| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.0 LAdmitted-Finance | -20.22% | ₹78.0 L | L1 | Admitted-Finance |
| 2 | L2₹83.7 LAdmitted-Finance | -14.38% | ₹83.7 L | L2 | Admitted-Finance |
| 3 | L3₹86.2 LAdmitted-Finance | -11.88% | ₹86.2 L | L3 | Admitted-Finance |
| 4 | L4₹95.8 LAdmitted-Finance | -2.03% | ₹95.8 L | L4 | Admitted-Finance |
Tender Value
₹97.8 L
EMD Value
₹2.0 L
Closing Date
5 May 2026, 12:00 pmClosed
EECD V
EECD V IFC Deptt Paryavaran Complex Saidulajab ND-30
Construction of three storey Prajapati Chaupal at Dera Village in Chhatarpur Assembly Constituency AC-46
2026_IFC_290565_1
NIT-7/2026-27/EECD-V/IFCD
Open Tender
Civil Works
180 days
Chattarpur AC-46.
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.0 L
6 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 194 | cum | 177.5 | ₹34,435 |
| 2 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 20 | Metre | 352.15 | ₹7,043 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 194 | cum | 196 | ₹38,024 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil | 56 | cum | 126.8 | ₹7,100.8 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 11 | cum | 2,123.75 | ₹23,361.25 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 21 | cum | 6,812 | ₹1,43,052 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | Cum | 9,895.2 | ₹59,371.2 |
| 8 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) | 16 | Sqm | 410.85 | ₹6,573.6 |
| 9 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. | 5 | per 50 kg | 18.15 | ₹90.75 |
| 10 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 16 | Sqm | 146.15 | ₹2,338.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_385615.xls
BOQ • 0.87 MB
Download all tender documents and submit your bid