Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance | ₹7.4 L | L1 | Accepted-Finance OK |
| 2 | L2₹7.8 L+₹32,196.20 (4.32%)Accepted-Finance | ₹7.8 L+₹32,196.20 (4.32%) | L2 | Accepted-Finance OK |
| 3 | L3₹7.8 L+₹36,888.76 (4.95%)Accepted-Finance | ₹7.8 L+₹36,888.76 (4.95%) | L3 | Accepted-Finance OK |
| 4 | L4₹8.9 L+₹1.4 L (19.0%)Accepted-Finance | ₹8.9 L+₹1.4 L (19.0%) | L4 | Accepted-Finance OK |
Tender Value
₹13.0 L
EMD Value
₹39,090
Closing Date
10 Aug 2026, 4:00 pmClosed
DFO URBAN FORESTRY DIVISION JAMMU
dogra hall
CONSTRUCTION OF COMPOUND WALL WITH GATE AND OTHER POSTS ALONG WITH LANDSCAPING AND EARTH FILLING WORK AT 02 NO. UNDER CONSTRUCTION 5B RESIDANTIAL QUARTERS AT GLADNI FOREST COMPLEX UNDER CAPEX FOR THE YEAR 2026-27
2026_FD_317927_2
Enit No. 17
Open Tender
Civil Works
Percentage
45 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO URBAN FORESTRY DIVISION JAMMU
₹39,090
Yes
11 Aug 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (BOUNDARY WALL) Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil | 64.14 | Cum | 479.3 | ₹30,742.3 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 5.34 | Cum | 4,826.5 | ₹25,773.51 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 53.45 | Cum | 5,733.6 | ₹3,06,460.92 |
| 4 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in super structure Cement mortar 1:6 ( 1 cement : 6 fine sand) | 30.58 | Cum | 7,571.55 | ₹2,31,538 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level Qty vide item no:-6 | 30.58 | Cum | 1,455.65 | ₹44,513.78 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 196.47 | Sqm | 286.35 | ₹56,259.18 |
| 7 | 15mm Cement plaster mix: 1 : 6 ( 1 cement : 6 fine sand) | 374.72 | Sqm | 306.85 | ₹1,14,982.83 |
| 8 | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.1 mm thick, | 374.72 | Sqm | 138.1 | ₹51,748.83 |
| 9 | Finishing walls with water proofing cement paint of required shade on
New work (two or more coats applied @ 3.84 kg/10sqm) | 374.72 | Sqm | 98.75 | ₹37,003.6 |
| 10 | Carriage of material Sand av.20 KM | 26.46 | Cum | 409.64 | ₹10,839.07 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1044536.xls
BOQ • 0.29 MB
Corrigendum.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .