| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance 118 NABA MAHJATI ROAD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L1 | Admitted-Finance | ||
| 2 | L2₹3.0 L+₹9,400.35 (3.20%)Admitted-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L2 | Admitted-Finance | ||
| 3 | L3₹3.1 L+₹16,068.73 (5.47%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
21 Sept 2026, 5:00 pmClosed
E.E.-VI
1, HOGG STREET, KOLKATA-87
RESTORATION OF DAMAGED AND DEPRESSED PAVER BLOCK FOOTPATH AT RIPON STREET AND ITS ADJACENT AREA IN WARD NO.62.
2026_KMC_1041920_1
E.E. (C)/ VI/062/005/2026-2027/D
Open Tender
CIVIL WORKS
Percentage
45 days
WARD 62
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
28 Sept 2026
12 Sept 2026
23 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 333.5 | SQM | 50 | ₹16,675 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 100 | MTR | 17 | ₹1,700 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 16.68 | %M3 | 119.27 | ₹1,988.83 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand | 16.68 | M3 | 990.4 | ₹16,514.9 |
| 5 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 333.5 | SQM | 24 | ₹8,004 |
| 6 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 50 | MTR | 8.17 | ₹408.5 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 50 | MTR | 8.17 | ₹408.5 |
| 8 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 1.Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 22.5 | SQM | 10 | ₹225 |
| 9 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (b) 1:4:8 proportion | 26.7 | M3 | 4,373 | ₹1,16,759.1 |
| 10 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 50 | MTR | 21.34 | ₹1,067 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
F6205.pdf
Tender Documents • 0.78 MB
BOQ_2557843.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .