| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.2 LAccepted-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-AOC L1 | |
| 2 | l2₹76.1 L+₹1.9 L (2.61%)Rejected-AOC | l2 | Rejected-AOC L2 |
Tender Value
₹81 L
EMD Value
₹1.6 L
Closing Date
10 Feb 2020, 4:00 pmClosed
Superintending Engineer
139 Mal Road Prtappura Agra
Construction of Retaining Wall Cattal Ghat and VRB at Km. 2.300, Km.5.400 and 7.100 of Terminal Dy.
2020_UPIDC_427116_2
18/SE/2019-2020
Open Tender
Civil Works
Item Rate
90 days
Terminal Dy. at Agra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE Lower Division AGra Canal AGra
₹1.6 L
2 Mar 2021
1 Feb 2020
11 Feb 2020
1 Feb 2020
10 Feb 2020
1 Feb 2020
Amount
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30M including back filling, watering and ramming of excavated earth into the strucutre and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by Engineer in Chagre up to a distance of 30m from the foundation trenches.
C.C. (1:3:6) with coarse sand & 20-40 stone grit in Foundation with all cost of material,labour T&P etc Complete.
Class-150 Brick work in 1:4 cement mortar with coarse sand all cost of material,labour T&P etc Complete.
R.C.C. (1:1.5:3) with cement, approved coarse sand & 10-20mm stone grit all cost of material,labour T&P etc Complete.
Class -150 Brick work in 1:3 cement mortar with all cost of material,labour T&P etc Complete.
Providing Steel Reinforcement(TMT BAR F415) with Bending, binding cutting and placing of reinforcement including cost of binding wire and steel all cost of material,labour T&P etc Complete.
Centering and shuttering with all cost of material,labour T&P etc Complete.
Struck cement pointing in 1:2 C.M with all cost of material,labour T&P etc Complete.
Earth work in removing Bandha with all cost of material,labour T&P etc Complete.
S/Placing E.C. Bags filled with earth sewing by sutli and placing in position with all cost of material,labour T&P etc Complete.
S/F 50mm dia P.V.C. drain pipe with all cost of material,labour T&P etc Complete.
S/F wheel guards with all cost of material,labour T&P etc Complete.
S/F Sign Board with all cost of material,labour T&P etc Complete.
P/F 75 mm. Dia PVC Pipe for weep-hole Avg 1.25 m Long C/C 3.00 m.with all cost of material,labour T&P etc Complete.
P/F 1000 MM Ø RCC Hume Pipe with all cost of material,labour T&P etc Complete.
E/w in Filling For Approch Avg Lead 200 M with all cost of material,labour T&P etc Complete.
P/F 110 mm. Dia PVC Pipe for weep-hole Avg 1.70 m Long C/C 3.00 m.with all cost of material,labour T&P etc Complete.
Dismentling of old Brick Work with all cost of material,labour T&P etc Complete.
Dry Brick Pitching (Brick on Edge ) with all cost of material,labour T&P etc Complete.
Surface Dewtering of Foundation including all arragement in KWH by diesel pump set.
M/s Udaiveer Singh Thekedar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .