Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 CrAccepted-AOC H NO 685 NEAR GOVT SR SEC SCHOOL PAKASMA ROHTAK HR 124401 | PAKASMA | ROHTAK | HARYANA | 124401 | ₹5.6 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹6.0 Cr+₹40.4 L (7.25%)Rejected-Finance 1391 SECTOR 57 PART II 122003 | GURUGRAM | HARYANA | 122003 | ₹6.0 Cr+₹40.4 L (7.25%) | 2 | Rejected-Finance L2 |
| 3 | 3₹6.4 Cr+₹82.9 L (14.9%)Rejected-Finance SCF 44 MODEL TOWN NARWANA 126116 | JIND | HARYANA | 126116 | ₹6.4 Cr+₹82.9 L (14.9%) | 3 | Rejected-Finance L3 |
| 4 | Rejected-Technical H NO 01 H NO 01 SHIV VIHAR GUFA WALA MANDIR GURGAON HARYANA 122001 | GURGAON | GURUGRAM | HARYANA | 122001 | - | - | Rejected-Technical Not-Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Vijay Contractor L1 | TEJWANT RAI GOVT CONTRACTOR L3 | JS SYNERGIES PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | The Structural design and drawing of RCC Drain work will be submitted by the contractor to the department dully vetted from any reputed recognized University as per Directed by Engineer-In-Charge. The cost will be borne by the contractor. The work will be executed as per design drawing approved by department. | 1 | Complete Job | 1,50,000 ₹1,50,000 Lowest | 2,00,000 ₹2,00,000 | 1,75,000 ₹1,75,000 |
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
7 Jan 2026, 5:00 pmClosed
VIKRAM SINGH
Storm Water Drainage
Construction of master storm water drain of size 4.0 x 1.50 Mtr including 0.30 free board
2025_HRY_492578_1
2025E45EEACD CF35 40EB A43E 206986F2AB28717001
Open Tender
Civil Works
Works
180 days
Gurugram
2 documents required · 2 mandatory
₹1,180
₹12.8 L
Yes
23 Feb 2026
23 Dec 2025
8 Jan 2026
23 Dec 2025
7 Jan 2026
23 Dec 2025
The Structural design and drawing of RCC Drain work will be submitted by the contractor to the department dully vetted from any reputed recognized University as per Directed by Engineer-In-Charge. The cost will be borne by the contractor. The work will be executed as per design drawing approved by department.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate]
[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[5.26]Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.26.1]Extra for providing richer mixes up to plinth and at all floor levels. 1. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) [Through Rate]
[6.28.1]Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. 1. All works up to Plinth level. [Through Rate]
[6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_570908.xls
BOQ • 0.29 MB
AD0145741.pdf
Additional Documents • 1.01 MB
OT0145741.pdf
Other Document • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .