (Three) Nos. unskilled manpower for carrying out fault rectification, repair, maintenance and replacement of all electrical assets pertaining to 33 kV Kalain-BXK Railway dedicated feeder under the jurisdiction of SSE/Elect/BPB. The manpower shall be deployed round the clock as per operational requirement and instructions of Site In-Charge for assisting in breakdown maintenance, patrolling, material handling, excavation, cable laying assistance, and other allied electrical works. Total engagement: 2190 Man-days (3 x 730). The quoted rate shall be inclusive of wages, statutory compliances (EPF/ESI as applicable), safety gear, and all incidental charges required for satisfactory execution of the work. | — | — | — | 16,49,179.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS1113.03.2026.pdf
ATTACHMENT
ModelsubstationguidelinesandRevisedearthingdrawing_compressed_compressed.pdf substation
ATTACHMENT
EL-LM-25-26-37-RT-2.pdf
ATTACHMENT
ModelsubstationguidelinesandRevisedearthingdrawing_compressed_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .